Loading…
Loading…
6,730 results • Best match
1.Dala body wall both side damage portion cutting size 5X3 by gas. 2.Dala body both side of grounding dumper plate cutting. 3.Cutting plate of body welding element V shape cutting and welding. 4.Root lining welding by steel electrodes and filling
table, l shaped table, work station, cabinet, fabrication, instalation
Fabrication of 1 nos. Heat Chamber at TRW, Chatra
Dismantaling, repairing and erection of damaged wire mesh, fabrication
a) Repairing, reconditioning and overhauling of 150LPS, 100mtr. head HH 220i Sykes pump (Tag P3) b) repairing, fabrication of shaft and complete overhauling of 150 LPS 100 mtr. head old Sykes Pump Tag No.6925 for intake well under Piparwar Pro
Fabrication and erection of tailing collector and making, fitting of flange, controlling valve, short piece pipe etc. complete after dismantling of old and damaged the same and scrap materials, removed from working site to scrap yard in Fine Coal Sec
Work of MS/GI pipeline with dismantling, laying, cutting, jointing, fabrication of bends etc for pump shifting at coal face, No. Sump incl. repairing of old damaged delivery pipelines as when where required as per advancement of mine under Dakra OCP.
Repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same of unit no. 1301 belt conveyor tail end side at PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL.
Sheet Metal Cowling cover denting straightening,painting ,fitting,Cabin Repair,ROPS and FOPS structure ,Oil cooler Frame, Tube structure cabin floor assembly,side door,ladder fabrication and repair of CK 300 shovel Sl no 167 and Sl no 175 and Tarfe
(A) Dismantling of 02 Nos. pipeline ranges (B) Laying and commissioning of two new ranges of MS Pipeline for installation of two nos. Pump (C) Installation of new water filling point and fire fighting arrangement (D) Fabrication of Base Plate / Frame
Fabrication of baseplate with making of necessary holes for assembling and fixing of 2000gpm 10by8 EST module pump motor set and transporting of 2000 gpm pump motor set from feeder breaker and installation at Jarlahi patch for smooth operation of pum
Replacement and repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same at unit no. 301 drive side belt conveyor of ROM section at Madhuban Coal Washery under Block-II Area,
Replacement of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of counter weights plate from and same of unit no. 201 drive side to both side counter weig
Dismantling , fabrication erection and alignment of pipe support outside PS-5 i.e. the area in between PS-5 to PS-6 and PS-5 to PS-14 and repairing of delivery pipes of PS-14 under section of Rajrappa Washery
For fabrication of railing guard above cabin Assly. and fitting in Drills DR-159 , DR-226 and repairing of operator seat in Drill DR-226 and fitting new safety glasses 02 No. in DR-159 at AKWMOCP , KATRAS AREA, BCCL.
Repairing of damaged bunker, bottom platform, chute, door drum with stand and repairing of bunker alongwith fabrication an erection of new platform, chute,door drum with stand and supporting unit of Feeder Breaker No-1 of Kessurgarh under ABOCP mine
Repairing and completely overhauling of DSM3 RPM1450 Kirloskar make pump including fabrication and making of reducer bend 4inch dia full bend 4inch dia MS flange and repairing of 4inch dia valve spindle and checknut etc for smooth operation of pumpin
Replacement repairing of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at 902-2 drive side belt conveyor of PS-9 section at Madhuban Coal Washe
Extension and reviving of main drain and store room with perifiral fencing and fabrication of blast barrier for 2 nos of 10 MVA transformer and 01 no of 7.5 mva transformer at 33kv 11 kv main sub station MRSS Dhori Area.
Fabrication, installation cum positioning of Mechanical Lifting arrangement for retreating of 500/800/1200 GPM Pump-motor sets at clean water pump house n Raw water pump house during gushing of water along with tapping n providing of water supply
Repairing/replacement of worn-out/damaged mother and liner plate of feed chute of 4B feeder,fabrication and fitting of feeder tray and supporting channels,angles etc above unit no 6 tunnel conveyor belt and platform supporting structure of feeder
Fabrication n fixing of shed for pump n motor (440V, 3PH, 30HP, make-Bharat bijlee) set dedicated for supplying water to water tanker filling point and repairing of existing damaged shed of DOL Starter in respect of IWSP, BnK Area.
Repairing and fabrication of dismantled worn out under carriage left side track chain, roller guard, carrier and track roller, repairing the worn out thread making and fitting of under carriage left side in CK300 Hyd. Shovel B770 at ADIC Kusunda Area
Replacement of worn out intermediate frame and deck plates conveyors rollers, return rollers and installation of idler frame with rollers fabrication and erection of same at 701-1 belt conveyor, Drive side of ROM section at Madhuban Coal Washery u
Replacement of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at 902-2 centre portion side belt conveyor of PS-9 section at Madhuban Coal Washery
Replacement of worn out intermediate frame and deck plates , conveyor rollers and installation of idler frame with rollers fabrication and erection of same at 801 belt conveyor drive side of PS-8 section at Madhuban Coal Washery under Block-II A
Supply and fitment of rear view mirror and Bilndspot Mirrors, Fabrication/ repairing of supporting rods and clamping accessories of water tanker (WT-3, WT-4 and WT-5), Wheel Dozer (WD-1) and chain Dozer (D-2) of Amrapali project
Repairing of worn out boom cylinder eye housing - 04 nos. and Pin - 02 nos., Fabrication and fitting of Boom cylinder eye housing bush - 04 nos., Crack repairing of boom foot of TATA 1200 Shovel Sl. No.- OABY00067 of Muraidih Colliery.
