Loading…
Loading…
2,381 results • Best match
Roof earthing switch (HOM) with key box (BV) as per CLW specification no. CLW/ES/S-6/J and confirming to RDSO Modification sheet no. RDSO/2012/EL/MS/0405 (Rev. O) suitable for Electric Locos. FIRM'S O
Flexible connection on roof for earthing bases of main bushing & DJ to Sl. No. 1 of ELW/BSL Drg. No. ELW/BSL/2/F97.032 Alt. 2 and testing procedure conforming to CLW Specification CLW/ES/C-49 Alt.B
Earthing Shunt for Hood (Center) size 355 mm (L) x 25mm (B) x 5mm thickness (Bridge type) with suitable flat Terminal end (both end) A 15mm Dia Centre hole to be provided on flat terminal end (both en
Earthing resistance screen train bus (POS 381.71) rating 10 Kilo ohms +/- 10%, 25 watt as per CLW Spec. no. CLW/ES/3/SK-4/0014 and Annexure A. Material to be procured from CLW approved source or their
Flexible connection on roof for earthing bases of main bushing & DJ to Sl. No. 1 of ELW/BSL Drg. No.ELW/BSL/2/F97.032 Alt. 2 and testing procedure conforming to CLW Specification CLW/ES/C-49 Alt. B
Carbon bush assembly for wheel set earthing equipment to RCF Drg. No. LW71239 Alt Nil Confirmed to RCF Specification EDTS 101 Rev C Amed.-2 CORR-6, Annx-1. as per Drg.No. RCF Drg. No. LW71239 Alt Nil
Manufacture and supply of 03 x Storage Shelter 30MT Barrel Type size 8 point 84 m x 8 x 5 point 13 height at ridge specification as per Appx A and Appx B, Supply for fixing electrification of Storage shelter 30 MT barrel type all as specified as per ... Havells, Lightning conductor made ... Elect Earthing Set
Replacement of Existing Concealed Internal Aluminum House Wiring of 70 Nos. CType Quarters of BkTPP Township by Copper Wiring Along with Incorporation of Latest Safety Devices Like MCB or RCCB And Repair or Replenishment of Earthing System, CAPEX
REPAIR MAINTENANCE OF SERVICE CONNECTION DISTRIBUTION BOARD BUILDING SUBMAIN WIRING EARTHING FLAME PROOF LIGHT INCLUDING FIXTURE AND FITTINGS AND OTHER MISC WORKS CAMP AREA AND OTHER LOCATIONS OF SUKNA UNDER AGE E/M OF GE SUKNA AT MIL STN
PROVN OF FIVE GREASE TRAPS, ASSOCIATED DRAINS AND NEW CHEMICALS EARTHING PITS AT VARIOUS LOCATIONS OF AF STN BAGDOGRA AND FALSE CEILING AND ASSOCIATED WORKS AT BRIEFING HALL AT 7 AFLU AT AF STN BAGDOGRA UNDER GE AF BAGDOGRA
REPAIR AND MAINT OF LT PANELS, SWITCH GEAR AND ALL TYPES OF SWITCH GEAR EARTHING POLE, PAINTING OF POLES AND REPAIR TO LT OVERHEAD AND LT UG CABLES ETC AT ZONE C AND D AT BARRACKPORE UNDER GE BARRACKPORE
Repairing of existing street light pole through painting, waterproof box change, muffing, Earthing, LT UG faulty cable change and erection new steel tubular pole at Sadhu Ramchand Murmu Sarani (ADDA Guest House to Hemsheela School) under ward no. 22
Carbon brush holder assembly for wheel set earthing equipment for LHB type coaches. RCF Drawing No.:-LW71237 Alt. Nil with latest alteration Mat. Spec.:-EDTS- 101, REV-C, Annexure-1, Corrigendum-10, AMND-4 with latest revision and amendments.
