Loading…
Loading…
6,728 results • Best match
Custom Bid for Services - 200137606 Ex BHEL Supervisory Services For PP RM and Deployment of Ex WRI welding expert for boiler pass 1 and 2 during OH at NTPC NORTH KARANPURA Similar Category Operation and Maintenance Power House/Power Plant
1.Repairing/straightening of platform by gas heating. 2.Angle and pipe cutting, straightening and welding. 3.Repairing of railing guard straightening and welding. 4.Damage portion engine guard cutting by gas. 5.Engine guard setting and welding b
New plate cutting, setting, welding in side lower and upper plate. 3. Pin hole oval worn out portion welding build up as per size.
Custom Bid for Services - Repair Replacement of Air Ducting line for de dusting of DE system and fabrication Erection and Overhauling of specialized job of Repair maintenance shop of Jaduguda Mill Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
Replacement of worout intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same at unit no. 301 belt conveyor of ROM section at Madhuban Coal Washery under Block-II Area, BCCL.
A. Partial repairing of pump, Motor and Starter shed (BOQ 1-2), B. Fabrication of 3 nos movable Sheds for electrical swich gear installed at different location of mines (BOQ 3-5)w.r.t Konar Exp , BnK Area
Repairing n Fabrication of 04 sets of cutting edge 01 no. for G3, 01 No. for G5 n 02 nos. for float and repairing of mounting holes and blade for G3 grader. of Ashok OCP, Piparwar Area
Fabrication, Manufacture, Inspection, Testing and Delivery of Automatic and Hand operated gates (Pkg. No. SM-205) and CI liner plate, Grated grill and Chimney protective cap (Pkg. No. SM-301) on F.O.R. Bokaro steel plant site basis,
(A)FABRICATION OF BASE PLATE H.T PUMP MOTOR TO BE INSTALLED AT OCP PUMP (B) CASTING AND MACHINING OF CI COUPLING 12 INCH03 NOS.(3 PAYER) AND 14INCH03 NOS. (03 PAIR) AT AKWMC SECTION UNDER KATRAS AREA.
Cleaning, denting, painting and fixing of fluorescent stickers and Repairing of operator cabin , fitment of glasses, operator seat , lock in the motor . Fabrication of end bit, side edge, edge, repairing etc in Motor grader BG825 of Ashok
Dismantling, fabrication, Erection n alignment of underflow and overflow chutes of apron grizzly, two way discharge chutes of 301 A n B belts and the other jobs as per requirement under Raw coal section of Rajrappa washery
Repairing/ fabrication of LHS complete platform, railing guard, side housing, brackets, cracked arm, arm eye hole (02 Nos.) and boom eye hole (02 Nos.) assly. of BE- 1000 Hydraulic Shovel Sl. No. G10121 at BOCP, Sijua Area.
Making /Fabrication of coupling bolts with bush, cooling system of bearing housing, repair of damaged base plate, changing of graphite packings of different sizes and repair of foot valve leather system w.r.t. konar exp. OCP, BnK Area
Repair of head and tail sprocket assy of 522 chain conveyor dismantling, fabrication, erection and alignment of top side and bottom liners, feed and discharge chutes of 522 chain conveyor at Main Washing plant of Rajrappa Washery.
Fabrication and erection of stair and railing angle (50 x 50), channel (100 x 50) and plate (10 mm) etc. with new and old desirable Iron and steel unused in the Fine Coal Section at Kathara Washery.
Replacement , repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection and erection of same unit 1402 belt conveyor in Loading section of Madhuban Coal Washery under Block-II Ar
Fabrication and erection of new HR gate at outlets exit from km 50.640, 52.134, 53.890 of GLMC and R/m of ER Gate at Km 29.353, CR Gate at Km 41.730, of GLMC with five years maintenance.
Fabrication of 02 nos of drum pontoon complete set with MS plate angle channel for installation of 2000 GPM HT pump with heavy motor and multistage turbine pump at Phularitand OCP in Phularitand Colliery under Barora Area
FABRICATION OF ONE BED PLATE, INSTALLATION OF DSM 3 PUMP AND MOTOR AND SAME BED PALTE ON FOUNDATION AT 108 UNIT PUMP HOUSE AND ALSO 3INCH DIA PIPE LEAKAGE REPAIRING AT COAL DUMP COLONY OF KATRAS AREA
Repairing of Track Frame, Frame assly, Brace Arm, Idler Cavity, Repairing of Trunion Ball, Trunion Cap, Trunion cover, Tilt hose cover and fabrication of support of Dozer BD-155 Sl. No. 13632 of Purnadih Project, NK Area
Replacement of wornout intermediate frame and deck plates, installation of idler frame rollers, fabrication and erection of same of unit no. 1301 belt conveyor at PS-9 section of Madhuban Coal Washery under Block-II Area, BCCL.
Fitment of rear view mirror and side view mirror , repair fabrication of rear view mirror stand for 09 nos. BH60M dumpers, 04 nos. water sprinkler, 03 nos. grader and 03 nos. Crane of Ashok OCP, Piparwar Area
Rep./Fabrication of platform, railing guard, rep. of machine housing side wall, housing door and machine housing bottom side hyd. pipe cover straightening and fitting (BE-1000) Hyd. Shovel Sl. No. G10222 at ASBN OCP, Sijua Area
Different types works i.e. replacing of B/D 4000GPM Pump at Sadbhavna pumping, recovery of damaged pipes, extension of pipe, modification of baseplate, fabrication of bends, tapper pipes and leakage repairing in different location of AMP Colliery.
