Loading…
Loading…
9,993 results • Best match
Dev of Hi Tech Cycle Valley Dhanansu construction of Internal concrete road RCC trench for electricity water supply distribution system storm water drainage sewage collection and effluent collection
Desilting of Road Gullies, Manholes, Storm Water Drainage, Recharge Well Chambers and Development of Recharge Bore in Sector 32-A, 33 and Sector 39-A, Samrala Road, Ludhiana.
Estimate for Cleaning Weed Jaala,Sarkanda,Booti etc from Rajasthan Seepage Drain Rd 0-7175,Baba Farid Link Drain Rd 0-14500,Pucca Drain Rd 27200-84472 of Pucca Drainage System.
Estimate for Cleaning weed, Jala,Sarkanda, Booti Ect. form Rajasthan Seepage Drain RD 0-7175, Baba farid Link Drain RD 0-14500,Pucca Drain RD 27200-84473 of Pucca Drainage system
PROVISION OF STORM WATER DRAIN BEHIND P-41, P-39 AND 15 PUNJAB PT GROUND, PROVISION OF STORM WATER DRAIN INSIDE MT SHED, PROVISION OF STEEL GRATING AROUND PT GROUND OF 15 PUNJAB AND CERTAIN REVENUE AND MINOR WORKS UNDER GE (WEST) COLABA, MUMBAI
Drainage of water from Dass aara to Same Nalla
SPECIAL REPAIR TO BLDG NO SM-08 (PERS LINE) OF MIL HOSPITAL AND STORM WATER DRAINAGE SYSTEM AT HQ CWE PATIALA UNDER GE NORTH PATIALA
Estimate for Constructing W.C crossing at RD 27230 of Pucca Drain
Providing Storm Water Drainage Construction of Desilting Chambers Drilling and Installation of Tubewells for Rain Water Recharging and Construction of Recharging Structures in Lehal Mandal Site Nabha Road Patiala
Construction / Repair of manhole and road gullies of storm water drainage on 150 feet wide sector 77/88, 78/87, 79/86 and 80/85 Dividing road at S.A.S.Nagar.
Cleaning of Nallah/Drains in various parts of City
Operation and maintenance of Storm Water Drainage Scheme including operation of Floor Pumps on 200 feet wide road from Sec 73/74 junction to NH 5 Chandigarh Kharar road, S.A.S.Nagar
DESILTING/CLEANING OF ROAD GULLIES CONSTRUCTED ON STORM WATER DRAINAGE LINES ON A-ROADS OF UE PHASE-1 TO 7, 9 TO 11, SECTOR-48C, 70 AND 71, S.A.S. NAGAR
Operation and Maintenance of Storm Water Drainage Scheme Including Operation of Flood Pumps on 200 feet Wide Road From 73/74 Junction To NH-5 Chandigarh Kharar Road, SAS Nagar
Disitting of Various Nallah and Drains of Nagar Panchayat RajaSansi.
Disilting of Main nallah and adjoining drains in MC Bhogpur
Repair of Cross Drainage Work at RD 38000 of Bist Doab Canal
Clearing of weed jala booti sarkanda other vegetative material and slush (if any) of various drains in sakki nallah system
Clearing of weed jala booti sarkanda other vegetative material and slush (if any) of various drains in Patti Nallah System
DESILTING/ CLEANING OF ROAD GULLIES CONSTRUCTED ON STORM WATER DRAINAGE LINES ON A-ROADS OF UE PHASE-1 TO 7, 9 TO 11, SECTOR-48C, 70 AND 71, S.A.S. NAGAR (YEAR 2025).
Running and Maintenance of Public Health Services in IT Ctiy, SAS Nagar (FY 2025-26) Sub Head Desilting of Road Gully Chambers of Storm Water Drainage Scheme in IT City, SAS Nagar.
PROVIDING AND FIXING OF STANDBY PUMPSET WITH PANEL IN UGSR FOR STORM WATER DRAINAGE AND LAYING OF RISING MAIN 250MM O/D PHASE-11, S.A.S. NAGAR AND ALL OTHER WORKS CONTINGENT THERETO.
Construction of Cross Drainage Work at RD 3185 M of Shahpurkandi Hydel Channel for diposal of rain water of village Rajpura and adjoining area of skilled nature
CLEANING OF COVERED STORM WATER DRAIN FROM KALE MUH WALI BAGICHI TO BHASHA VIBHAG AND DRAIN FROM BHASHA VIBHAGH TO LAHORI GATE EST COST RS. 225.07 LACS
PF RCC slap on Various Drains And Nallah at NP Rajasansi.
