Loading…
Loading…
4,363 results • Best match
Decorative Painting after necessary tit bit repairing of different feeder box electrical Panel installed at Eco Tourism Park and Island New town, WBHIDCO
Repair to the electrical panel room at B Block Ground floor within the campus of Khadya Bhavan, 11A, Mirza Galib Street Kolkata-700087.
INSTALLATION OF ELECTRICAL PANEL BOARD WITH ELECTRICAL ACCESSORIES AT GROUND FLOOR FOR NEWLY CONSTRUCTED BOROUGH-VII OFFICE IN WARD NO.63 BR-VII.
REPLACEMENT OF MCCB OF IT DEPARTMENT RAW POWER NETWORK FOR UPS UNDER KMC
UPS, SPD, Isolation Transformer, BMS, LAPTOP, MCCB, Power Cable, Copper earthing Cable, ITC
Repairing of Surface wiring by replacing old surface type conduit pipe with providing / fixing LED fittings and fixtures as required and replacement of old / defective control switches by new MCCB, MCB-DB at Experimental Mill, MP Division, NIRJAFT, Kolkata. (SH: Supply and fixing of 1200 mm ceiling fan.)
Overhauling and repairing of 3 panel 12KV HT Gear Oil type transformer 11/.415KV 315KVA 1no and 200KVA-1no and LT Panel in 11KVA Sub Station at Midnapore CCH.
Augmentation of existing Sub-station with 2X 1000 kVA dry type transformer and main LT panel board for TR-2 and TR-3 at Bikash Bhavan, Salt Lake, Kolkata.
Development Beautification of the site around LT Panel Room by grill paver block etc of PVD Building at 38 Beltala Road Kolkata 700020 during the year of 2025 26
Replacement of the existing old HT single OCB panel and LT panel board with new one and allied Electrical installation work for existing Substation at State Poultry Farm, Tollygunge
Overhauling, cleaning, servicing and checking of main LT cubical Panel comprised of 2 (two) nos. 2000A ACB as incomer and 1 (one) no. 2000A ACB as bus coupler installed at West Bengal State University, Barasat in the district of North 24 Parganas.
RENOVATION OF ELECTRICAL WIRING AND DISTRIBUTION BOARD INCLUDING ELECTRICAL ACCESSORIES OF COMMUNITY HALL AT 17, D.L KHAN ROAD IN WARD NO-71 UNDER BR-IX.
Retrofitting of 6 KV, 800A VCB trolley for Auckland Square BPS.
Electrical Infrastructure work at Ambari Falakata IP, Phase-II--- Electrical Installation work of PHE Pumps, Control Panel and allied work at Ambari Falakata IP, Phase-II (2nd Call)
S I T and C of Microprocessor based fire alarm control panel with allied works of Main building Annex building at Uttarkanya Kamrangaguri in the district of Jalpaiguri.
upplying, fitting, fixing, C.C. Camera all complete for the following scheme as specified below which will be Centrally monitored with control panel at Gokarna Netaji Subhas Uddyan Park.
MANUFACTURING, FABRICATING, SUPPLY AND INSTALLATION OF LT CONTROL PANEL FOR OPERATION OF DELIVERY SIDE 900 MM DIA. BFV AGAINST PUMP NO. 3 AND 4 AT RWPS-III, GRWW
Supply and Installation of New Auto Manual Control panel and different Electro-Mechanical work at Banghihati Muslimpara , Jagannathpur and different P/Hs under Srerampur and Rishra FAWS scheme.
Supply ,delivery and Installation of Control Panel for Araidanga (Zone- II) W/S Scheme PH NO 1 in the District of Malda under Malda Mechanical Division P.H.E Dte.
Supply and installation of manual operated Motor control panel for Majhara water supply scheme (Amdol Pump House-I) of Murarai-II Block under Bolpur Mechanical Division, PHE Dte.
Supply ,delivery and Installation of Control Panel for OLD MALDA BLOCK W/S Scheme PH NO III in the District of Malda under Malda Mechanical Division P.H.E Dte.
Thorough Servicing and replacement of worn-out component of 2 nos. 200 KW, 30 cusec star delta motor control panel at Kalighat Drainage Pumping Station Under BDPS (S_D).
Providing auto cum manual control panel including pumping machinery and related accessories at T.W. No. 3, of Harbhangi water supply scheme of Basanti Block under SMD, PHE Dte.
Supply and installation of manual operated Motor control panel for Kulara water supply scheme (Amdol Pump House-III) of Murarai-II Block under Bolpur Mechanical Division, PHE Dte.
MANUFACTURING, FABRICATING, SUPPLY AND INSTALLATION OF LT CONTROL PANEL FOR OPERATION OF DELIVERY SIDE 900 MM DIA. BFV AGAINST PUMP NO. 5 AND 6 AT RWPS-III, GRWW
Rectification of control panel of HT AVR (250 KVA) at Prakash (Head work site) BRGF(Phase-I), W/S scheme, Block-Onda under Bankura Mechanical Division,PHE Dte.
MANUFACTURING, FABRICATING, SUPPLY AND INSTALLATION OF LT CONTROL PANEL FOR OPERATION OF DELIVERY SIDE 900 MM DIA. BFV AGAINST PUMP NO.1 AND 2 AT RWPS-III, GRWW.
