Loading…
Loading…
131 results • Best match
Operation and maintenance of incinetor and ETP at dump site location.
E-Tender for Operation and Maintenance of 250KLD ETP (230KLD ETP and 20KLD STP) plant based on MBBR technology with UASBR installed at Markfed Canneries Village- Chuharwali, District- Jalandhar
Empty Sterile Effluent Transfer Bag, 3.0 Ltr with Coupler/Connector and Cap
Providing Manpower services for Electrical/FireFighting Storekeeping & ETP Services at LPG Plant
Operation and CAMC of STP and ETP plant of NABI and CIAB
Comprehensive Annual Maintenance and operation works of STP and 20 KLD ETP
etender for construction and installation of 50 KLD ETP Plant at GGSMCH Faridkot
Drilling and installation of New Tubewell (near existing ETP) at Verka Mohali Dairy.
ONLINE CONTINUOUS ELECTRONIC MONITORING SYSTEM (OCEMS) FOR ETP FOR 06 COOPERATIVE SUGAR MILLS
RECEPTLE C/A 841- ECCI/ETP/MRPT PT NO - 18010829, DRG NO. 10634219.
Construction of new treatment units and upgradation of mechanical equipments and Laboratory on turnkey basis for an existing 5 MLD capacity Jalandhar CETP, Punjab.
Estimate for Operation and Maintenance of ETP at Slaughter House Near Khanpuri Gate Hoshiarpur
Demolition and removal of scrap debris of old ETP plant at Verka Mohali Dairy
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; OEM, OEM Authorised Service Provider (ASP); Under AMC and functional
MANNING AND OPERATION OF STP, ETP, OIL FIRED INCINERATOR AND ALLIED MAINT WORKS AT NAMS
OUTSOURCING OF HOUSEKEEPING ACTIVITIES OF OLD DAIRY NEW DAIRY AND ETP AT VERKA AMRITSAR DAIRY
Maint/Servicing of STPs, IPS, Central Sewage Pump House and ETP at Faridkot Mil Stn
Custom Bid for Services - DESIGN AND SUPPLY OF ETP INSTLN TESTG COMM AT JALANDHAR IRD
Joining of Sewage of Experimental Dairy Plant of CODST with ETP and Verka DIET, GADVASU, Ludhiana
Custom Bid for Services - Operation and Maintenance of ETP STP WTP Sedimentation Tank and Centralized RO
ETP with of Capacity 15 KLD at Group-A including Operation and maintenance for five Years
Annual rate contract for the supply of Poly Electrolyte and Poly Aluminium Chloride for ETP Plant
tender for operation and maintenance of 22 KLD ETP at nursing college and Hospital at Jalalabad
Comprehensive Annual Maintenance Contract for Effluent Quality Monitoring System. Est Cost Rs. 4.13 lacs dt 22/23.09.2022
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; 0; Functional but outside AMC and Warranty
Operation and maintenance of ETP at Slaughter house (AMC) EST COST RS. 6.80 LACS DT 10/11.08.2020
P/D/C/I/T/C, starting up, stabilization of ETP of 80 KLD based on MBR/SBR followed by UF Technology including all Civil, Electrical, Mechanical, Public Health, Piping, Instrumentation works including dismantling of existing ETP plant etc. Complete in
Operation and Maintenance of Effluent/Sewage Treatment Plant - Complete System; OEM Authorised Service Provider (ASP), OEM; Under AMC and functional
CONSTRUCTION OF STP CUM ETP OF CAPACITY 1 MLD BASED ON ANY SUITABLE SUSTAINABLE and PROVEN TECHNOLOGY INCLUDING DESIGN AND DRAWINGS WITH O and M OF STP CUM ETP FOR 60 MONTHS AFTER COMMISSIONING IN GURU NANAK DEV HOSPITAL AMRITSAR
P/D/C/I/T/C, starting up, stabilization of ETP of 100 KLD based on MBR/SBR followed by UF Technology including all Civil, Electrical, Mechanical, Public Health, Piping, Instrumentation works including dismantling of existing ETP plant etc. Complete i
Operation and Maintenance of Effluent/Sewage Treatment Plant - Repair, Operation and Maintenance of Sewage Treatment Plant at SGRDJ International Airport, Amritsar for 02 years (2026-28); Operation and maintenance; Functional but outside AMC and Warr..
