Loading…
Loading…
51,228 results • Best match
Providing and installation of APFC panel for increased power factor at Ramghat sewage pumping station
Providing and installation of APFC panel for increased power factor at Rudrasagar sewage pumping station
Providing and installation of APFC panel for increased power factor at Chakratirth sewage pumping station
SITC of APFC panel at different Pump Houses Associated with Ranjhi Water Treatment Plant Jabalpur
SITC of 60 KVAR APFC panel with allied work etc at GMSD, Periamet, Chennai-03.
SITC OF 200 KVAR APFC PANEL AT NEW GPRA COLONY SUB STATION NH-IV FARIDABAD
PROCUREMENT OF SPARES FOR HT SWITCH GEAR STAGE-IV
Supply Installation Testing & Commissioning of PCC LT Panels
SPECIAL REPAIR OR REPLACEMENT TO LT PANELS AND
PPre-Monsoon Maintenance repair work of electrical installations such as switchgear, transformer, VCB,H.T. Relay,ACB,MCCB, L.T. Starter, control panel including allied works of VT pumps and operation and running routine maintenance of VT pumps at
Pre-Monsoon Maintenance repair work of switchgear, transformer, VCB, H.T. Relay, ACB, MCCB, L.T. Starter, control panel including allied works of VT pumps at 2nd Additional Uttarbhag pumping station under M.D.M.D. PS Baruipur, Block Canning all i
Premonsoon maintenance and repair of electrical installations such as switchgear transformer, VCB HT Relay ACB MCCB LT Starter and control panel including allied works of 3rdACPS CPS ACPS and 2nd ACPS under MDMD at Paschim Chowbhaga PS
250A LT distribution board (Q3), 400A LT Distribution Board (Q3)
REPAIR,MAINTENANCE AND SERVICING OF 11 KV VCB, 500 KVA TRANSFORMER AND LT ACB INSTALLED AT SUB STATION IN BSF CAMPUS BHONDSI UNDER DIG(HQ) FHQ BSF NEW DELHI.
Repairing of 4 nos. 440V, ACB type LT control panel secondary control switch of different type and make of transformers installed at HT SS and river side IWSP SS of CCD, Dhori Area.
REPAIR/REPLACEMENT AND MAINTENANCE OF MISC E/M EQUIPMENT INCLUIDNG BUILDING SECURITY LIGHTS WITH FITTING/FIXTURES AND ALLIED WORKS OF E/M INCLUDING INDOOR LT PANELS, LIGHTNING PROTECTION ,DISTRIBUTION BOARD ,FLOOR PANELS,INSULATION MATS, ACS,
REPAIR/REPLACEMENT AND MAINTENANCE OF MISC E/M EQUIPMENT INCLUIDNG BUILDING SECURITY LIGHTS WITH FITTING/FIXTURES AND ALLIED WORKS OF E/M INCLUDING INDOOR LT PANELS, LIGHTNING PROTECTION ,DISTRIBUTION BOARD ,FLOOR PANELS, INSULATION MATS , ACS,
REPAIR MAINTENANCE OF EM WATER SUPPLY INSTALLATION CLEANING OF OH AND UG TANKS AND EXTERNAL WATER SUPPLY PIPE LINES AND COMPREHENSIVE REPAIR MAINTENANCE OF LT PANEL LT UG CABLE APFC PANEL AND ALLIED WORKS AT NRS AT 31 WEU THANE UNDER GE (NW) MANKHURD
