Loading…
Loading…
2,363 results • Best match
Work of Construction and Repairing of plinth and earthing for Distribution TF in EDSD-Raya under EDD-III, Mathura
Work of Construction and Repairing of Fencing and earthing of Distribution TF in EDSD-Raya under EDD-III, Mathura.
Replacement of damaged isolator clamp and fuse set clamp of 33 KV line isolator and fuse set installed at various sub-stations and lightning arrester clamp etc. installed in switch yard.
Chemical type Earthing for different Distribution Transformers in the area of E.U.D.S.D.-Aishbagh under E.U.D.D.-Aishbagh, LESA, Lucknow.
WORK PROPOSED SS BAGHRA AREA INSTALLED 250 KVA AND 400 KVA DT TF PLINTH EARTHING AND FENCING WORK
REPAIR/ REPLACEMENT OF FAULTY ELECTRIC WIRING EARTHING AND CABLE ETC OF B/R-II AREA UNDER GE BABINA
SITC OF DG Set 160 KVA cpcv-IV with Teen Shed foundation Earthing Cabling etc in District Saharanpur
Deep Bore 80 Feet Earthing of Power Transformer in various Division under EUDC-I and IV, Kesco., Kanpur
work for connecting Neutral delta Earthing of various Transformer at 132 KV S/S Dumariyaganj with existing earthmat
33/11 kv substatiuon daha 5MVA t/f working for safty for 33kv VCB control panel and earthing
work for installation of Delta earthing of power TF swithchgear and fabrication and errection of taillless unit for
Deep Bore 80 Feet Earthing of Power Transformer in various Division under EUDC-II and III, Kesco., Kanpur
FOR BORE EARTHING OF SWITCHYARD AT 132 KV SUB STATION DADANAGAR, KANPUR UNDER ETD-I, GOVIND NAGAR KANPUR
Chemical type Earthing for different Distribution Transformers in the area of E.U.D.S.D.-Noorbari under E.U.D.D.-UPTRON, LESA, Lucknow
Special earthing by way of boring and lowering of GI pipe upto water level at 132KV SS Sandila
Chemical type Earthing for different Distrubution Transformers in the area of E.U.D.S.D.-Talkatora under E.U.D.D.-Aishbagh, LESA, Lucknow
Chemical type Earthing for different Distribution Transformers in the area of E.U.D.S.D.-Talkatora under E.U.D.D.-Aishbagh, LESA, Lucknow
MAINTENANCE OF PIPE EARTHING, TRENCHING OF CABLE, WIRING OF LIGHTS IN SWITCHYARD ,DT PROTECTION UNDER EDD VI AZAMGARH
33/11 kv substatiuon ranchad 5MVA t/f working for safty for 33kv VCB control panel and earthing
Neutral Earthing of 5/8/10 MVA T/F at S/s Karari, Vaishkanti, Balakmau Under EDD Kaushambi
Earthing Cable For Traction Motor Type 6FRA6068 as Per Drg. No. TRS/GMO/TM/G-9/025/ECR
Painting of different size earthing CT PT Isolator junction box at 132 KV SS Pasahi under ETD Robertsganj
REPAIR MAINT OF INTERNAL WIRING, FAN AND ALLIED WORKS IN NP AREA AND EARTHING AT AF STATION GORAKHPUR
REPAIR MAINT OF COOLING APPLIANCES, DG SET, STREET LIGHT AND EARTHING AT GRD NCC UNDER GE(AF) GORAKHPUR
COMPREHENSIVE MAINT OF WATER SUPPLY EQUIPMENTS INCLUDING ELECTRICAL COMPONENTS LIKE EARTHING, AVIATION LIGHTS ETC UNDER AGE (I) AYODHYA
COMPREHENSIVE REPAIR AND MAINTENANCE TO LIGHTENING PROTECTION OF BUILDINGS, EARTHING WIRING AND OTHER CONNECTED ITEMS UNDER GE BABINA
WORK OF PIPE TYPE EARTHING AT VARIOUTOWER LOCATION OF 132 KV BARAHUWA-BARHALGANJ LINE UNDER ETD-II , GORAKHPUR
Boring Type Earthing Work at 33/11 KV Sub Station Newada and Banjaran Tanda under EDD-2 Nanpara
Chemical type Earthing for different Distribution Transformers in the area of E.U.D.S.D.-UPTRON under E.U.D.D.-UPTRON, LESA, Lucknow.