Clearance of Solid Sewerage Waste and Waste Water (effluent) from sewage Disposal well/Manholes at Ganguwal and Kotla.
Revised DNIT for Providing, Insttalling and commissioning of Probe Type ONLINE CONTINUOUS EFFLUENT MONITORING SYSTEM at Makhu Town
Revised DNIT for Providing Installing and commissioning of Probe Tpe ONLINE CONTINUOUS EFFLUENT MONITORING SYSTEM at Talwandi Bhai
ETP with capacity 50 KLD at PILBS, Phase 3B1 SAS Nagar including Operation and Maintenance for five years.
Supply and Erection of ETP plant at Slaughter House Sanjay Nagar, Bathinda including O and M 2 years.
E Tender for Annual Rate Contract for the Supply of Poly Electrolyte Poly Aluminium Chloride for ETP Plant
E TENDER FOR OUTSOURCING OF HOUSEKEEPING ACTIVITIES OF OLD DAIRY NEW DAIRY AND ETP AT VERKA AMRITSAR DAIRY
Operation and Maintenance of ETP at Slaughter house for 24 months Est Cost Rs. 15.92 lacs dt 08/09.05.2023
E TENDER FOR OUT SOURCING OF HOUSEKEEPING ACTIVITIES OF OLD DAIRY NEW DAIRY AND ETP AT VERKA AMRITSAR DAIRY
SITC of HT VCB panel alongwith streetlights and allied external electrical works at STP ETP, PGIMER Satellite Centre, Sangrur, Punjab
Documents Evaluation of bids proof checking of documents of construction agency and fortnightly supervision up to completion of construction and stabilization of CETP with tertiary treatment by UF
Testing of Water Quality - Collection and Testing of Effluent Water Stack Air Samples at Semi Conductor Laboratory Sector 72 SAS Nagar I; Stack Emission Air Testing Stack 1 Stack 2 and Stack 3, Testing of Water Quality - Collection and Testing of ... of Effluent Water ... of Effluent Water ... Trade Effluent Water ... of ETP , ... of Effluent Water ... of Effluent Water ...
Construction of Foundations and RCC Tanks for the work of Upgradation of ETP Plant at Verka Jalandhar Dairy on labour rate
Testing of Water Quality - Collection and Testing of Effluent Water and Stack Air Samples at Semi Conductor Laboratory Sector 72 S A S Nagar I; Stack Emission Air Testing Stack 1, Stack 2 and Stack 3, Testing of Water Quality - Collection and Testing ... of Effluent Water ... of Effluent Water ... Trade Effluent Water ... of ETP , ... of Effluent Water ... of Effluent Water ...
PROVISION OF OCEMS (ONLINE CONTINUOUS EFFLUENT MONITORING SYSTEM) AND CCTV CAMERAS AT 2X3 MLD AND 01X0.4 MLD MBBR TYPE STP UNDER GE (EAST) JALANDHAR CANTT
A1 Broth for Bio digester effluent testing Lab, Shelf Life 24 Months from date of supply & Specification as per attached Annexure Make: HIMEDIA or Equivalent
Construction of Main Pumping Station and Clinical Effulent Treatment Plant (350 KLD) based on any suitable sustainable and Proven Technology including O and M of MPS and CETP for 5 years after commissioning in Govt. Rajindra Hospital and GMCC Patiala
Provision of Exhaust air units with casing and ducting in STP/ETP plant and UPS Room at Main Campus, CIAB, Knowledge City, Sector-81, Mohali-Punjab, India
Dev of Hi Tech Cycle Valley Dhanansu construction of Internal concrete road RCC trench for electricity water supply distribution system storm water drainage sewage collection and effluent collection