Loading…
Loading…
8,626 results • Best match
Cleaning of branch drain around main P O office back and front side store and garage section under Kathara Washery
Bush cutting, katcha drain cutting, earth removal etc along 1002 conveyor in Piparwar Mine area under Ashok OCP, Piparwar Area.
Cleaning and Renovation/ Repairing of drain situated at different places in IN chandra colony at Gopalichak Colliery under PB Area
Cleaning and removing of sludge of drain near south west corner of Kendua pond to railway siding culvert under RCHP.
Repair of damaged drain in the back side of Devi Mandir, Dakra under Gm Unit of A-C Area, CCL.
Cleaning and removing sluge, silt etc from drain near water tank, pump house, Administrative building and control room under RCHP.
Providing P.C.C and Renovation of Drain for protect of rain water to Sub- Station near Sijua Stadium Sijua Area-5
Repairing and Cleaning of Septic Tank and Drain of Block No. 14 and 15 MOCP Hospital Colony under Lodna Area
Providing RCC slab to cover drain at Lalmatia colony rehab site (plot no-02 to 51 and 05 to 48).
Construction of RCC drain from Kakan Bhagat House to Prasad Saw house in ward no.-18 under Nagar Parishad, Chatra.
Construction of RCC Drain Culvert at Pathalkudwa Islam Nagar from Pathalkudwa Chowk to Md. Sakil house under ward No-16
Construction of PCC Road and RCC Drain in Mahavir Nagar Phase II near Narayan Sahu house under ward No-36
Drain cleaning/trench cutting in slurry stock heap no. 9B and heap no. (near thickener no. iii) of Kathara Washery
Construction of RCC main drain along Lalmatia-Lohandia main road (Chainage 300 mtr) at Lalmatia Colony rehab site..(2nd call)
Repair maint of drain from end to MQ colony to out of north East corner of quarry under Jarangdih Colliery
Repair and maint. Of drain quartedr no MQ-SS-364 to MQ-SS-371 at Babu Colony under Jarangdih Colliery
Providing RCC Slab to cover drain at Lalmatia Colony rehab site (Plot no-02 to 51 and 05 to 48).
Repairing of drain back side of NHS (S/S) Block no. 19 at North Liakdih Colony under Shampur-A Colliery.
Cleaning of branch drain around main P O office back and front side store and garage section under Kathara Washery
Construction of hume pipe drain 300mm dia NP2 Near janta row house park to culvert in ward 30 under AMC
Repair and maintenance of PCC drain at Ambey colony Block no.1, 2, 3 and 4 under CCD, Dhori Area.
Construction RCC Drain at Adarash Nagar, Kokar from house of Dular Chand to house of Satenyendra under ward No-08
Fabrication and erection of weigh bridge (50Te) structure shifting of weights and repairing of associated drain pipes at Kathara Washery
Provision of garland drain and filling of pot holes of mine road under monsoon preparation, Gidi-C Colliery, Argada Area
Repairing courtyard/ drain area on the back side of D/S MQ 1 to 8 Babu colony under Jarangdih Colliery
CONSTRUCTION OF ROAD AND DRAIN IN WARD NO-02 BISHANPUR PRIMARY SCHOOL TO MD. NOSHAD HOUSE UNDER MUNICIPAL CORPORATION GIRIDIH
Provision of garland drain, laying of hume pipe and other allied works under Monsoon Preparation of Sirka OCP, Argada Area.
Cleaning and Repairing of drain to divert rain water of 23/8 Incline of Bhowra (N) Colliery under E.J. Area.
Annual cleaning of Jungle and Grass 05 (Five) times and cleaning of drain 05 (Five) times inside two MRW colonies.
Construction of RCC Drain at Mahaveer Mandir Tanki side quarter no- 2252 to quarter no-2221 under Ward no- 40
Cleaning main drain running along boundary wall of annad Vihar Colony upto low laying area under Gm Unit Piparwar Area.
Cleaning and repairing of 12 nos. septic tank and drain at shiv Mandir colony near Denobli more Under Lodna Area
Construction of PCC road and RCC Drain at Vrindavan Colony and Bank Conly at DTO, Ranchi under ward No-04
Clearing of jungle, drain, garbage etc. at CSO area and different depots of Unified Stores under Dam Division, DVC, Maithon.
Construction of 300mm NP2 drain from to Dev Kr Singh House to Vodafone tower in Ward No. 04 under AMC
Construction of PCC Road, RCC Culvert and RCC Drain along both sides of the road at PCW under EWZ Area
Construction of 450mm NP2 Hume pipe drain from Durga Enclave II to Srinath University in Ward No. 16 under AMC
CONSTRUCTION OF RCC DRAIN WITH SLAB FROM DR. AMOD MISHRA CLINIC TO T.O.P RAUTARA CHOWK IN WARD 3.UNDER NPG
Heightening of existing drain with back side of B type 203 units of CISF colony under GM Unit Piparwar Area.
Construction of RCC branch drain at Lalki bandh Lohandia rehab site under Rajmahal Area.166m (Plot no. 765 to 775)
Construction of RCC Drain at church road from chandrasekhar sahu house to rajesh kumar gupta house under Ward No- 15
Construction of RCC Drain culvert with RCC Slab and Improvement of PCC Road at vijaypath pandra under Ward No- 32
Construction of RCC drain with slab From Barwatoli chowk to Radha Marble(Collage Road) at Ward no -19 and 23
Construction of RCC Drain with cover slab from plot no. 32A to 38 at Hatia rehab site under Rajmahal Area.
Construction of RCC Drain with cover from Suchna Bhawan to Library building at ward no 18 Under Nagar Parishad, Gumla
Construction of RCC Drain at Indrapuri road No-06 from Manish Vaidh house ti Devi Mandap under ward No-31
Construction of Guard Wall at Big Drain Near Andhra Samiti Zone No 1 Birsanagar under JNAC Jamshedpur Distt East Singhbhum
Provision of Garland drain, Provision of pump shed and float controller under monsoon preparation works under Gidi-C, Argada Area.
Construction of 400 m Catch drain and provision of Hume pipes for Monsoon preparation work at Tetariakhar OCP, Rajhara Area.
Cleaning of drain near plant boundary wall to Bahrang temple culvert at Kabribad OC mine of Giridih Project Dhori Area.