WORK OF EARTHING OF SUSPENSION TOWERS AT VARIOUS LOCATION OF 220 KV SAMBHAL GAJRAULA LINE, UNDER ETD AMROHA.
REPAIR/ REPLACEMENT OF FAULTY ELECTRIC WIRING EARTHING AND CABLE ETC OF B/R-I AREA UNDER GE BABINA
Construction of Fire Wall and Delta Earthing Work under Business Plan Head 2025 26 under EDD SADAR Basti
WORK OF WATER LEVEL EARTHING OF VCB AND OTHER EQUIPMENTS INSTALLED AT BHEEKANPUR SUBSTATION UNDER EDD 2 MORADABAD
Custom Bid for Services - earthing audit Similar Category Energy Audit Service - Lumpsum Based Energy Audit Service - Lumpsum Based
Procurement of portable earthing discharge rod and alluminium self supporting ladder at various substations under ETD-IV, Varanasi.
THE LAYING OF EARTHMATE EARTHING FOR 2X5 MVAR AIR COOLED 33KV CAPACITOR BANK AT 132KV S/S AURAIYA
COMPREHENSIVE REPAIR/MAINTENANCE WORK TO DG SETS, CABLES, EARTHING AND OTHER ITEMS AT BABINA CANTT UNDER GE BABINA
Oil leakage,Packing,Gasket Repair in 33/11 KV Power TF Earthing, Guarding etc work in EDD Nagina
SPECIAL REPAIR TO LIGHTENING ARRESTERS AND EARTHING PITS INCLUDING BRAZING AT AF STN BAMRAULI UNDER GE AF BAMRAULI
Providing E and M Work Services at HAF GZB (SH: Misc. Earthing Work at AF Stn Hindan Ghaziabad)
CARBON BRUSH ASSEMBLY FOR WHEEL SET EARTHING EQUIPMENT FOR LHB TYPE COACHES TO RCF .DRG. NO.LW 71239. ALT.NIL
EARTHING SHUNT FOR ROOF & BODY AS PER SR.DEE/RS/GZB DRG. NO. 103/MECH/PTS/79 ALT-2.
Earthing cable for traction motor type 6FRA6068 as per drg, no. TRS/GMO/TM/G-9/025/ECR
EARTHING SHUNT LARGE AS PER SR.DEE/RS/GZB DRG. NO. 656/MECH/PT.93 ALT-NIL REF-2
EARTHING SHUNT LARGE AS PER SR.DEE/RS/GZB DRG. NO. 656/MECH/PT.93 ALT-NIL REF-2
EARTHING SHUNT LARGE AS PER SR.DEE/RS/GZB DRG. NO. 656/MECH/PT.93 ALT-NIL REF-2.
EARTHING SHUNT FOR ROOF & BODY AS PER SR.DEE/RS/GZB DRG. NO. 103/MECH/PTS/79 ALT-2.
Housing complete for earthing brush assembly (for LHB type coaches) as per RCF Drg. No. LW71232 alt-e.
CLIP ASSEMBLY FOR WHEEL SET EARTHING EQUIPMENT (FOR LHB TYPE COACHES) TO RCF DRG. NO. LW71240, ALT. NIL.
Making Guarding and Repairing/Re- Sagging of existing 11 KV Line Guarding and Water Level Earthing of 10x2 MVA T/F and connected VCB Installed at S/s Goverdhan due to uninterrupted power supply on the Occasion of Mudiya Puno Mela EDD-Goverdhan, Mtr.