Loading…
Loading…
5,348 results • Best match
Patch metalling, Re-carpeting, Seal coat, Unlined surface drains etc
Patch Soling , WBM , Carpeting , unlined surface drains and allied works.
Construction of pucca drains (Brick work) and other allied works
Recarpeting, Widening, Patch WBM n Grouting, Surface drains, Stripping etc.
Metalling, Carpeting, Road side pucca drains and other allied works
patch soling, grouting, WBM-III,patch carpeting, drains, embankment ete./
Patch Grouting, Patch Carpeting, Patch Soling , unlined surface drains etc.
Re carpeting, patch WBM and grouting, surface drains, stripping etc
Soling work, surface drains, land slide clearance, bats filling, etc
Metalling, Carpeting, Road side pucca drains and other allied works.
SH- Clearing road land, surface drains, patch repairing, carpeting etc.
Metalling, carpeting, Box Cell Culvert, kutcha drain, etc.
Road development work on Noorpur to Sultanpur and various roads SH Construction of RCC drain 1410.00mtr
Road development works on Bongaon to Noorpur road SH Construction of road side drain 500.00 mtr
Constn, of retaining wall with drain in front of Juricherra community hall under Kumarghat R.D Block
Improvement of road by RCC and drain at Pragati Badher Par under Ward No-19, AMC
1. Construction of road side Drain and Culverts at District Hospital Complex, Tepania, Udaipur, Gomati Tripura
Construction of brick masonry drain with necessary allied works near Lal Bahadur Byamagar, Agartala under AMC
Construction of RCC covered drain at Indranagar GB road, under ward no.08, AMC 2nd call
Construction of RCc drain at A.D.Nagar road No.07 under Ward NO.39, AMC(2nd Call).
Maintenance of drain and construction of C.C road of Manish Nag under ward No 39 AMC.
Construction of RCC cover drain at Durgha Chowmuhani Market under Ward No-18, Agartala Municipal Corporation
Construction of cover drain and CC road at South Indranagar, Suryasen road under w-10, AMC.
Construction of pucca cover drain at East Chandmari ward no.06 for passing of rain water
Construction of Cross drain (CD) near Ratan Podder house under Bishalgarh Municipal Council. W/No - 11.
Construction of RCC drain road with slab at Nagerjala pond side under ward No 33 AMC.
Establishment of Centre of Excellence for flower at Lembucherra SH const of surface drain. (2nd Call)
REPAIR AND MAINTENANCE OF DRAIN AT OFFICER MESS OF 124 BN BSF UNDER SHQ BSF PANISAGAR
Repair/ renovation of Cycle stand and const of Drain cover with GCI sheet at Nepaltilla PHC
Maintenance of PWD Road from Mohanpur chachu bazar road to bat tala trijunction via Tamakari ( L- 2.95 km) during the year 2023-24/ SH Patch Grouting, WBM-3, Carpeting, unlined surface drains etc. complete Ch. From 0.0 Km to 1.01 Km./ Gr-I
Maintenance of different roads under the jurisdiction of PWD(R and B) Jirania Sub-Division during the year 2025-26 SH Repair to pot holes by shelmac, patch brick soling, placing of gunny bags, stripping of excess soil, surface drains..Group III
Maintenance of different roads under the jurisdiction of PWD(R and B) Jirania Sub-Division during the year 2025-26 SH Repair to pot holes by shelmac, patch brick soling, placing of gunny bags, stripping of excess soil, surface drains..Gr-II
Maintenance of Road i Damcherra BDO Office Complex Road and BDO Office premises of Length 0.13KM ii Damcherra Hmunpui Road to Natun Para Length 1.10KM under Damcherra Sub Division, PWD R and B during the year 2024 2025 SH Pucca Drains, Potholes Repa
Mtc. of road from Machmara to Kanchanpur road under Jamupui Hill Sub Division PWD(R and B), during the year 2023 24 SH Clearing and grubbing road land, Surface Drains, Patch Metalling, PatchTack coat, Patch Carpeting,Patch Seal coating etc. (Ch.0.00k
