Loading…
Loading…
6,730 results • Best match
Repairing, fabrication and erection of catch pan (tray), upper structure, screens hanging structure, spring coil, adjustive bolt etc. after dismantling of old and damaged screens tray plate, base structure etc. of unit no. 467 in The Fine Coal Sectio
Rep. of 01No. tilt cylinder, fabrication of 03 Nos. front, middle and rear tilt guard as float with radiator cleaning of Dozer Sl. No. 11997, rep. of winch motor assembly and winch gearbox of crane Sl. No. 1912867at ASBNC
Replacement of damaged intermediate frame, dismantling of idler frame with rollers, and installation and erection of same, fabrication and erection of intermediate frame as at unit no. 1201 belt conveyor at PS-9 section at Madhuban Coal Washery unde
Manufacture/ Fabrication, Testing, Assembly, Inspection and Delivery of ceramic ropes (Pkg. No. SM-753), on F.O.R. Bokaro steel plant site basis, in accordance with Technical Specification No. MEC/S/E254/A/10/C1/0753, required for rebuilding of Coke
Replacement of wornout intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same at unit No. 701-1 belt conveyor at PS-5 building at Madhuban Coal Washery under Block-II Area, BCCL.
Fabrication of two nos. of Sheds for 11 kV Primary control Switch of 11 kV by 440 V Kurpania Transformer, and the 440 V, 800 A A.C.B. Switch at Durga Mandap, Gandhinagar Colony, w.r.t. Bokaro Colliery, under BnK area.
Replacement, repairing of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at 1601 belt conveyor of PS-9 section at Madhuban Coal Washery under Block-
Injector, bracket cover, Tappet cover opening and fitting,repair of failed greasing system, fabrication of engine sump protective guard and repair of transmission line steel tubes and rep. of hydraulic tank and RHS mudguard of D/10352 of AKKOCP.
Replacement of Both track chain, track rollers, sprockets, carrier roller, idler, Rubber pads, repairing of 54nos. Sprocket holes of D155 D21 and Rep/fabrication of end bit (08nos.) , cutting edge (16nos.) applicable for D155 dozer as float at AOCP
Repairing of Mounting of Leveling jack - 04 nos., Drilling platform and guard rubber fitting, both side track chain and Fabrication and fitting of Idler guard - 04 nos. of IDM-30 Drill, SL. No.- 605 (DR-164) of AMP colliery.
Fabrication of 20 nos. Stopper CAT777D,BH60M Dumper and sprinkler Repairing of 02 nos. Hydraulic motor and 02 nos. Centrifugal pump for sprinkler, also engine stand 04 nos. for QSK 19C engine and BS140 engine at Ashok OCP.Refer NIT
Dismantling of damaged from materials of bottom portion of Gallery along with Supporting Structures and repairing the same by Fabrication and fitting through old raw material and also lubrication and exertion of Stringers frame of feeder breaker no 1
Dismantling, shifting, fabrication and erection of worn out MS pipe, support Guard, cyclone base and support guard flange for MS pipe side clamp and dismantling shifting installation, erection of gear box and motor, screen Block Pannel of screen unit
Replacement/repairing of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at 1201 belt conveyor middle portion of PS-9 section at Madhuban Coal Was
Repairing and fabrication chain sprocket teeth making of sprocket spares, (ii) Repairing work of track drive gear box LH Part no. 611A050000013 (iii) Repairing of Track link Assly 011M100000079 LH side of SDL 969 running at 7, 8 incline
Repairing, fabrication and erection of coal tank upper structures, perforated plates, platform etc. in Sec-II of Hydro Cyclone Section after dismantling the same, shifting and stacking the scrap materials from working site to scrap yard at Kathara Wa
Fabrication of water pipeline and fitting and repairing of engine mounting of water tanker Sl.No.437 and dismantling, repairing of center anchor pin and fitting and repairing of oil filter housing and transmission broken bolt removing and new thre
Replacement of Scrapper Chain, Repairing of Head n Tail sprocket assay of 522 chain conveyor, Dismantling, Fabrication, and Erection n Alignment of Top, Side and bottom liners of 522 chain conveyors at Main Washing plant at Rajrappa Washery Project
Operator cabin and Tower rest repairing ,Glass fitting, Power pack denting and Radiator guard fabrication. Repairing of Unloader Valve Assy.,Boom Lift Cylinder and Boom Swing Cylinder of ICM-260 Drill, Sl. No.- 9804776 (DR-184) of AMP colliery.
Replacement of wornout deck plates, fabrication and erection of new deck plates and dismantling, installation and erection of brackets with rollers of unit no. 1402 belt conveyor at Loading section of Madhuban Coal Washery under Block-II Area, BC
Repairing seat of D155 Dozer13494 of both cabin door along with replacement of plasto safety glass, operator seat of Dozer sl no 13494, Design, fabrication and fitting of roll over protection guard of operator cabin safety for D155 Dozer
Dismantling of damaged deck plates, idler frame with rollers, installation, erection of idler frame with rollers, fabrication and erection of same at unit no. 1401 belt conveyor at Loading section at Madhuban Coal Washery under Block-II Area, BCCL.
