Laying Rcc pipe in nallah near railway phattak ward no. 7
Construction of Nala from Shop of Ex. MC Lubhaya to Khalsa Hole Sale and drain type-II H/o Fauji to S/o Ex. MC Lubhaya
Improvement of Drainage System in Street R/o Jang Singh and R/o Baldev Singh in Ward No 1
New Construction of Link Road Malewal Balance Length under BADP Scheme From Compaction of earth work upto Premix Carpet including drain,culverts and side drains etc
Rough cost Estimate of Different streets S/S Drain, P/F, Over Drains, P/F of M/Holes from ward no 1 to ward no 10
Clearance of jungle, weed, jala, booti and slush etc. from the inner section of Muradpur drain RD 0-22000 ,Kairon drain between RD 20000-75000, Shahbazpur drain between RD 0-18180 under Kassur Nallah system
Estimate for Clearing Sarkanda weed, jala, booti,etc. from wet drains by machinery for Kuraiwala Enna Khera Malout Link Drain RD 0-63600 and Lundewala Link Drain RD 0-17280 before onset of monsoon season 2020.
Desilting and Removal of River Bed Material From Village Toor/Raji Beli to Eliminate Drainage Congestion and Protect Nearby Residential Areas and Agricultural Land From Potential Flooding And Erosion Dist.Gurdaspur
Estimate for Clearance of Weed, Kalali, Jala, Booti, Sarkanda etc. from the bed of Talwandi Bhai Drain RD 0-36500 (Sub Reach RD 0-7000) and Ferozeshah Drain RD 0-93700
REPAIR TO ATC, TECH HANGER, SECURITY WALL AND STORM WATER DRAIN AT CAB MAMUN UNDER AGE B/R-I OF GE (SOUTH) MAMUN
Desilting and Removal of River Bed Material from Village Toor Raji Beli to Eliminate Drainage Congestion and Protect Nearby Residential Areas and Agricultural Land from Potential Flooding and Erosion Distt Gurdaspur
Desilting and Removal of River bed Material from Village Mamka Khizarr and Raji Beli to eliminate Drainage Congestion and Protect Nearby Residential Areas and Agricultural Land from Potential Flooding and Erosion
Estimate for laying hume pipes connected road Babowal drain from RD 0-6850 out falling into Kassur Nallah at RD 331350/L.
Const. of Nalla from Sadhu Ram house to Walait Ram shop Gulab nagar Ward no. 1
Const of open Nalla from Dullat Patti Gurudwara Sahib to Rambag Road ward No 13 Longowal
P and L of 80mmThick interlocking tiles in widening portion in Rajiv Gandhi Nagar Nalla 3099000
Cleaning of Ganda Nalla of the City from backside of park Chajju Bhatt to P.P.S school
Construction of RCC slab for cover of open nalla from Principal Narinderjeet Singh to Bus Stand
Constructing Water Course Xing at RD 64560 60494 45477 34000 of Aspal Drain
Estimate for strengthening of banks from RD 0 to 7500 of kaurianwali drain
Cleaning weed jala booti sarkanda etc of Khui Khera Drain RD 0 86000
PL C c 60 MM Interlocking Paver Tiles in H/o Baldev Singh to Dhanna Singh and Sub street of construction of drain w. no. 8 and 9 Dhanaula
P/L interlock tile flooring and construction of drain type 1 from h/o Baldeep Singh, Circular Road to Nikka Dr. in Ward No-8, Nagar Panchayat, Lohian Khas.
Providing and laying interlocking paver 80 MM thick in berms both side and construction of drain type-1 and 2 both side from chaina road to Jalal Eye Hospital.
P/L C c 60 MM Interlocking Paver Tiles in Gali Nohar Chand gali Parminder Singh gali Baljeet Dhillon and sub street construction of drain W. no. 7 Dhanaula
Providing and laying interlocking paver 80 MM thick in berms both side and construction of drain type-2 both side from railway fatak to mkt road four seasons palace.