REPAIR AND MAINT OF LT PANELS, SWITCH GEAR AND ALL TYPES OF SWITCH GEAR EARTHING POLE, PAINTING OF POLES AND REPAIR TO LT OVERHEAD AND LT UG CABLES ETC AT ZONE A AND B AT BARRACKPORE UNDER GE BARRACKPORE
REPAIRS/ REPLACEMENT / MAINT OF LT DISTRIBUTION NETWORK, LT PANELS WITH SWITCH GEARS, LT CABLES, FLOOD /SECURITY LIGHT FITTING, EARTHING AND LA AND ALLIED EXTERNAL SERVICES IN WSA AREA AND BLAST PENS AT AF STN KALAIKUNDA UNDER GE (AF) KALAIKUNDA
REPAIR AND MAINT OF LT PANELS, SWITCH GEAR AND ALL TYPES OF SWITCH GEAR EARTHING POLE, PAINTING OF POLES AND REPAIR TO LT OVERHEAD AND LT UG CABLES ETC AT ZONE A AND B AT BARRACKPORE UNDER GE BARRACKPORE
WELCOME MAINTENANCE B/R WORKS REPAIR / REPLACEMENT OF OLD UNSERVICABLE FITTINGS AND DBS REMOVAL OF EARTHING ETC AT A ZONE MD ACCN AND VARIOUS LOCATION UNDER AGE B/R I AND AGE E/M OF GE BENGDUBI MIL STN
REPAIR AND MAINT OF LT PANELS, SWITCH GEAR AND ALL TYPES OF SWITCH GEAR EARTHING POLE, PAINTING OF POLES AND REPAIR TO LT OVERHEAD AND LT UG CABLES ETC AT ZONE C AND D AT BARRACKPORE UNDER GE BARRACKPORE
Installation and commissioning of new sub statation (3.3KV/550V) and 3.3KV O/H line 3PHwith conitunous running earthing form sarpi sub station to sarpi Eco park for provision of power supply arrangment to submersible pump motor at sspur colliery
Repairing of existing street light pole through painting, waterproof box change, muffing, Earthing, LT UG faulty cable change, dismantling of damage steel tubular pole and erection new steel tubular pole at Fhuljhore to Jemua road, under ward no. 25
REPAIR MAINT TO UNSV STREET LIGHT XLPE CABLES FITTINGS REPAIR OF EARTHING UNSV JUNCTION BOX TIMER RELAYS SENSORS FLOOD LIGHT FOCUS LIGHTS SUSPENSION LIGHTS GARDEN LIGHTS UNSV COPING DAMAGE BROKEN POLES BRACKETS UNSV SERVICES WIRE POST TOP LAMPS POLE
REPAIR MAINT TO UNSV STREET LIGHT XLPE CABLES FITTINGS REPAIR OF EARTHING UNSV JUNCTION BOX TIMER RELAYS SENSORS FLOOD LIGHT FOCUS LIGHTS SUSPENSION LIGHTS GARDEN LIGHTS UNSV COPING DAMAGE BROKEN POLES BRACKETS UNSV SERVICES WIRE POST TOP LAMPS POLE
Sole bar bogie earthing arrangement for BVZI wagon as per DRG. No. -WD-072023-S-III item 1 to item 7 , 01 Set consisting items - (i)Earth Link- 02 Nos each size - 8mm (dia) x 700mm (length) (ii)Hex.
