Loading…
Loading…
8,404 results • Best match
The work for Repairing Overhauling of 11 kv outgoing incoming VCB at 33 11 kv substations under Electricity Distribution Division Puranpur.
Work of water level earthling of 02 no 10 MVA T/F and 11 KV VCB at 33/11 KV ITI
Repair/over hauling and replacement of damaged parts of damaged 11 KV incoming and outgoing VCB installed at various sub-stations.
The work for Repairing Overhauling of 11 kv outgoing incoming VCB at 33 11 kv substations under Electricity Distribution Division Bisalpur.
Repair/over hauling and replacement of damaged parts of damaged 11 KV incoming and outgoing VCB installed at various sub-stations.
EDD Modinagar ke Adhin aane wale EDSD 1 Modinagar me 33 KV ki kharab 06 No VCB ki marammat ka karya
Work of water level earthling of 02 no 10 MVA T/F and 11 KV VCB at in Place EDSD Kailshpur
Repairing of VCB of Capacitor Bank and laying of Cable at 33/11 KV S/S Shakumbari Devi under EDD Behat
Repair/over hauling and replacement of damaged parts of damaged 11 KV incoming and outgoing VCB installed at various sub-stations.
REPLACEMENT OF 11 KV JURJAR VCB PANNEL,BATTERY CHARGER WITH 24 V BATTERY SET UNDER EDD JALALABAD UNDER EDC SHAHJAHANPUR (MVVNL)
EDD Muradnagar ke Adhin aane wale EDSD 3 Muradnagar me 33 KV ki kharab 06 No VCB ki marammat ka karya
Dismantling and Erection of CT and VCB on 33 KV Feeder Birra at 132 KV S/S Sasni under ETD, Hathras
Repairing of 01 NO I/C and 03 NO O/G VCB in the area of EDSD Muzaffarbad under EDD Behat
Running Contract for Repairing of I/C and O/G VCB at 33/11 KV S/S Khurrampur under EDD Behat
FOR OVERHAULING 36 KV VCB AT 220 KV SUB STATION LONI AND132 KV SUB STATION TEELA MODE GHAZIABAD UNDER ETD GHAZIABAD
Repair and Complete overhauling of VCB and other work etc at 132 KV SS Azadnagar Under E T D I Kanpur
Replacement of old and damaged 11 KV VCB and cable at 33/11 KV Sub Station Sarsawa under EDD I Saharanpur
Supply of Decentralized Material for VCB maintenance installed under EUDD Mahanagar under the jurisdiction of S.E.-VI LESA Trans Gomti, Lucknow
The work for Repairing Overhauling of 11 kv outgoing incoming VCB at 33 11 kv substations under Electricity Distribution Division Pilibhit.
maintenance and Repairing work of I/C and O/G VCB at 33/11 KV S/S Khurrampur under EDD BEHAT
EDD Muradnagar ke Adhin aane wale EDSD 1 Muradnagar me 33 KV ki kharab 06 No VCB ki marammat ka karya
For the work installation of VCB Pannel (under the head Business plan-2026-2027) under Electricity Distribution Divison - Jalalabad. District Shahjahanpur
EDD Muradnagar ke Adhin aane wale EDSD 2 Muradnagar me 33 KV ki kharab 06 No VCB ki marammat ka karya
Replacement of 01 No I/C and 03 No O/G VCB in the area of EDSD Nagal under EDD Deoband
Repair/over hauling and replacement of damaged parts of damaged 11 KV incoming and outgoing VCB installed at various sub-stations.