Complete repairing and overhauling of one no 60m head 1000 GPM pump Sl No 1748003172 Make Kirloskar fabrication and fixing of coupling guards and providing coupling spares for smooth pumping for dewatering of mines of Rajhara OCP under Rajhara Area
Replacement of worn out inter mediate frame and deck plates conveyor rollers and installation of idler frame with rollers fabrication and erection of same at 301 belt conveyors , centre portion of ROM section at Madhuban Coal Washery under Block-II
Replacement of worn out intermediate frame and deck plates, installation and erection of idler frame with roller, return rollers, fabrication and erection of same at 902-2 drive side belt conveyor of PS-9 section at Madhuban Coal Washery und
Fabrication and erection of 471 screens feed collector, pipe line fitting of audco valve, supporting structure etc after complete dismantling the same at 9 meters level and scrap materials removed from working site to scrap yard at fine coal section
Repairing and maintenance of two no. distribution transformer 1st 100KVA, 3.3kV/440V installed at CHP fabrication site 2nd 100 KVA, 11KV /440V and rewinding of 01 no. 100KVA ,11KV/440 Transformer make morsons electric limited ,sl no 22514 in respec
Repairing of 02 nos. A frame bearing , repairing by eye making as per pin size, bush fitment, plate fitment, fabrication of 04 nos. of steel tube and differential arm of CAT777d Dumper Sl. no. TH-11 TH-12 at Ashok OCP.
Repairing of steering cylinder both side and stabilizer of wheel dozer 834K sl. no. 0745 and Repairing work towards fabrication of Float H-Arm Assembly and 02 Nos. Side Links for Tata Hitachi excavator at Tapin North OCP, Hazaribagh Area.
Replacement of worn out intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same at unit no. 704-1 belt conveyor of PS-9 section at Madhuban Coal Washery under Block-II Area, BCCL .
Fabrication of large size war resistant metal hardness picks and fixing in gaps between the original picks and holder sets of primary crusher roller BWF make feeder Breaker in order to achieve maximum efficiency in crusher coal size installed at Tarm
Dismantling and cutting of damaged bunker including damaged chute, coal, coal discharge unikt and repairing of bunker along with fabrication and erection of new chute and coal discharge unit of feeder breaker No.1 of Nudkhurkee under Block-2 area
Repairing and backfitment of radiator assy and its foundation of BG825 Motor grader G4, (ii) Fabrication of end bit, side edge , repairing bracket , blade adjuster, its mounting etc and fitment of same of BG825 Motor Grader G4 of Ashok .Refer NIT
Dismantling of damaged deck plates, idler frame with rollers, return rollers , installation erection of same and fabrication and erection of deck plates of unit no. 201 PS-2 belt conveyor tail end side of ROM section at Madhuban Coal Washery under
Replacement of wornout intermediate frame and deck plates installation of idler frame with rollers fabrication and erection of same of unit no 901 drive side conveyor gallery of PS 9 section at Madhuban Coal Washery under Block II Area BCCL
Fabrication of Safety Guard (Jhali) for cooling fan of Power transformer and Making an arrangement of back door inter-locking with 11KV/6.6KV VCB Panel along with reconnection of earth pit connection of power transformer at Madhuban D.G. Sub-station
Fabrication of 03nos.Traffic boom barrier near coal stock, entry point, CCL check post and 4 nos goal post at different mines entry and exit point of mines premises to stop pilferage of coal in respect of konar Exp OCP, BnK Area
Repairing of both side idler shaft opening and fitting, one no serviceable idler shaft taking out from S/off dozer, broken bolt opening 06 nos transmission guard and fabrication with fitment of transmission,front cylinder hose guard of dozer 13593.
DISMANTLING OF 14 FOURTEEN NOS FAILED RHS TRACK CHAIN PAD LINK REPAIRING OF OLD SERVICEABLE TRACK CHAIN PAD LINK AND FABRICATION OF 02 TWO NOS LHS CARRIER ROLLER MOUNTING BASE OF EX350 LCHV MODEL HYDRAULIC SHOVEL NO HS34 OF RAJMAHAL PROJECT
Replacement of wornout intermediate frame and deck plates conveyor rollers and installation of idler frame with rollers fabrication and erection of same at 701 belt conveyors tai end side of ROM section at Madhuban Coal Washery under Block-II Are
Fabrication of 04 Nos end bit applicable for D11T Dozer 04 Nos WD600 Wheel Dozers and 07 Nos tooth Points for Komatsu 10cum Loader Also Repair of 02 Nos engine stand for NT855C Engine all of Ashok OCP of Piparwar Area.
Fabrication of large size wear resistant metal hardness picks and fixing in gaps between the original picks and holder sets of main crusher roller of Atlas copco make Feeder Breaker in order to achieve maximum efficiency in crusher coal size installe
Fabrication of three nos. of portable sheds, including sheeting for its roofing and internal electric wiring to be used for three nos. of 2000 G.P.M. Pumps and providing 4 nos. of concrete slab for 3.3 kV D.O.L. Starters of the Pumps
Providing of Gate and Top and Side Covering for Safe operation of 2.5MVA, 11KV/3.3 KV Transformer of NC Patch III Sub Station and Fabrication of Gate and Window for Rest Shelter of 14 No Parking of KOCP under ABDKC