Estimate of Cleaning of Nominee Nallah from RD 25000 to RD 37158 and Choe Nallah from RD 25000 to RD 0 under the juricdiction of Executive Engineer/District Pathankot
Clearance of jungle, weed, jala, booti and slush etc. from the inner section of sohal seepage drain (RD 0-35000), Chabbal drain (RD 0-106000) , Panjwar drain (RD 0-26000) under Kassur Nallah system
Clearing weed, jala, sarkanda, other vegetative material and slush (if any) from the wet bed of Muridke Drain in between RD 0-50250, jorian Drain RD 0-50250 , Haruwal Drain RD 6500-15000, Dharmkot Randhawa Drain RD 0-8000 , Baba Garib Dass Drain
Clearing of weed booti sarkanda and slush if any from Allechak drain RD 0 to 44500 and Chikri Drain RD 0 to 80000 before the onset of monsoon season in Dist Gurdaspur
Silt Clearance form Different Drains/Nallas of N.P. Mudki
Cleaning of sarkanda weed jalla booty etc from Abul Khurana Outfall Drain RD 0 45500 Abul Khurana Drain RD 25907 to 41467
Estimate for construction of 1 No. RCC Check Dam at Khoni Nallah.
Estimate for construction of 5 No. RCC Check Dam at Jallalia Nallah.
Repairing and Desilting of Nallah from Balmiki Mohalla to Khanpuri Gate Hoshiarpur
Construction of Main Nallah from Stadium Gate Dalli to Virdi Agro Industries.
Construction of stone mesring nallah shivala mandhir to near shamshan ghat sujanpur
Desilting of Outer big Ganda Nallah Gurdawra Akalgarh Sahib to Chajju Bhat.
Construction of road along Budha Nallah from Gopal Nagar to MC Limit
Cleaning and De-silting of Nallah at various wards at M.C Sunam
Rejuvenation of Service Lane from Budha Nallah to Jalandhar Byepass both sides.
Construction /Installation of 1 No. PT near Sem Nallah at Basti Bhattian
Estimate for construction of 2 No. RCC Check Dam at Tarna Nallah.
Clearing weed, jala,sarkanda, other vegetative material and slush if any from the wet bed of Jourian drain RD 0-50250, Muridke drain 0-50250, Mashrala drain 0-15000, Haruwal drain RD 6500-15000 and Dodwan drain 0-12500 before the onset of monsoon s
Clearance of Weed, Kalali, Jala, Booti, Sarkanda etc. from the bed of Makhu Drain from RD 4000-59300, Mauzgarh Drain RD 0-59000 and Makhu-Maujgarh Link Drain RD 0-7500.
Clearance of Sarkanda weed Jungle jala booti and slush from inner section of Verka Drain in between RD 7100-21000 Verka Gumtala Link Drain in between RD 0-5500 Jethuwal Link Drain in between RD 0-5500 Gumtala Drain in between RD 0-22000, Dhing Nangal
Estimate for clearance of sarkanda, weed, jala, booti and deela etc. from Jasraur Link Drain RD 0-16500 outfalling in Budhi Nallah including below Pucca Structure for the year 2025-26.
Construction of Drain on Kharar-Kurali section of NH-205 and Chandigarh Kharar section of (Old NH- 95) (New NH-05) and providing and laying Drain covers on Kharar-Banur Tepla Section of NH- 205 A in State of Punjab
Construction of RG For drainage system from Bhag Chakki to Onkar Petrol Pump Front Side Mandi Gobindgarh Road WNo 3 MC amloh
Estimate for Clearing of Sarkanda Weed, Jala, Booti etc. from wet drains by Machinery for Kuraiwala Enna Khera Malout Link Drain RD 0-63600 and Lundewala Link Drain RD 0-17280 before onset of monsoon season 2022.