Loading…
Loading…
22,991 results • Best match
VELLORE DISTRICT CONSTRUCTION OF NEW DRAINAGE WORK NEAR BY LIBRARY BUILDING IN SENUR COLONY AT SENUR PANCHAYAT(300M)AT KATPADI BLOCK IPHDS 2024-25PACKAGE NO 2
Construction of storm water Drain with culvert at Dheenampalayam from Konguunadu college to Existing culvert in Dhaliyur Town Panchayat
Construction of Storm water drain at ward no-1 Sendapalaym Chairmen House Street in Salangapalayam Town Panchayat
Construction of Storm Water Drain at Ward No.1 Kansapuram Street Kadalaiur Road in Ettayapuram Town Panchayat
Construction of Drain at Mummudi Arumuga Ayyer Nagar H/O Thalaivasal
Supply and Erection of 41nos 8mt post at Anna salai Spencer plaza to whites road and Anna salai flyover to whites in road for Highways Dept Reconstruction of storm water drain work in div 111 , Zone IX area
REPAIR/ MAINTENANCE OF AREA DRAINAGE AND CLEANING OF VEGETATION AROUND DRAINS OF RUNWAY AT RAMNAD UNDER GE TIRUNELVELI
Constrution of Storm Water Drain Ward No 02 Kamaraj Street and Ward No 07 Karatupalayam Road
Construction of Storm Water Drain and Culvert at Ward No.1 AC Nagar 1st Main Street (158001R001), AC Nagar 2nd Main Street (158001R002), AC Nagar 3rd Main Street (158001R003), AC Nagar 4th Main Street (158001R004), AC Nagar 5th Main Street (158001R00
Construction of Storm Water Drain and RCC Culvert 4 Nos in Mahalakshmi Nagar in Varatharajapuram Panchayat at Kundrathur Union of Kancheepuram District Under Peri Urban CMDA 75 Percentage Contribution Fund-25-26 having PKG. No.TNKPM-02/CMDA-75/25-26
Construction of Storm Water Drain at Ward 10, Thelungar Street,Ward 14, Church Street, Ward 14, Near Om murugan House and Ward 14, Nadar Street and Construction Culvert in 11, Nadar Street Near BR Mariyappan House in Vadugapatti Town Panchayat
Construction of Storm Water Drain and RCC Culvert 2 Nos in Baradwaj Nagar Extension in Varatharajapuram Panchayat at KNR Union of Kancheepuram District Under Peri Urban CMDA 75 Percentage Contribution Fund-25-26 having PKG. No.TNKPM-04/CMDA-75/25-26
Construction of Storm water drain from Tiruchi Madurai main road from Ricemill street to Rajarani Palam,from Krrishthuva street to old Register office,from Indian Bank to Church east side,from Indian Bank opposite to RI qua Ponnampatti Town Panchayat
Construction of Storm Water Drain and Culvert at Valluvar nagar Kaliamman Koil street,Kathayammal Nagar Sathya Nagar-1,Anna nagar Cross street - 2,Gandhi nagar Pillayar Koil street - 2,Angalamman Koil St, in Division no - 51 and 52 of Kondalampatty
REPAIRS TO BOUNDARY WALL, COMPOUND WALL, FENCING, GATES, STORM WATER DRAIN, FOOT PATH, CULVERT ETC. AT INSIDE AND OUTSIDE OTA AND REPAIR AND REPLACEMENT OF SEWAGE LINES, MANHOLES, SEPTIC TANKS, FILTER BED AND OVER HEAD WATER TANKS UNDER GE STM CHENNA
Construction of Storm Water Drain and RCC Culvert 1 No in Baradwaj Nagar Extension in Varatharajapuram Panchayat at KNR Union of Kancheepuram District Under Peri Urban CMDA 75 Percentage Contribution Fund-25-26 having PKG. No.TNKPM-03/CMDA-75/25-26
Z.O.XIV.C.NO.E1/2604/2025 Demolition and Reconstruction of storm water drain Culvert of size 1200 x 1200 mm at Thiruvalluvar Nagar Selvavinayagar Koil Street, Anna salai from Nesavalar nagar to Ricemill road Jn. of rajaji street IN DN-191, UNIT-43,
