Loading…
Loading…
8,324 results • Best match
Repair of Vacuum pump of cooling water system and damaged drainage pipe at Giri Power House
SH Construction of Drainage System with walking track in Govt. Sr Sec School Boys at Hamirpur
Formation cutting, dumping site, construction of retaining/breast walls, cross drainage works, essential soling and parapets.
CONSTRUCTION OF STAGE WITH SHED, RETAINING WALL, DRAINAGE SYSTEM ETC AT KV SCHOOL UNDER GE PALAMPUR
Providing and laying GSB, WMM, BC and cross drainage in km 0/880 to 1/600
Formation cutting, dumping site, construction of retaining/breast walls, cross drainage works, essential soling and parapets
SH- Formation cutting from Km 0-0 to 2-580 of Nag Bintru and 2-00 to 2-700 of Naga Nallah and wire crate for dumping sites
Construction of RCC Kuhal from RD 530 to 547 17 Rmt and Retaining Wall From RD 543 to 560 17 Rmt at Village Phat Kotli near Mashan Nallah
SH Providing laying jointing and testing of HDPE pipes 50mm dia from intake at Chelete nallah to storage tank at Ram Chowk Prini Deposit work SDF 2025 224
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Deli Nala in GP- Deothi under Sainj unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Jhina Nala in GP- Dharchandna under Nerwa unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Boiyaan Nala in GP- Jhokad under Nerwa unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Malawan Nala in GP- Satog under Sainj unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Gharti Nala in GP- Mundli under Nerwa unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Gai Nala in GP- Nerwa under Nerwa unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Sarnaar Nala in GP- Nahol under Sainj unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Chilli Nala in GP- Dhamandri under Sainj unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Hotti Nala in GP- Dhamandri under Sainj unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Namoti Nala in GP- Tikkar under Sainj unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Romu Nala in GP- Halau under Nerwa unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Shagalta Nala in GP- Bhalu under Nerwa unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Thamanda Nala in GP- Kiran under Nerwa unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Khili Nala in GP- Nahol under Sainj unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Richwala Nala in GP- Halau under Nerwa unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Nairi Nala in GP- Bagri under Sainj unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Chapai Nala in GP- Dharchandna under Nerwa unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Khanar Nala in GP- Basadhar under Sainj unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Katyana Nala in GP- Balghar under Sainj unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Kholdhar Nala in GP- Bharanu under Nerwa unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Malva Nala in GP- Nanhar under Nerwa unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Shom Nala in GP- Madhana under Nerwa unit
Construction of Vegetative barriers, Dry Stone Barriers/ structures and crate wire structures, in Ghurar Nala in GP- Tharoch under Nerwa unit
C/o Shantla to Sidh road Km. 0/0 to 1/200 (SH C/o Retaining wall at Rd 0/250 to 0/240, u-shape drain at Rd, 0/225 to 0/240 V-Shape drain at RD. 0/360 to 0/400 , 0/410 to 0/490 and C.C. pavement at Rd. 0/220 to 0/250) under MMSY.
Restoration of rain damages on link road from G.T.B. road to village Baloh km 0/00 to 1/510 SH CC/o V-shape drain at Rd 1/060 to 1/260, U-shape Drain at Rd 0/780 to 1/00, B/wall at Rd 0/970 to 1/00, 1/030 to 1/050, Interlocking Paver Block at Rd 0/
Restoration of Awahdevi Bagwara Gharan Dera Parol road Km 0 00 to 9 750 SH C O U shape drain at RD 3 650 to 400 Under PDNA
Tender for Permanent restoration of 11 KV HT Line at Village She Hat, Lajhogri, Panwa, Anjtighat and LT Line at Village Nagol,Sadanaghat,Nali Chandog,Nali Gussan, and damage due to heavy Storms/Rain on Dated 25/05/2025 under ESD Sarahan
Periodic Maintenance on Kheel Pangna road VR-0075 (SH Providing and Laying 30 mm Bituminous concrete including profile correction, Thermoplastic paint and V-Shape drain in Km 2/00 to 4/00)
P/L CEMENT CONCRETE PAVEMENT FROM KM. 0/360 TO 0/405 and 0/630 TO 0/745) (UNDER DEPOSIT HEAD).
Construction of Sub-structure, Super- structure and both side approaches
SH P/L 30mm thick bituminous concrete in Km. 35/00 to 37/00).
SH Construction of approaches of RCC Culvert
C/O Wire Crate in R/Wall at Rd. 29/820 to 29/900
Laying, jointing and Testing of GI Pipe 20 mm dia460 Rmt 25 mm dia 500 Rmt, 32mmdia300 Rmt and 40 mm dia 700 Rmt at various damages points
Removal of formation deficiencies C o passing places, Missing CDs Side drains, parapets CC pavement, interlocking paver blocks and tarring work
Formation Cutting, Passing Places, R/wall, B/wall CD, Side Drains, Parapets and Tarring work) under PMGSY (Batch-II, 2018-19
Hiring of Sanitation worker for Cleaning of roads, streets, drains, temporary public toilets etc. during Baba Balak Nath Ji Fair 2025
C/O R/wall, B/wall, RCC hume pipe culvert and unlined surface drains between Km. 0/0 to 2/325
Removal of formation deficiencies C/o passing places, Missing CDs Side drains, parapets CC pavement, interlocking paver blocks and tarring work
Removal of formation deficiencies C o passing places, Missing CDs Side drains, parapets CC pavement, interlocking paver blocks and tarring work
Removal of formation deficiencies C/o passing places, Missing CD Side drains, parapets CC pavement, interlocking paver blocks and tarring work