SET OF SPARES FOR WHEEL SET EARTHING EQUIPMENT CONSISTING OF 03 ITEMS. 1) STEEL SPRING FOR COVER TO DRG. NO. LW71250, Alt a = 02 Nos./Set . 2) COVER HINGE TUBE TO DRG. NO. LW71253, Alt-Nil = 02 Nos/S
Earthing Cable Complete (LHB Type Coaches) 70 Sq. mm to RCF's Drg. No. LW-71248, Altc , RCF's Spec. No. EDTS-101, Rev.-C with amendment No. 2 and corrigendum No. 1 to 7 with Annexure-1 or latest Accep
PRESSURE DEVICE SPRING FOR EARTHING FOR AXLE BOX OF WAP-5 & WAP-7 THREE PHASE LOCO, AS PER CLW SPECIFICATION NO. CLW/ES/3/0017 ALT-C OR LATEST Up to the tender opening date. Firm's offer-"PRESSURE DEV
Maintenance Kit - 02 for Earthing Equipment, Consist of 5 Items: (1) Housing to RCF Drg. No. LW 71233 Alt-c , Qty-1 No. (2) Cover to RCF Drg. No. LW 71234 Alt-c , Qty-1 No. (3) Blanking Plug
Discharge / Earthing Rod assembly Spec: ETI-OHE-51(9-87) with A C Slip No. 1, STR: CORE-STR-12A, WORKING VOLTAGE 25 KV AC TRACTION , FIBRE GLASS BODY . Accepted firms Make : MAKE IM AS PER DRG IM.107
Flexible connection on roof for earthing bases of main bushing & DJ to Sl. No. 1 of ELW/BSL Drg. No. ELW/BSL/2/F97.032 Alt. 2 and testing procedure conforming to CLW Specification CLW/ES/C-49 Alt. B
WHEEL SET EARTHING EQUIPMENT TO RCF SPEC.NO.EDTS-101, REV-C, AMD-1 , COR-1, 3, 4, 5 & 6. Special Condition : THE SUPPLIER SHALL SUPPLY HEXAGON HEAD SCREW M8 X 30 IN PLACE OF M8 X 25 ACCORDING TO RDSO
Maintenance kit 02 for earthing equipments consist of 5 items to RCF drg. no. Qty/ set 01 nos., Housing LW71233 Alt-b Qty/Set 01 nos. (2) Cover LW71234 Alt-c, Qty/Set 02 nos. (3) Blanking plug LW71236
Maintenance kit 02 for earthing equipments consist of 5 items to RCF drg. no. Qty/ set 01 nos., Housing LW71233 Alt-b Qty/Set 01 nos. (2) Cover LW71234 Alt-c, Qty/Set 02 nos. (3) Blanking plug LW71236
CONTACT ARM IN PAIRS (01 No.RH & 01 No.LH) FOR EARTHING SWITCH (HOM) AS PERDRG. NO. ELW/BSL/3/ F97.029 ALT-1. Firms offer :- material to be supply as per ELBE Drg. No. 8587 and ELBE part No. 8587/1.
Sole bar bogie earthing arrangement for BVZI wagon as per DRG. No. -WD-072023-S-III item 1 to item 7, 01 Set consisting items - (i) Earth Link- 02 Nos, (ii) Hex. HD. Screw M12x30 - 04 Nos, (iii) Plane
Lightning Arester Set Base Plate 2 point 5 Ft Prong copper, Earthing plate copper, GI Coil, Earthing Rod 2 ft, Wire 1 Sqm
GE/BENG/51 OF 2019-20 REPAIR/RENEWAL OF LIGHTENING CONDUCTOR/ARRESTOR, EARTHING WITH EARTHING STRIP, AVIATION LIGHT UNDER GE BENGDUBI MIL STN
Repair and Overhauling Service - ANCHOR DECK FITTINGS BOTTLE SCREW SLIP BLAKE SLIP AND ANCHOR STROPS FITTED AT FOXLE DETERIORATED SAME TO BE RENEWED AS PER SAMPLE AND 32 NOS STANCHIONS EARTHING BONDING STRAP FITTED AT WEATHER DECK DETERIORATED SAME T..