Civil foundation, Supply of Lighting Mast with Accessories, Erection and commissioning of above equipment and materials, Supply of control panel, Supply of LED light suitable for High Mast
Rectification of control panel of HT AVR (650 KVA) at Marar (Head work site) BRGF(Phase-I), W/S scheme, Block-Onda under Bankura Mechanical Division,PHE Dte.
Replacement of automatic PLC control panel and other electro mechanical work at Moyna w/s scheme PH II in the district of Purba Medinipur under MMD PHE Dte.
Supply installation commissioning and trial run of auto cum manual control panel including pumping machinery and related accessories at Sikharbali-II Mamudpur under SMD PHE Dte. Block Baruipur
Dismantling, repairing, overhauling, testing commissioning with changing damaged spare parts due to flashover of 1no incomer and 2nos outgoing for transformer H.T. switch gear at Sub-Station of Garpa booster pumping Station, Howrah.
REPAIR TO EXTERNAL WATER SUPPLY WORK INCL WATER TREATMENT PLANTS, PUMPS, REPAIR TO BORE WELL, VALVE CHAMBERS AND CLEANING OF OVERHEAD TANK, UG SUMPS INCL MAP PH-II AND OTHER LOC AT RASPUNJA AND REPAIR REPLACEMENT OF LT UG CABLE, FEEDER PILLAR BOXES A
REPLACEMENT OF DEFECTIVE CABLE BY NEW ONE INCLUDING SUPPLY AND INSTALLATION OF NEW FEEDER PILLAR BOX FOR DISTRIBUTION OF L.T. POWER FROM SUB-STN. PH-1 TO MAIN FEEDER BOX NEAR ZERO GATE NO-1 WITH SUPPLY OF NEW LED FITTINGS WITHIN GRWW CAMPUS.
Supply and installation of feeder pillar box at ward no.33, Electrical renovation of Statue of Rabindra Nath Thakur and Mahatma Gandhi at ward no.19 and 16, repairing of line and SandF of LED post top lamp at Siliguri college boundary and college cam
Replacement of damaged electrical panel accessories and allied works at Atla water supply scheme Rampurhat I under Bolpur Mechanical Division P H E Dte
Renovation and Renovation of Electrical Installation and Electrical Panel of the Boys hostel and Pharmacy building at Sree Ramkrishna Silpa Vidyapith,Project ID ET252635414S00
Electrical Panel, Cabling, Earthing and Other Related Works At Newly Constructed Health Unit At 96/2, Karl Marx Sarani, Ward No. 80 Borough IX
Shifting Electrical Panel from Lab and reinstallation near skill lab with allied EI work at IRL Kolkata at Dr BC Roy PGIPS Beliaghata Campus.
Additional Construction Of Fire Pump Room, Electrical Panel Room, Cable Trench and D.G. Pedastal In Mahamaya Sishu-O-Matrimongal Kendra In Ward No-09 .
Rewiring to the Electrical Installation DRDC Building 3rd Floor Est. No-2/Deposit/2019-2020(Elect)
Supply, erection, testing and commissioning of 11kV Vacuum Circuit Breaker (VCB) at Sub-Station No.10 (33 kV Sub-station) and Sub-Station No. 12 HT change over panel for both HT Source of Sub-Station No. 4 and Diamond Jubilee Complex Sub-station No.
Construction of one no 10 MVA PTR Foundation along with Cable End Support Structure,One no CT VCB PT foundation along with cable trench and cover slabs and other allied civil works at Chapra 3311 KV Sub Station under Tehatta Division in the District
Repairing and rewinding of 150/5 A, 6.6 KV, 3 Ph Mine Line Make VCB, Andrew Yule make TSU, Crompton Parkinson make Transformer, Alsthom Make French Motor,12.5 HP, 550 V 3 Ph. 720 RPM Motor and Brown Bravery make Motor of Khottadih Colliery
Supply, Installation Commissioning of new 11(Eleven) Nos. of 20 meter High Mast Towers and Control Panels including allied cable Civil works at Three ROs under Haldia DO and Five ROs at Kolkata DO
Servicing and rectification work at 4 panel VCB ,Single Panel VCB, AVR,200 KVA Transformer of 11 KV Sub-station of Parsala water supply scheme under BMD, PHE Dte.
Power Generator - DG Set (up to 900 KVA) (Q2), XLPE Cable 50 Sqmm 3.5 Core, XLPE Cable 35 Sqmm 3.5 Core, MCCB 160 Amps 4P, MCCB 100 Amps 4P, MCCB Enclosure 200 Amps, Excavation in Trenches, Returning and Filling Soil, Removing Excavated Soil, Sand Cushioning for Cables, Brick Covering for Cables, Earthing with GI Plate
1 sq mm 2 core cable, 1 point 5 sq mm 3 core cable, 2 point 5 sq mm 3 core cable, Wall mounted cabin fan, Wall mounted air circulator fan, Digital Voltmeter for electrical panel, Digital Ammeter for electrical panel, LED panel phase indicator, ... TP MCCB , ... FP MCCB , ...
Construction of four storied Academic building at the premises of Road and Building Research Institute, Pailan - SITC of Sub Station, LT Panel, Fittings and Fixtures, LC installation and Compound Lighting.
Electrical installation and renovation work by providing cables LT panel starter panel etc. and servicing of motor of Tail Regulator at 25.09km of TMLC PS NJP Block Rajganj Dist Jalpaiguri