Repair of 02 nos. cylinder parking brake assembly fabrication of grease point in both side bucket pin, machining of 02 nos. side pin and 02 nos. bucket pin bushing of WA800 Komatsu Pay, Loader at Ashok OCP
Repairing and fabrication of boom platform with removal and fitment of trip motor on platform and rep of A-from upper yoke assly. Hole by material filling and all pulley fitment of EKG5A Shovel SI. NO. 564
fabrication ,erection and painting of steel gates with column including raw materials collection from scrap heaps and cleaning bushes, levelling/dressing soil filling in front of Bajrangbali Mandir at Madhuban Coal Washery under Block-II Area, BCCL
Fabrication and erection of new HR gate at outlets exit from km 17.60, 19.60, 28.055, 28.95, 40.92, 42.105, 44.105, 45.270, 47.050, 55.250 and Renovation work of CR gate at Km 44.200 of GRMC with five year maintenance.
Manufacturing / Fabrication, Inspection, Testing and Delivery of Rich Gas Preheater and Steam Trap (Pkg. No. SM-404) and SS Riser pipes and Accessories for Under-firing (Pkg. No. SM-408) and Accessories for Oven Heating (SM-419)
Repairing/ Fabrication and Installation of Safety guard around the Motor area and Tail-end drum of conveyor belt for safety of workman at different unit under ROM Section, Crusher house and loading section of Moonidih Coal Washery.
Repairing and fabrication fire extinguisher stand for 11 nos. Dumpers , 03 nos water sprinkler and cleaning of 06 nos. Diesel tank for G-3, WT-6, WT-6, WT-8, WT-9, T70, T71 of Ashok OCP
Miscellaneous pump spares making and fabrication for day to day running repairing and maintenance works for different pumps along with associated motors of the following installed at Sharda colony, Karipani,Turiyo,Kalyani filter plant and Kalyani riv
Repairing of damaged / worn out Driving Ring Gear (Pt. No.- 018477-2) - 01 no. and Fabrication of Crowd Clutch Friction Discs (Pt. No.- 012272-6) - 02 nos. of 182M Marion Shovel, Sl. No.-221 of AMP colliery.
Replacement of decking device platform by dismantling the old and damaged platform by fabrication and installation of platform at 400mh pit bottom at pocket no. 01 no. and 2 nos. of shaft no. 1 of Moonidih Project
Dismantling cutting transporting fabrication and making of 2nos of used one as rest shelter for operators in feeder breaker No1 and one for spray pump shed in feeder breaker premises for safety purpose at Muraidih AMP Colliery
Dismantling fabrication erection n alignment of existing cable trench with providing and fixing in the gallery of 301 B C 401 B C PS 3 PS 1 2 and PS 4 Electrical Section of Rajrappa Washery Project
(A) Repairing of sprocket drum assembly and its holes and (B) Repairing/ fabrication of battery box with suitable locking arrangement of BD-355 Dozer Sl. No. T-11723, CIL No. 3418, Model BD-355 at Kathara Colliery.
Fabrication and Erection of new stair case from ground reaching up to roof of unit 704 conveyor gallery (along with connecting platform) to facilitate cleaning of spillage coal on roof-top of 704 conveyor at Moonidih Washery.
Replacement of conv. belt of unit no.415,247,227,307 belt conveyor along with repairing and fitting of 130 troughing idler frame with idler and dismantling, repairing, fabrication,erection of diffrnt type troughing,self-alignment of idlers of 304conv
repair/fabrication of both Propeller shaft guard (Front and Rear), Removal of broken stud, dismounting and making of Flange of engine and transmission side, Making of rib in propeller shaft end of dumper 90022 of Purnadih project.
Dismantling of old and Damaged iron Material and Fabrication of New Skip Pocket outer cover Platform Roof and Lower Platform of Skip Pocket of shaft No. 2, 400 MH at Vertical Section of Moonidih Project, WJ Area
Fabrication and painting and commissioning of 02 Nos. pontoon to install 1000 GPM pump motor set for quick dewatering and smooth activities of pump for coming monsoon 2024 at Tapin North Open Cast Project under Hazaribagh Area.
Replacement of defective tail end drum and dismantling of damaged base of tail end drum and fabrication and erection of new base for tail end drum of Feeder Breaker No-1 and 2 of Muraidih, AMP Colliery.
Remaking and fabrication of 02 nos. bed plate casting-machining of 03 pair new C.I coupling and 02 set gun metal bush bearing of RKB 3CHR Pump and RKB 4CHR Pump at Colliery Workshop under Jarangdih Colliery.
Replacement of worn out intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same at 704 belt conveyor of PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL.
Repairing/ Fabrication/ Denting and spray Painting of Dump body, Plate form, railings, ladder etc. of BEML BH-100 T Dumper Sl. NO. D-1309 (CIL No. 11757) and D-1319 (CIL No. 11725) working at Kathara OCP.
Fabrication, erection including raw materials collection and repairing of damaged portion of fencing guard frame, Base frame, Hand rails, Gates, tie angles, rods and removal ,cleaning of coal slurry, broken slab, idle cable, rubbish and scrap mater
Replacement of wornout intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at 1201 middle portion conveyor belt of PS-9 section at Madhuban Coal Washery
Repairing /rebuilding of boom cylinder eye housing, boom foot cylinder eye housing both side and replacement, stick cylinder eye housing rebuilding. Boom cylinder, stick cylinder pins new change and bushing new fabrication of Tata Hitachi, Exc-2955
REPAIRING OF DAMAGED HYDRAULIC OIL COOLER and LH plus RH COOLER FRAME OF IDM30 DRILL NO RD 37 AND FABRICATION OF SILENCER OF 02 TWO NOS IDM30 DRILL NO RD 37 and RD 38 OF RAJMAHAL PROJECT