Construction of Storm Water Drain of Size 600x750 mm to avoid water stagnation at 10th Avenue, Ashok Nagar (Reach from Jn of 57th Street 0m to 40m) in Div-131, Unit-31, Zone-10 (Under Ward Councillor Fund 2025-26)
DISMANTLING OF TOP SLAB, DESILTING, RAISING OF DAMAGED STORM WATER DRAIN SIDE WALLS AND CONSTRUCTION OF NEW TOP SLAB AT LAKE AREA 1ST MAIN ROAD FROM LAKE AREA 6TH CROSS STREET TO SCHOOL ROAD IN DIVISION 110, UNIT 24, ZONE 09
Desilting Of Storm Water Drain At Kamala Nehru Nagar 1St Street, Vinayagapuram Main Road ( Brr),Mmda Colony Main Oad,M.M.D.A Colony R Block,Maraimali Adigal Nagar,Kamaraj Nagar 3Rd Street And Kamaraj Nagar 3Rd Street Extn. And Various Street In Div
Z.O.XIV.C.NO.E1/2611/2025 Demolition and Reconstruction of storm water drain Culvert of size 1200 x 1200 mm at Thiruvalluvar Street in Jn. of veerathamman koil east street, Veerathamman Koil West Street in Jn. of jaganathapuram main road IN DN-191,
Construction of Storm Water Drain of Size 600x750 mm to avoid water stagnation at 10th Avenue, Ashok Nagar (Reach from Jn of 57th Street 40m to 80m) in Div-131, Unit-31, Zone-10 (Under Ward Councillor Fund 2025-26)
Z.O.XIV.C.NO.E1/2609/2025 Demolition and Reconstruction of storm water drain Culvert of size 1200 x 1200 mm at Pallavan Nagar Main Road Jn. of pallavan nagar 2nd street, Jayachandran Nagar 1st Main Road in Jn. of Jayachandran Nagar 2nd Main Road191
Construction of storm water drain of size 900 x 900mm at Arcot Road (from Gowri Chithara Appartment to Kumaran Colony Main Road) in Dn-129 and Arcot Road (from 100 feet road to Duraisamy road) in Dn 130 Zone 10
CONSTRUCTION OF STORM WATER DRAIN WITH CULVERT AT 12TH WARD GIRLS SCHOOL STREET,15TH WARD CHRUCH STREET-2 VADIVEL HOUSE TO VEERAMANI HOUSE AND 16 TH WARD CHEKADI STREET(THIRU.VEE.KA NAGAR)VINAYAKAR KOVIL BACK SIDE STREET IN CHINNALAPATTI TOWN PANCHA
Construction of Storm water Drain along Vigneshwara Street Thirumurugan Street Dr Kalki Krisnamurthy Salai LB Road Part 2 Kamaraj Nagar West 2nd main road to Judges Avenue Judges Avenue LB Road to Karamarj Nagar West Canal Bank RoadDn172173 Zone 13
Construction of Storm Water Drain in Guruswamy Nagar 3rd Street , Pudhu thambi Nagar 2nd Street, Pudhu Thambi Nagar 3rd Street, Thiru Nagar Bharathiyar Street and Guruswamy Nagar 7th Street at Ward No.02 Tambaram City Municipal Corporation Zone No.01
Construction of Storm Water Drain and RCC Culvert 3 Nos in Shanthinikethan Nagar in Varatharajapuram Panchayat at KNR Union of Kancheepuram District Under Peri Urban CMDA 75 Percentage Contribution Fund-25-26 having PKG. No.TNKPM-05/CMDA-75/25-26
Construction of Storm Water Drain and RCC Culvert 2 Nos in Singaravelan Nagar in Varatharajapuram Panchayat at Kundrathur Union of Kancheepuram District Under Peri Urban CMDA 75 Percentage Contribution Fund-25-26 having PKG. No.TNKPM-07/CMDA-75/25-26
Construction of Storm Water Drain at Ward No. 11 New Vasanth Nagar 7th Cross 153011R1388 L. 90 m New Vasanth Nagar7th Cross 1st Cross Street 153011R1389 L. 80 m New Vasanth Nagar 3rd Cross 153011S0055 L. 90 m in HCMC
Demolition and re-construction of storm water drain along AGS Colony 7th Cross Street VOC Nagar 3rd Main Road Padmavathi Nagar Main Road Srinivasa Nagar 2nd Street AGS Colony 9th Cross Street Part Srinivasa Nagar 1st Street Dn176 Zone 13
Construction Of Storm Water Drain With Culvert at Ward no 19 Nallanampatty Road 1st Street Ward no 17 Selva Ganapathi 1st 2nd Street Appachivalau Road Ward no 18 Sitharkovil Highways Road Ward no 21 Adhidravidar 1st Street 6th Street 4th Street