PROVN OF 05X TOILET NEAR JCOs MESS AND OR LINES, PROVN OF RECEPTION CUM SENTRY POST AT MAIN ENTRANCE, PROVN OF SHED ALONG COOK HOUSE, PROVN OF LIGTNING CONDUCTOR AND PROVN OF EARTHING, LIGHTNING ARRESTOR AT BARRACKPORE UNDER GE BARRACKPORE
REPAIR AND MAINT OF SUBMAIN WIRING MCCBs, DBs, BUS BAR BLDG EARTHING AND WALL CABELLING OF MAP PH II AT BMC AND REPAIR/ REPLACEMENT OF EXTERNAL ELECTRIFICATION WORK INCLUDING REPLACEMENT OF STREET LIGHT FITTING AND CONNECTED WORK AT BMC AND HASTINGS
REPAIR / MAINTENANCE OF EARTHING PITS, LA IN TECH AND DOMESTIC AREA AND ALLIED WORKS AND REPAIR / MAINTENANCE OF UG CABLE AND REMOVAL LT OH LINE AT TECH AREA AT AIR FORCE STATION KALAIKUNDA AND DDK RANGE UNDER GE (AF) KALAIKUNDA
REPAIR/MAINTENANCE OF SPD, CABLE LT SWITCH GEARS, PANELS, EARTHING PITS AND ALLIED WORKS AND REPAIR/MAINTENANCE OF LAUNDRY SYSTEM, LIFT, CRANE AND ALLIED WORKS AT AF STATION KALAIKUNDA AT TECH AREA AT AIR FORCE STATION KALAIKUNDA AND DOMESTIC AREA
REPAIR / REPLACEMENT OF LT ACBs, PANELS, POLES, EARTHING, LT UG CABLES AND LT SWITCH GEAR ITEMS, LT ACSR CONDUCTOR, UG CABLES, HIGH MAST POLES, LED LIGHTS, LED STREET LIGHTS AND SOME ALLIED WORKS AT BARRACKPORE MIL STN UNDER GE BARRACKPORE.
REPAIR/RENEWAL/REPLACEMENT/ CONVERSION TO EXTERNAL ELECTRIC SUPPLY WORK EARTHING LT OVER HEAD LINE TO LT UG LINE AND OTHER ALLIED WORK LIGHTENING CONDUCTOR/ARRESTOR AVIATION LIGHT SIGN BOARD SURGE PROTECTOR UNDER AGE E/M AT GE BENGDUBI MIL STN
REPAIRS AND MAINTENANCE OF STREET LIGHTS, FLOOD LIGHTS, PERIMETER LIGHT, SOLAR LIGHTS, LT OH/UG FEEDER, PANEL BOARD, LT CABLE, ELECTRICAL INSTALLATION, EARTHING PITS, LA AND ALLIED WORKS IN TECH AND DOMESTIC AREA AND DDK RANGE UNDER GE (AF) KKD
SPECIAL REPAIR/REPLACEMENT OF STREET LIGHT POLES, UG CABLE, JUNCTION BOXES AND ALLIED WORKS FROM SIGNAL CENTRE ROAD TO CHECK POST NO 03 AND LT PANEL, EARTHING AND ALLIED WORKS OF SAMRA AUDITORIUM AT BINNAGURI MILITARY STATION UNDER GE (N) BINNAGURI
REPAIR AND MAINT OF LT PANELS, SWITCH GEAR AND ALL TYPES OF SWITCH GEAR EARTHING POLE, PAINTING OF POLES AND REPAIR TO LT OVER HEAD AND LT UG CABLES ETC. AT ZONE C AND D AT BARRACKPORE CANTT UNDER GE BARRACKPORE
FIXING OF VTPN DISTRIBUTION BOARD AT MAIN I/C LINE OF 16(SIXTEEN) NOS 3 STOREYS 6 FLATS BUILDING AND FRESH CABLE LAYING FROM VTPN DISTRIBUTION BOARD TO EACH FLAT WITH NECESSARY CONNECTION AND RESTORATION OF BUILDING EARTHING ,IF REQUIRED
PROVN OF TOILET FOR DISABLED STUDENTS AT AF SCHOOL, PROVN OF SHED AT MPATE BAY, PROVN OF FLAME PROOF EXHAUST FAN AND LIGHTS AT VARIOUS POL/TECH ACCN AND PROVN OF CHEMICAL/CONVENTIONAL EARTHING AT CERTAIN LOCATION AT AF STN HASIMARA
Installation of Solar module including structure power conditioning unit, earthing and allied work for power supply to the pump of tuble well proposed to be constructed on the land of Basundhara Uddyan Palan Beneficiary committee at JL No. 253, Plot
REPAIR AND MAINT OF LT PANELS, SWITCH GEAR AND ALL TYPES OF SWITCH GEAR EARTHING POLE, PAINTING OF POLES AND REPAIR TO LT OVER HEAD AND LT UG CABLES ETC. AT ZONE A AND B AT BARRACKPORE CANTT UNDER GE BARRACKPORE