Loading…
Loading…
5,322 results • Best match
Renovation of 03 Nos. toilets at SIB Office Building, Water Proofing Treatment on the Roofs of OCR complex, SIB office along with miscellaneous development/drainage work at Subsidiary Intelligence Bureau Office Cum Residential Complex at H.G. Basak Road, Agartala Tripura.
Earthwork, protection work, WBM2, WBM3, PMC, Drainage work etc.
Subgarde, Soling and drainage work and protection work etc.
Development and construction of road and drain work under AMC Ward No.39.
Construction of pucca drain Stripping excess Soil kuccha drain and other allied works
SH-Patch soling metalling,carpeting in/c pucca drain etc.
SH Soling Pucca drain and other allied works(2nd Call)
SH- Patch soling metalling,carpeting in/c pucca drain etc.
SH- Brick soling, WBM-III, Carpeting, Pucca Drain and etc
Pucca drain, patch soling, patch metalling and patch carpetting etc
Patch metalling, carpetting, sand seal coat and pucca drain etc
Re-carpeting, pot holes repair, road side pucca drain etc.
WBM, Carpeting, Seal coat, pucca drain and other allied works
SH PCC RCC grouting Carpeting Seal coat Pucca drain etc
Patch metalling, re-carpetting, pucca drain etc. Group-I (One).
SH- Brick soling, WBM-III, Carpeting, Pucca drain and etc.
SH- Partial WBM, Carpeting and road side pucca drain etc.
Pucca Drain, CD, protection work, patch WBM-3, Carpeting etc.
Road side pucca drain and 1 No. Box Culvert (2.0MX2.00M)
Urgent Mtc.of road from Vanghmun to Sabual road from CH.06.50 km to CH. 13.00 km under Jampui hill Sub Division, PWD R and B during the year 2022 2023 SH Patch metalling, grouting, carpeting, seal coating, pucca drain etc. Gr II.
FDR Urgent construction of RCC retaining wall on K.N road Degree College road via Colony School L 3.00 Km under Dasda Sub Division,PWD RandB during the year 2024 25 SH Construction of RCC retaining wall at Ch. 1.40km and Pucca drain etc.
10. FDR to different PWD roads under Amtali PWD RandB Sub-Division during the year 2024 - 25 / SH Patch soling protection work providing and placing GI wire crates restoration of side shoulders mtc of pucca drain providing and placing of CC block pla
Mtc of Road from Bye pass to Kathaltali Bazar via Madhuban Kathaltali School Length 0 point 830 Km under Dukli Sub-Division PWD RandB during the year 2024-25 / SH Patch Soling Patch Metaling Carpeting Road side pucca drain and other allied works
Mtc of Road from Mandai road to Bishrambari via Narayanbari during the year 2025-26 SH Patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (L 0.75 Km, Ch. 1.25 Km to Ch.2.00 Km) Group II.
Maintainance of road from Purba Noagoan Milk Co-Operative to Paschimpara (L 1.00 km) under the jurisdiction of PWD (R and B) Khayerpur Sub-Division during the year 2025-26 SH Grouting, re-carpeting, sand seal coat and road side pucca drain etc.
Mtc. Of road from Vanghmun PS road to PS quarter via Vanghmun Tehshil office under Jampui Hill Sub-Division, PWD(RnB) during the year 2024-2025 SH- Clearing and grubbing road land, Maintenance of earthen shoulder,Pucca Drain, BM, Tack coat, carpeting
Periodical repair of road from Bamutia to Fatikcherra (PMGSY road) (L056), package No. TR-01-15 (Length-6.775 km) under Tripura Nirman Suvarna Jayanti Yojana during the year 2023-24/ S.H- BM, Tack Coat, Carpeting, Seal coat, Road side pucca drain, Si
Mtc. Of road from Pecharthal Laljuri PMGSY road to Bhabana Mandir road via Joypur (L 2.440 Km) From Ch. (0.00 Km to 2.440 Km) during the year 2020 21 SH Patch Soling, Patch Metalling, Patch Carpeting, Protection work and Road side Pucca Drain.
FDR Maintenence of different PWD Roads under the jurisdiction of PWD (R and B) Jirania Sub Division during the year 2024-25 SH Patch brick soling, patch WBM3, patch carpeting, road side pucca drain, PVC weir crates and other allied works Gr III
Const of (i) RCC pucca drain from near the house of Anil Paul at ward 08 (ii) CC Road near the house of Subhash Roy at ward No. 09 under Kumarghat Municipal Council under Kumarghat Municipal Council during the year 2023-24.
Urgent mtc. of Ambassa - Ganganagar road during the year 2025-26/ SH - Construction of 01 (one) no R.C.C Box Cell Culvert (2.00 m x 2.00 m), C.C Retaining/ Protection Wall in/c road side U Shape Pucca drain at Ch. 24.00 Km.
Mtc of Road from Mandai road to Bishrambari via Narayanbari during the year 2025-26 SH Patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (L 0.75 Km, Ch.0.50 Km to Ch.1.25 Km) Group I.