Dismantling, Shifting of 2000GPM Pump-motor set and Reformation, reorganization, fabrication of motor n pump foundation base frame for running of 170HP, 550V motor n 6UP4 pump (1000GPM) on the old spare base frame including harmonizing with the deliv
Repairing of snub drum of 301B belt and dismantling, fabrication, erection and alignment of deck plates of 404A and 404B Shuttle Conveyor and some portion of side frame of 301B conveyor under Raw Coal Section of Rajrappa Washery Project
Fabrication of accessories of pump i.e. bend, nipple and short pieces of different sizes, Y bend etc. and installation of 2000 GPM pump on the pontoon and final starting of the pump of New Akashkinaree Colliery under Govindpur Area
Replacement, repairing of damaged intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same as unit no. 301 middle portion near road side belt conveyor of ROM section a
Repairing/fabrication and fitting of MS Sheet 4mm at floor of cabin (floor size 8in X20 in) and all around the cabins body with MS Sheet 3mm of cabin (20inX 2in)X 2side , 8inX2inX2side of JH09AY 2245 i.r.o. KOCP
For repairing of center pin hole yoke of main frame and cradle base front pin hole steering eye hole cradle base eye hole and new fabrication of front bumper of ACE Crane JH10AM - 5403 at AKWMOCP, KATRAS AREA, BCCL
Repairing fabrication of track frame idler assembly idler shaft and bushing track roller foundation of undercarriage assembly and repairing of lift cylinder assembly eye and link along with seal replacement and its refitment in dozer Sl No 11900 unde
Dismantling ,fabrication, erection and alignment of side frame of primary crusher A n B side and repairing overhauling of variable speed fluid coupling of apron feeder unit no 103 A n 103 B under Raw Coal section of RWP
New Making, Casting and machining of 350HP motor 1 nos. of glinzer and 2Nos. outer and inner grease cap and fabrication and making of 3nos. of small shed and other miscellaneous mechanical work of Damoda Colliery under Barora Area.
Fabrication and commissioning of 0ne (01) no PVC drum pontoon for one (01) no of pump capacity 1000 GPM to run in the quarry sump for quick dewatering in the upcoming monsoon 2026 at Tapin OCP under Hazaribagh Area.
Work dismantling of damaged iron materials of upper and lower platform along with along with supporting materials and repairing the same by fabrication of old iron materials of feeder breaker No-2 at Kessurgarh, ABOCP Mine, Block-II Area
Dismantling Fabrication and erection/repairing, alignment of take up drum structure of Transfer B/C and ROM B/C and counter weight structure (counter drum) of transfer B/C and ROM B/C in PCH section of Sawang Washery.
Repairing, replacement of worn out intermediate frames and deck plates installation and erection of idler frame with rollers, return rollers, fabrication and erection of same 801-1 drive side belt conveyor of PS-9 section at Madhuban Coal Washery
Replacement and repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1402 belt conveyor tail end side at Loading section at Madhuban Coal washery under Block-
Fabrication and supply of Flag banner Red terry cotton cloth size 193 x 68 cms with a fold on one side for inserting handle of 25mm dia and hemed on other side to BIS Specification No: IS-11248/1995 [
Fabrication and supply of Flag banner Red terry cotton cloth size 193 x 68 cms with a fold on one side for inserting handle of 25mm dia and hemed on other side to BIS Specification No: IS-11248/1995 [
1. Dismantling of complete dumpher assembly after cleaning from outside. 2. Shaft welding, machining and polishing and shaft bearing replacement. 3. Housing welding, machining, grinding and polishing.
1. Broken portion of chassis gausing. 2. Broken portion chassis welding by steel electrode. 3. New plate cutting from grounded machine. 4. Plate welding by steel electrode.
A)Repairing and new making of shelter for transformer Switch Pump motor starter in respect of Amlo railway siding of AADOCM project. B) Fabrication and erection of two number tanker point for providing water to tanker point for dust
Fabrication of steel rack 15 nos. from steel plate, angle, nut bolts using gas, denting paint , primer etc for store material at site store material at site store arranging , tagging to same time in identification of material, rack size d
Repairing of RHS bend idler foundation frame, rear portion of the blade assembly, fabrication/ repairing of operator cabin with changing of door lock (02 nos.),mounting of hydraulic tank an fuel tank and radiator guard repairing forDozer-11657 of GVP
NIT fSIT of Battery and its Charger for providing DC power supply for CNS Equipment and and Fabrication, supply and testing of customized Receiver Splitter, DC sockets, patch panel and Installation of RF Connectors at TBCT at Birsa Munda Airport, Ran
Dismantling of obsolete structure erected in switch yard,Fabrication of double H pole type structures for mountin of cables n GOAB at both primary,secondary side of 3MVA, 6.6KV/3.3KV transformers n VCB,dismantle n erection of insulators at RP
1.Damage blade arm broken plate cutting inside lower upper size 12X4. 2.New plate cutting setting and welding inside lower and upper plate. 3.Pin hole oval worn out portion welding buildup as per size. 4.Arm end collar gousing and welding by st
1.Dala body wall both side damage portion cutting size 5X3 by gas. 2.Dala body both side of grounding dumper plate cutting. 3.Cutting plate of body welding element V shape cutting and welding. 4.Root lining welding by steel electrodes and filling
1.Damage blade arm broken plate cutting inside lower and upper size 12X4. 2.New plate cutting setting and welding inside lower and upper plate. 3.Pin hole oval worn out portion welding buildup as per size. 4.Arm end collar gousing and welding by
1.Damage blade arm broken plate cutting inside lower and upper size 12X4. 2.New plate cutting, setting and welding inside lower and upper plate. 3.Pin hole oval worn out portion welding buildup as per size. 4.Arm end collar gousing and welding by
1.New making of crowd gear cover. 2.New plate cutting, bending and welding. 3.New angle cutting, setting and welding. 4.New holes drilling as per size. 5.Collar shape cutting and welding by steel electrodes. 6.Shape making as per size. 7.Trip