Clearance of weed, jungle, jala, booti and slush from inner section of Landa nallah between R.D 0-12500 in Distt. Amritsar
Repair/Maintenance of Fencing, Gate, Storm Water Drain, Footpath and cleaning and maintenance of sewage system in tech area at AF Stn Bhisiana
Clearing of weed jala booti sarkanda other vegetative material and slush (if any) of various drains (Baba Garib Dass) in Sakki Nallah system..
ESTIMATE FOR RECONSTRUCTION OF CROSS DRAINAGE WORK AT RD 8143 OF TUT MINOR
Operation and Maintenance of Storm Water Drainage Scheme Including Operation of Flood Pumps on 200 feet Wide Road From 73 74 Junction To NH 5 Chandigarh Kharar Road, SAS Nagar 01.08.2021 to 31.03.2022
DESILTING/CLEANING AND REPAIR OF ROAD GULLIES CONSTRUCTED ON STORM WATER DRAINAGE LINES ON A ROADS OF U/E PHASE-1 TO 7, 9 TO 11, SECTOR-48C, 70 AND 71, S.A.S. NAGAR.
Operation and Maintenance of Storm Water Drainage Scheme including Operation of Flood Pumps on 200 ft wide road from 73 74 junction to NH 5 Chandigarh Kharar Road, S.A.S.Nagar (For F.Y. 2023-24)
DESILTING/ CLEANING OF ROAD GULLIES CONSTRUCTED ON STORM WATER DRAINAGE LINES ON A-ROADS OF U/E PHASE-1 TO 7, 9 TO 11, SECTOR-48C, 70 AND 71, S.A.S. NAGAR (YEAR 2024).
Construction of Drains/Nala at various sites of City
Annual Maintenance of Storm Drainage Scheme on 200 feet Wide Road From Aerocity / Airport road Junction To Kharar - Banur Road (PR-9) and Storm Water Drainage Scheme on Road no.- 4, 6 and 8 of IT City, SAS Nagar for year 2020-2021
Clearing of weed jala booti sarkanda other vegetative material and slush if any in between RD Patti Nallah 267500 339500 Qadian Drain 0 9500 Khujala main Drain 0 39500 and Harpura Drain 0 17000 before onset of monsoon 2026 falling in Patti Nallah
Annual repair/maintenance of Storm Water Drainage lines on Roads dividing Sector 85/86, 98/99, 104/105, 80/81, 84/85, 99/100, 99/104, 100/104 and 103/104 at SAS Nagar
Construction of Meter room, LT/PT foundation, RCC road, storm water drain, shed for storage and other Misc Civil work at SCL S.A.S Nagar
Kasur Nallah manually
ESTIMATE FOR REPAIR OF CROSS DRAINAGE WORK AT RD 49200 OF BIST DOAB CANAL
Estimate for providing Inlets at RD 27453/R and 27623/R of Kassur Nallah to drain out rain water of village Thathi Jaimal Singh in the Kassur Nallah
Operation and Maintenance of Storm Water Drainage Scheme including Operation of Flood Pumps on 200 feet wide road from 73/74 junction to NH-5 Chandigarh Kharar Road S.A.S. Nagar (For the F.Y. 2026-2027).
Construction of Drain in TibbaBasti
Estimate for Clearance of chocking/ obstruction of various drains and nallah under Juridiction of Tarn Taran drainage cum Mining and Geology Division in District Tarn Taran and Amritsar
CONSTRUCTION OF UGSR FOR STORM WATER DRAINAGE AND INSTALLATION OF 40 HP PUMP SET WITH 62.5 kVA GENSET AND LAYING OF RISING MAIN 250MM O/D PHASE-11, S.A.S. NAGAR AND ALL OTHER WORKS CONTINGENT THERETO.
ESTIMATED COST OF NEW STREET AND DRAINAGE WORK IN WARD NO. 5, 6, 7, 8
Providing Storm Water Drainage at Various Places, Construction of Desilting Chamber Drilling and Installation of Tubewell for Rain Water Harvesting and Rain Water Recharging Structure in Park No 39 Urban Estate Phase-1 and 2 at Patiala
ESTIMATED COST OF NEW STREET AND DRAINAGE WORK IN WARD NO. 13, 14, 15, 16, 17
Cleaning of Nallah from M.P.S.Plant to Drain
Cleaning of storm water nallah (drain) Barnala