REPAIR/REPLACEMENT/ MAINT OF EXTERNAL ELECTRIFICATION TO UNDER GROUND LT CABLES, LT PANELS, EARTHING, CONTROL PANELS, SERVICE CONNECTION AT TECHNICAL AREA AND DOMESTIC AREA (WMC, MES COLONY, 60 SCIENTIST HOSTEL, OFFICER TRANSIT ACCN) AT GE (I)R and D
Repairing and full overhauling of different switches/Gate-End (A) 03 (Three) nos of Gate end Box Switch Gear of SDLs, (B) 03 (Three) nos of ACB 100A Andrew Yule make switches (controlling switch of different M/Cs), (C) 06 (Six) no. 200A ACB switches
PROVN OF HT ELECTRIC RING MAIN UNIT FOR EXTERNAL ELECTRIC SUPPLY AT NIWARU MIL STN
ANNUAL MAINTENANCE WORK OF RING MAIN UNIT AT SERAGHAT IN JAULJIBI SECTION UNDER EDSD DHARCHULA
ANNUAL MAINTENANCE WORK OF RING MAIN UNIT AT SERAGHAT IN JAULJIBI SECTION UNDER EDSD DHARCHULA
82559/E8 Provn of Ring Main Unit fir SU-30 Sub Station at AFS Thanjavur
SPL REPAIR/REPLACEMENT OF EXISTING UNSV LT PANELS TO UPGRADE NEW LT PANEL AND EXISTING OLD VINTAGE ELECTRICAL LT/STREET LIGHT RCC POLES CONVERT TO NEW STEEL POLE AT N AREA AND HALLOMAJRA AREA UNDER GE CHANDIGARH
REPAIR MAINTENANCE OF WATER SUPPLY DISTRIBUTION OF CI DI GI PIPE LINES AND REPAIR MAINTANANCE REPLACEMENT OF APFC PANEL DISTRIBUTION PANEL MCCB CHANGEOVER SWITCH EARTHING OTHER CONNECTED ELECTRIC WORKS AT ALHILAL MIL STN UNDER GE PALAMPUR
AC Distribution Board 1, AC Distribution Board 2, AC Distribution Board 3, AC Distribution Board 4, AC Distribution Board 5, AC Distribution Board 6
SITC- TDAE LT PANEL PMCC-001 (Q3), SITC-TDAE LT PANEL PMCC-002 (Q3)
Electrical LT panel
REPAIR MAINTENANCE TO LT OH LINES, LT PANEL BOARD, FEEDER PILLAR BOXES, JUNCTION BOXES AND CONNECTED WORKS AT KARU, KARU ZONE II AND REPAIR/MAINT OF SUBMERSIBLE MOTORS/PUMPS AND ALLIED WORKS AT KARU AND SHESHARTHANG AREA UNDER GE 860 EWS
Providing, Installation, Testing and commissioning of ACB Panel with Incoming TP ACB 630 Amp and Outgoing TP MCCB 400 Amp 02 Nos at Paschim Patai Pump Canal in Block Mau District Chitrakoot.
REPAIR/REPLACEMENT OF STARTER PANELS, PUMP HOUSE CONTROL PANELS, SWITCHGEAR SYSTEM AND CONNECTED ITEMS INCLUDING REPAIRS TO FLOOR/WALL TILING, DOORS AND ROLLING SHUTTERS AT AF STN UNDER GE AVADI.
LT SWITCH GEAR AND SUPERVISION OF ERECTION AND
Procurement of Spares for Electroteknica make Switch Gear.
Purchasing of Control Switch Gear etc. Electrical Items
Provision of illumination and central switch Gear (Q3)
ECE Make 11kv 400 amps HT Switch Gear
SUPPLY LT SWITCH GEAR SPARES AT KATPP, JHALAWAR
supply of switch gear starter panel 75 hp
ECE Make 11kv 400 amps HT Switch Gear
SWITCH GEAR - 11 KV Vacuum Interrupter VG-05.
Switch Gear [Plasser Part No:- 2249137EB] Make:- Plasser
Overhauling of various Switch gear and annual maintenance
CONTROL PANEL AS PER SPECIFICATION
Electrical Control Panel for Compressor
STARTER BATTERY CHARGING CONTROL PANEL
FLP High Mast Control Panel
Spares for PAC Control Panel