Loading…
Loading…
5,322 results • Best match
Road development of the road from Dangacherra TSR camp to Fulgunoy para via Ramchandra para from CH. 0.00 km to CH.1.20 km Length 1.20 km under Dasda R.D. Block during the year 2026 2027 SH WBM, carpeting, Seal coating, Pucca Drain etc.
Development of Road from TD Road to Radhakishorepur via Balicherra from CH.0.00 KM to CH.1.00 KM Total Length 1.00 KM under Damcherra Sub Division, PWD RandB during the year 2026 2027 SH WBM III, Grouting, Carpeting, Seal coating, Pucca Drain, Surfac
Mtc of road i) Sonamura Boxanagar road to IBB road via samar smriti Milanayatan(L0.562 KM) ii) Somarstriti PWDRoad to Eidgha maidan (L 150m) during the year 2024 25 SH construction of pucca drain and paver block etc and other allied works
Construction of R.C.C. drain from Hospital road to Taher Miah house (at existing kuttcha nala or drain) at Ward No-07 (seven) under Sonamura Nagar Panchayat during the year 2022-23.
Earthwork, Plain Cement Concrete, Reinforced Cement Concrete, Metalling, Carpeting, Road side pucca drains etc
Construction of Rat proof feed Storage Go-down at Nali Cherra Pig Breeding Farm, under Dhalai District (2nd Call)
Proposed Waterfront Development of Jagannath Dighi at Udaipur, Gomati District, Tripura 2nd Phase, SH Construction of Footpath, Sitting Landscaping Area, Boundary Wall, Peripheral Storm water drain with cross Drainage works, Toilet Block 2 Nos.
Construction of drain and brick soling road from the H.O Dilip Das to H.O Manoj Debbarma via H.O Biswahari Jamatia, under ward no.04, AMC
Construction of drain, paver block and culvert from the H.O Narayan Debnath to H.O Dilip Shil at Subhashnagar Jagat palli Under ward No 43 AMC.
Maintenance of earthen shoulder, brick edging, flat brick soling, WBM-3, maintenance of bituminous surface by brick aggregates and stone aggregates, tack coat, patch carpeting, seal coat, surface drain, road side pucca drain, etc.
GSB,WBM-2,WBM-3,CARPETING,DRAINAGE WORK,PROTECTION WORK.
Road side pacca drain
Mtc of different roads at Mohanpur section under the jurisdiction of Jirania PWD (R and B) Sub-Division during the year 2025-26 SH Patch Grouting, Patch carpeting, Tack coat, Seal coat, Earth filling, Drainage work and other allied works..Gr III
Strengthening of PMGSY road from Machmara Karaicherra to Laljuri Link no 025 L equals to 10 point 006 km under Suvarna Jayanti Tripura Nirman Yojana Scheme during the year 2023 24 SH WBM 3 comma re carpetting comma drainage work comma protect
Strengthening of PMGSY road from Pecharthal to Laljuri road via Iyachincherra Link no 023 L equals to 8 point 908 km under Suvarna Jayanti Tripura Nirman Yojana Scheme during the year 2023 24 SH WBM 3 comma re carpetting comma drainage work co
FDR/Mtc. Of different roads under PWD(R and B) Sabroom Sub-Division during the year 2024-25/ SH -Single bamboo palasiding, Removal of land slide, Road Side Protection, Patch Mattaling, Patch Carpetting, Seal coat, Drainage work etc. (Gr-I) (2nd Call)
Mtc. of Road from Gopal Road(NH08) to Water Treatment plant via Railway over bridge under the jurisdiction of Jirania Sub-Division, PWD(R and B) during the year 2025-26 SH Grouting, Patch-carpeting, seal coat, palasiding, RCC Drainage work etc.