Construction of Storm Water Drain at Ward No. 27 Meenakshi Nagar 7th Cross Maruthi Nagar 2nd Cross 1st Street 153027R2447, Length. 80 m Meenakshi Nagar 6th Cross opp Maruthi Nagar 2nd Cross 2nd Street 153027R2448, Length. 50 m in HCMC
Construction of Storm Water Drain at Ward No. 41 Phase 10 37 th Cross L1329 to L 1153 153041R3806, Length. 107 m Phase 10 38 th Cross L 1283 to L 1305 153041R3807, Length. 95 m in Hosur City Municipal Corporation
G F 2023-2024 CONSTRUCTION OF STORM WATER DRAIN WITH CULVERT AT 8TH WRD SANMARKA SANKAM WEST STREET,1ST WARD SOWDEESWARI COLONY MANDAPAM,1ST WARD SIKKANAMPATTI GOUNDAR STREET ,9TH WARD VEERANAN STREET,2ND WARD SEKKAPATTI MAIN ROAD AND REPAIR AND MAIN
Construction of Storm water drain of size 600x750mm at Muthamji Street (Ch-0.00 m to Ch-121.00), Natham Subedar Street (Ch-0.00 m to Ch-120.00) and Maduvankarai 5th Street (Ch-0.00 m to Ch-74.00) in Dn.160, Zone 12.
Construction of Storm Water drain with Cover slab at Sakthivel nagar 5th cross street , Bharathi Nagar 2nd cross street and Relaying of CC Road Surface at Sakthivel nagar 6th street and cross street , Providing BT Road Surface to GayathiriNagar Main
Providing Collecting chamber with necessary pipelines connecting to Existing SWD for non-available storm water drain at Periyar nagar 12th 4th cross street, Jawahar nagar 1st circular road, Siva Elango salai and various streets in Div-68,U-16,Z-6
Raising existing Silt catch pit and providing Pipeline connected nearby Storm water drain at Venkatesan salai, Jeganathan salai, SRP Colony 6th street, Jawahar nagar 1st circular road, 3rd circular road and various streets in Div-68, Unit-16, Zone-6
Widening and improvements from ML to Dual Two lane divided carriageway with paved shoulder at km 90/0-92/900 of Thoppur- Mettur -Bhavani -Erode road (SH-20) including construction of storm water drain and construction of additional High Level Bridge
Demolition and re-construction of storm water drain along Vivekanandha Nagar 1st Street, Gandhi Street, Rajiv Gandhi Nagar Main Street, Rajiv Gandhi Nagar 2nd Street, Rajiv Gandhi Nagar 3rd Street and TV Nagar 12th Main Street Dn.36, Zone 4
Construction of Storm Water drain of size 600x750mm at 5th Block, Agathiyar Salai (From Pari Salai to Maraimalai Adigalar Street), Nehru Street, Kamarajar Street, 3rd Block, Pugazhendhi Salai (6th Street to 8th Street) and 4th Blcok, Pari 1st Cross S
Extension of 18m wide road , construction of RCC storm water drain with footpath , street light system, Thermoplastic lane marking with road studs from M/s.Rajaratan Global wire entrance to boundary of M/s.Kaynes circutes Pvt Ltd at Phase-II, SIPCOT
Construction of Drain at km 12/3 12/6 of Mount Poonamallee Avadi Road
Construction of Drain at Ward no.39, Gandhi Nagar in Hosur City Municipal Corporation
Construction of Drain and Culvert at Hameempuram 7 th street in ward no.50
Construction of Drain at Ward No 12 Papanna Layout in Hosur City Municipal Corporation
Construction of Drain at Nagalamman Kovil to Pallam at Kalappanaickenpalayam H/O Somaiyampalayam Panchayat
Construction of Drain from Geetha house to Paraman house at Puliyamarathupalayam H/o Varapatti
CONSTRUCTION OF DRAIN WITH COVER SLAB AND FOOTPATH AT KERADA IN KETTI TOWN PANCHAYAT