DEU TO REPAIR 10 NO , 11 KV INCOMING AND OUT GOING VCB PAINAL OF 33/11 KV SS I.T.I. EEEDDII SRE
Chemical Earthing of 02 No 10 MVA T/F and 02 No I/C VCB and Control Pannel under EDD Behat
Quantum of works for maintenance of of VCB at 33/11 KV S/S Sonik, Unnao under the EDD-I, Unnao
Installation of 01 No incomming and 03 No Outgoing VCB at 33/11 KV S/S Tota Tanda under EDD Behat
REPAIRING AND GENRALOVERHAULING OF 11 KV VCB INSTALLED AT 33/11 KV SUBSTATIONS IN EDSD-FESU-1, FESU-2 AND AYODHYA
REPLACEMENT OF 10 NOS. 400 KV HITACHI MAKE ACB BY 400 KV GE POWER MAKE 400 KV SF6 GCB AT 400 KV SWITCHYARD OF ANPARA THERMAL POWER PROJECT ANPARA SONEBHADRA
Round the clock and breakdown maintenance of generator seal oil system and hydrogen gas system of units 3,4 of 2x210 MW units 5,6 of 2x250 MW and Routine UpKeeping of 400 KV MCB Control Room, various Electrical Panels etc in EMD-I CTPS,PTPP, Parichha
Molded Case Circuit Breakers (MCCB) as per IS/IEC 60947 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Bidder Turnover, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Past Performance 20 % Bid to RA enabled No Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6345273 Dated : 14-06-2025 Bid Document 1/5 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 19824 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
1.5 tr 5star inverter type split ac (Q3), 2.0 tr 5 star inverter type split ac (Q3), 4.0 kv voltage stablizer (Q3), 5 kva voltgae stblizer (Q3), MS Angle Stand for Outdoor unit of Split A. C (Q3), Extra Refrigerant Piping with insulation for split ... TPN distribution board with ... without MCCB (Q3), ... pole MCCB (16KA) ... A MCCB - ... A MCCB - ... AMP MCCB - ...
Brushless Motors, Electronic Speed Control, Drone Propellers, Intelligent Flight Batteries, Battery Charging Hub, Power Distribution Board, Flight Controller Unit, RC Receiver, Camera Module, Gimbal Dampers, Drone Arms, Landing Gear, Top and Bottom Body Shells, Power Cables, Connectors and Plugs
Routine maintenance of AC Distribution Board Panel, Interpanel cable loop checking, testing ,replacing from ACDB to all SG and TG Panel system equipments in DCS Panel room electronics test bench of Unit No 5and 6, 2X250 MW, PTPP, Parichha.
Molded Case Circuit Breakers (MCCB) as per IS/IEC 60947 (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6283980 Dated : 11-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Refer to Tender Description
Installation of 250 KVA, 11/0.4KV T/F, 11 KV RMU and Replacement of Jarjar/Damaged AB Cable and other System Improvement Works at various Substations under jurisdiction of, EUDD-RB/Naini/ KD/KB, Praygraj
Construction of double circuit cable laying for NIC Yojana Bhawan and dismentaling of existing double pole and erection of 11 KV RMU at in front of Awas Sangh office back of Lal Bahadur Shastri Bhawan
Work of 11 kV VCB Incomming and outgoing in replace, 33/11 KV Electricity sub-station Manikpur, under Electricity Distribution Division-Chitrakoot
Repairing and overhauling of 08 No. VCB with material at different 33/11 KV S/S of EDSD- Ist under EDD Muradnagar.
System Augmentation/Straightening (under 20 Crore Yojana) 11 KV VCB 05 No Incoming and 06 N0 Outgoing at in place EDSD Kailaspur
Various work of business plan 2023-24, 33 CT,PT,LA and 33 KV VCB Change in area EDD RAMPUR MANIHARN SRE
Replacement of 36 KV VCB, Attend the Emergency Breakdown and Replacement of C R Pannel at various sub Station, Under ETD, Bareilly
REPLACEMENT OF OLD AND DEFECTIVE 36 KV OIL C.B.(BHEL MAKE) TO 36KV VCB AT 132KV S/S KUNDESAR UNDER ETD GHAZIPUR
FOR CHECKING, REPAIRING, OPERHAULING and MAINTENANCE OF 11 KV OCB/VCB INSTALLED AT VARIOUS 33/11 KV S/S UNDER EDD- Baheri
System Augmentation/Straightening (under 20 Crore Yojana) Work 11 KV VCB 02 No Incoming and 04 No Outgoing at Place EDSD ITI
work for substation jainbagh ke control room me sthapit incoming or outgoing ki vcb ke marammatikaran ka karye under eudd ii sre
FOR OVERHAULING 36 KV VCB AT 220 KV SUB STATION SAHIBABAD AND 132 KV SUB STATION VAISHALI GHAZIABAD UNDER ETD I GHAZIABAD