FDR Maintenance of road from Camper Bazar to Border Fencing via Gajaria and other allied roads at AMC Ward No. 38 and 37 under the Jurisdiction of Central VIII subdivision during the year 2024 25 SH Patch Mettalling, Patch Grouting, Drainage work, Ca
FDR Maintenance of A.D Nagar road no. 15 and its allied road inc Surjyapara extension at AMC ward no. 37 under the Jurisdiction of Central VIII subdivision during the year 2024 25 SH Patch Mettalling, Patch Grouting, Drainage work, Carpeting, Seal Co
Muhuri Irrigation Project at kalashi , South Tripura (Diversion Scheme ) / Construction of 1 no. Syphone type Crossing Drainage structure to cross Nala under the Right fork canal at Chainage 6321.00 mtr. (KS-22)
Grouting, carpeting, seal coat, Side berm clearance, pucca drain clearance and surface drain etc.
Grouting, carpeting, seal coat, Side berm clearance, pucca drain clearance and surface drain etc.
Grouting, carpeting, seal coat, Side berm clearance, pucca drain clearance and surface drain etc.
Construction of CD (1.50x1.50) mtr, retaining wall, roadside pucca drain and surface drain etc.
Grouting, carpeting, seal coat, Side berm clearance, pucca drain clearance and surface drain etc.
SH- Road side pucca drain (at 1.50 Mile Bazar) in/c one Cross Drain.
Construction of road side drain etc.
Grouting, Patch Soling, Patch WBM-3, Carpeting with sand Seal coat, RCC Toe wall, CC Block pitching, RCC Pucca Drain, V-shape Pucca drain etc. other allied works.
Construction of drain with cover slab from the i. H.O Khirodh Debbarma to H.O Ananta Jamatia via ii. H.O Archana Chakraborty, under ward no.11, AMC
Construction Of drain and road from house of Sukalyan Roy Sarkar to house of Jayanta Saha under ward no_08, UMC/UDP/2023_24, Total Length 67.75 m
Construction of drain, road by paver block at I. Ripan Sarkar goli, II. Salek Chowdhury goli and III. Pulak Chakraborty goli under Ward No-15, AMC
Construction of drain road by brick soling from H O Mantosh Sarkar to H O Rajan Saha near Pranavananda Vidyamandir School under Ward no-49 AMC
Construction of drain and brick soling road from the H.O Subhankar Acharjee to H.O Sri Chandra Acharjee at S.D Mission colony under ward No 38,AMC.
Construction of drain and protection wall from the H.O Suman Sarkar to H.O Sukhendu Malakar via H.O Chandan Paul at Suryapara under Ward no-37, AMC
Mtc. of road from Mouchak club to Sankar Acharya school. SH Construction of drain, Patch WBM, BM, Carpeting etc. during the year 2022 23 .2nd call
Construction of drain started from H.O Basanti Guha to H.O Pradip Saha at ITI road near Shikshaniketan School Jagatpur, under ward no.07, AMC, 2nd call
Patch Grouting re carpeting pucca drain etc. Ch. 0.00km to 03.50km.
Patch metaling, Re-carpeting, road side pucca drain and allied works.
Patch metalling, grouting , Re carpeting, CD, Pucca drain etc. (Phase-I)
Patch Metalling Grouting Recarpeting road side pucca drain and allied works
Earth Filling , Pucca drain, Brick solling from ch-0.0km to 0.179km.
C.C Work, pucca drain etc from ch. 7.10km to7.30km Gr-II
Earth Filling, Pucca drain ,Brick Solling etc. under Santirbazar Municipal Council.
Patch WBM Grouting Recarpeting road side pucca drain and allied works
Grouting,carpeting,Seal coat and Construction of road side pucca drain.
Patch Soling , WBM , Carpeting , road side pucca drain and allied works.
SH_Patch Metalling,Grouting,Carpeting,Premix seal coat,Construction of pucca drain.
SH- Metalling, Carpeting , Pucca drain etc. during the year 2021-22
Soling, WBM3, Carpeting, Seal Coat, Pucca Drain and other allied works.
Earth Filling, Pucca drain, Brick solling etc. under Santirbazar Municipal Council.