Mtc of road from T.K. road to Cremation ground road under Moharcherra G.P (L-0.85 KM) under the jurisdiction of Teliamura Sub-Division No.I during the year 2026-27/SH- protection work , patch , WBM-3 , pucca drain and re-carpeting work etc.
FDR/Mtc. of road from KMA road near Bagmara Bazar to Balaram under Ambassa Sub-division PWD (RandB) during the year 2023-24 / SH- Grouting, re-carpeting, seal coat and road side pucca drain etc. at Ch. 0.00 to Ch. 0.60 Km.
Flood Damage and restroration of PMGSY handed over road from Sonamura Boxanagar Road to tilla no 1 Link No 049 L 0.837 km under PWD RandB Boxanagar Sub Division during the FY 2024 25 SH WBM Carpeting Seal coat pucca drain Protection wall
FDR Maintenance of ADC H Q to Devsing Thakur Para road and ADC HQ to Dinabandhu Para road and Kalasakti Para road Under the Jurisdiction of Khumulwng Sub-Division PWD(R and B) during the year 2024-25 SH Construction of Pucca Drain..
Mtc. Of Vanghmun-Kanpui road to valley bridge at Sabual under Jampui Hill Sub-Division, PWD(RnB) during the year 2025-26 SH- Clearing and grubbing road land, Maintenance of earthen shoulder,Pucca Drain, BM, Tack coat, carpeting, seal coat etc.(Length
FDR to different PWD roads under Amtali PWD RandB Sub-Division during the year 2024-25 / SH Patch soling protection work providing and placing GI wire crates restoration of side shoulders mtc of pucca drain providing and placing of CC block placing o
Mtc. of Pucca drain i Near Baburbazar market place under Yezakhowra G.P. L 218 m both side ii Sultanpur L 190 m both side iii Rajdharpur 70 m SH Earthwork in excavation, PCC, RCC, filter media etc. during the year 2025 26
Periodical renewal of PMGSY road from Santilal Kaipeng to Jaksia Para (length-5.157 km) under Ompi RD Block during the year 2025-26/ SH- Site clearance, Patch GSB, WBM-II and WBM-III, Grouting, Re-Carpeting, Sand seal coat, Pucca Drain, Protection wo
Urgent replacement of damaged slab culvert on the Adibasighat - Brikshathal road at ch. 0.600km under Dasda Sub-Division, PWD(RnB) during the year 2025-26/ SH Dismentling of existing culvert, RCC Box Cell (3.00 m X 3.00 m) and Pucca drain etc.
Mtc. of road from Mantribari Chowmuhani(Fatiqchera-Bamutia Raod) to PMGSY Road and from Amgachia Bazar to PMGSY Road during the year 2025-26/SH WBM-III, recarpeting, seal coat (L-0.46Km), V-Shape Pucca drain(L-135.00Mtr), wingwalls, mtc. Of slab culv
Mtc Road from Anandanagar 6 no para to North Anandanagar Market via Anandanagar 3 no para Balance 430mtr alongwith mtc of approaches for the Steel bailey Bridge at Jalapara SH Pucca drain protection work patch GSB WBM III Carpeting and other allie
Mtc of road from DM Para to Malakuthai Para (Link Route No L-046).(L-2.966km) portion from 2.45km to 2.47 km and 2.75 km to 2.77km during the year 2025-26./SH- Protection work by laying pvc wire crates, pucca drain,etc.
Mtc. of road form Gandacherra Bazar to Gandacherra H.S. School road (L-1.00 km)under Gandacherra Sub- Division , PWD (RandB)during the year 2018-19/SH- Patch WBM-3, carpeting, tack coat, Seal coat, side shouldering, road side pucca drain etc. (2nd
Improvement of road from Srirampur Muslim palli from residence of Bappa Roy To Indira nagar ward No.1 Bibhu Nama L 2.40 km under Chandipur RD Block during the year 2024-25 SH GSB, metalling, carpeting, CD, protection work, pucca drain, etc.
Const. of C.C road from the H.O Sri Ranjit Paul to H.O Sri Haridas paul and from the H.O Sri prabir Chakraborty to H.O Sri Kiran Choudhury and Mtc. of Pucca drain wall near Swami Vivekananda Club under ward No 39,AMC.
Construction of brick soling road and pucca drain st. from near the H.O 1.Pradip Sutradhar 2.Astami Sutradhar 3.Sukumar Das 4.Arati Das 5. Kalipada Das 6.Sukumar Hrishidas 7.Sujit Kar at different places under AMC ward no-26.
Construction of CC gali road with wearing coat and pucca drain with covered slab starting from main road to Sunil Shil via Small wonder house at Happy Valley located opposite side of Auxilium School and Donbosco School Nandan Nagar, under ward no.06,
Development of Road from KCPJalabassa Road to Dharmatilla from CH.0.00KM to CH.0.60 KM Total Length0.60 KM under Damcherra Sub Division, PWD R and B during the year 2026 2027 SH Toe wall WBM III, Grouting, Carpeting, Seal coating, Pucca Drain, Surfac