Maintenance of PWD Road from Mohanpur chachu bazar road to bat tala trijunction via Tamakari ( L- 2.95 km) during the year 2023-24/ SH Patch Grouting, WBM-3, Carpeting, unlined surface drains etc. complete Ch. From 1.01 Km to 2.05 Km./ Gr-II
Periodical Mtc. of road from Kolibazar to AT road (Kadamtali) via Kasko, Atambhagya road (L-10.00Km) under the jurisdiction of PWD(R and B) Sub-Division No. II, Amarpur, during the year 2022-23 SH - Surface Drains, Patch Soling, Grouting, PMC, Seal C
Periodical maintenance of PMGSY road (L044) from Gurupada Colony to Guru Para (Kwtwipara) (L 2.30 Km) during the year 2022 23 SH patch WBM-III, patch grouting, Re carpetting, Seal Coat, Pucca drains and other allied works under Khumulwng, PWD (R and
Mtc. of different old PMGSY roads (at Kasko area) under the jurisdiction of PWD(R and B) Sub-Division No. II, Amarpur, during the year 2020-21 SH - Site Clearance, Surface Drains, Protection Works, Soling, GSB, WBM-III, Grouting, Carpeting, Seal Coat
Mtc. of road from Gonda Twisa ARDD office to BSF camp road via Laxman Sarkar House (L-0.600 km) under Gonda Twisa Sub-Divn PWD(RnB) during the year 2023-24/SH- Patch WBM-3, re-carpeting, side shoulder levelling, surface drains etc.
MTC. of road from A-N road to Khadernal Garopara road (L- 1.80 km) under Jatanbari sub-division SH -WBM, Soling, Throughout Re-carpeting (L-1.50 km), grouting, sand seal coating, Surface drains, Wire crates etc. during the year 2022-23. (2nd call)
Periodical Mtc. of road from Ashachandrapara to Datachandrapara road (L-5.971Km) and Kasko to Sonacherra road (L-2.60Km) under the jurisdiction of PWD(R and B) Sub-Division No. II, Amarpur, during the year 2022-23 -SH -Surface Drains, Grouting, WBM-I
Maintenance of PWD Road from Mohanpur chachu bazar road to bat tala trijunction via Tamakari ( L- 2.95 km) during the year 2023-24/ SH Patch Grouting, WBM-3, Carpeting, unlined surface drains etc. complete Ch. From 2.05 Km to 2.95 Km./ Gr-III
Periodical renewal of completed PMGSY Road (L-048) from Samprai to Bairagi ( L- 1.05 km) under Tripura Nirman Subarna Jayanti Yojana during the year 2023-24/ SH Patch WBM-3, Carpeting, unlined surface drains etc. complete Ch. From 0.0 Km to 1.05 Km
Mtc. of road from Chellagang Mukh to Chellagang Samatal para (L -2.30 Km) Under Amarpur R D Block /SH-WBM, Soling, Throughout Re-carpeting (L-1.150 km), grouting, sand seal coating, Surface drains etc. during the year 2024-25 (Phase-I ) (From Amar
Mtc. Of road from NH-208(RCC Bridge) to Patichari High School via Madhukrishna Para( L-1.50km) under the juridiction of PWD(RandB) Karbook Sub-division during the year 2025-26/SH-WBM, Re-carpeting, sand seal coating,Surface drains and road protectio
Maintenance of different roads under the jurisdiction of PWD(R and B) Jirania Sub Division during the year 2026-27 SH Repair to pot holes by shelmac, patch brick soling, placing of gunny bags, stripping of excess soil, surface drains, bats filling
Mtc. of different PWD roads within Mohanpur section under the jurisdiction of Jirania Sub-Division, PWD(R and B) during the year 2025-26 SH Grouting, Patch carpeting, seal coat, palasiding, RCC Drainage etc. (Gr II)
Mtc. of different PWD roads within Mohanpur section under the jurisdiction of Jirania Sub-Division, PWD(R and B) during the year 2025-26 SH Grouting, Patch-carpeting, seal coat, palasiding, RCC Drainage, CD work etc.
Improvement of different roads and drainage system under Udaipur Municipal Council area / Chiramill road ( NH-8 to Bhangar par road), GadaChoumuhani to Gomati river bank back side of Housing board complex ( 02nos. lanes)/SH metalling, carpeting