Loading…
Loading…
6,730 results • Best match
Fabrication of 01 Explosive Van complete, on New TATA Truck Chassis tobe provided by Rohini OCP,NK Area, as per tech. specs. indicated in Annexure X complete in all respects alongwith necessary Licenses from the Explosives Department, Govt. of India
Fabrication / preparation of delivery and suction band of 8 inch and 12 inch pipe, short piecee, of 8 inch and 12 inch dia pipe for suction and deliver line for smooth operation of pump in mine under Ashok PPR Area.
Fabrication of Large size war resistant metal hardness picks and fixing in gags between the original picks and holder sets of primary crusher roller of Black Diamond make Feeder Breakers in order to achieve maximum efficiency in crushed coal size in
Repairing and back fitment of 02 nos. Rear suspension, seal replacement, pin fabrication., 01no. Propeller shaft, etc of CAT77D TH-12. (ii) Dismantling and oval eye repairing of 02 nos. front suspension, seal replacement, etc of CAT777D TH-11 at AOCP
Dismantling of damaged deck plate, idler frame with rollers, installation and erection of same, fabrication and erection of deck plate of unit no. 1402 belt conveyor of middle portion of loading section at Madhuban Coal Washery under Block-II SArea
Dismantling of damaged deck plates, idler frame with rollers, installation and erection of same fabrication and erection of deck plates of unit no. 1404 conveyor tale end side of loading section at Madhuban Coal Washery under Block-II Area, BCCL .
Repairing of float switch assembly twin entry (ii) Repairing of Radiator (iii) Repairing of Track drive gear box LH side (iv) Repairing fabrication of recoil spring long shaft joint pin for running of 970 SDL machine (B) Maintenance repairing alo
Supply and fixing of change over switch 100Amp/415V/ 50Hz (four pole) (02Nos), 200Amp/415V/50Hz, (four pole) (02 Nos) for different location and fabrication of 01 No Shade with chemical earth pit for DG Set at Rest house Bhurkunda Proj
Replacement, repairing of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at 801-1 drive side belt conveyor of PS-9 section at Madhuban Coal Washe
Fabrication of 10 inch dia and 8 inch dia delivery bends, suction bend, nipple and providing and fixing of NR valve and foot valve for operation of 1300 GPM and 2000 GPM pump at Jehlitand Sump under KDH OCP, NK Area
FABRICATION OF A SAFETY BUCKET, 4 NOS 29 MM WINDING ROPE REST CLAMP, SHIFTING HEAD GEAR PULLEY AND DISMANTLE OF PIT TOP COVER FOR LIFTING OF 02 NOS STUCKED SUBMERSIBLE PUMP SET IN 6 PIT OF KB 5/6 PIT COLLIERY.
Repairing of pressure regulator valve, main relief valve, draw bar assly. and transmission control valve assly. for float along with the fabrication of engine hood, cover and radiator guard repairing of LHS lift cylinder of BD155 Dozer, Sl. No.13629
Line boring 4 nos eye and bush fitting and adapter fabrication of Bucket front shell ,material filling and line boring in 2 nos bucket cylinder ,2 nos dump cylinder ,2 nos stick Cylinder fork repair of DHD 18211 of purnadih Project
Preparation of 16 no earth pit for for making earthing grid for neutral, body earthing and lightening arrestor for 5 MVA, 33KV/6.6KV transportable sub-station, 3 No for 6.6Kv/415V lighting transformer and fabrication of shade for the transformer und
Repairing of 01 no. lift cylinder bend piston rod straightening/repairing, hard chroming, piston rod polishing as per standard and bore hole and new fabrication of bush making (both side) of crane RT630C Sl. No. 404324 at Nichitpur OCP, Sijua Area.
Repairing of Rack Segment, Dipper handle cracks, both front stopper areas of dipper handle, Dipper handle eyes ,fabrication and fitting of new steel bushings and Shipper Shaft Pinion (in float) of 182 M Marion Shovel, Sl. No.- 221 of AMP colliery.
Repairing of cracked boom, boom base arm, and repairing of boom housing fitment of bush, Repairing of final drive assembly of CK300 shovel and also fabrication of HVCR safety guard trailing cable hanger of S7 shovel at Ashok Opencast project.
Dismantling of gear box motor 125 KW GS-125B half gear box pinion shaft, coupling and fabrication and erection of motor base structure hold break fitting with MS materials of unit no. 52 in Raw Coal Section at Kathara Washery
Replacement of scrapper Chain, repairing of head n tail sprocket assy of 522 chain conveyor, Dismantling, fabrication, erection and alignment of top side and bottom liners feed n discharge chute of 522 chain conveyor at main washing paint of RWP
Repairing of Final Drive Gear (02 nos.), Final Drive Pinion, Crowd Clutch Gear (01 no.), Crowd Shaft Gear Cover - 01 no. and Fabrication of Final Drive Gear Case Cover -02 nos. of EKG Shovel, Sl. No.- HMB541 of AMP colliery.
Fabrication and erection of feed box (1000 mm x 1000 mm x 8 mm) of unit no. 224 magnetic separator and tail pipe (2.5 mtr x 150 mm) of unit no. 228 magnetic separator in HMS Section of Kathara Washery
Fabrication and making of steel structural work for 02 Nos switch stand for 11kv 400Amp.VCB installed at Kalyani sub-station including painting and writing of safety instruction/slogan/caution Board for both of Kalyani and Tarmi sub-station under SDO
Repairing of Swing hydraulic motor and fabrication of swing gear shaft and gear hub and repairing of mounting of hydraulic cooler, 4 nos mudguard and front and rear bumper of RT740 Crane sl. no. 407968 of KDH Project, NK Area.
A Repairing, maintenance and fabrication of Water Tank Leakage proof plate changing work of Water Tanker bearing Reg. no. BRY - 3178 of Dhori (K) Colliery B Repairing of dashboard cabin, seat mechanical work of Truck bearing Reg. No. BRY - 3041
Replacement of damaged intermediate frame and deck pates, installation of idler frame with rollers, fabrication and erection of same at 501 belt conveyor of tai end side at PS-5 ROM section at Madhuban Coal Washery under Block-II Area, BCCL.
Repairing of a tail end / rear shaft with bearing and associated centre plate, crusher drum roll with lifting frame, fabrication of splined shaft, flight assembly with re-assembling of BWF FB-02 at JRD railway siding PF-1, AKKOCP,BnK Area
Fabrication and installation of one no. heavy duty guard/ cover of flow meter installed at DD mines for smooth functioning of flow meter and Providing commissioning testing and fixing 08 inch and 06 inch dia PVC helical pipe required for replacement
Repairing of Boom foundation Eye with line boring in Boom eye housing, fabrication of bushes in stick housing along with Dismantling, Repairing and fitment of Tooth Point adapter, Tooth Point and different cracks developed in boom and stick of CKD-30
Repairing of damaged bunker bottom platform, chute, door drum with stand and repairing of bunker along with fabrication an erection of new platform, chute, door drum with stand and supproting unit of Feeder Breaker no 2 of Nadkhurkeem ABOCP Mine
Fabrication,machining of spindle and check-nut for sluice value repairing (in different size) operating in raw water and drinking water supply pipe line, suction pipe line and suction delivery of pumps at Jamunia water Treatment plant under Block-II
Replacement of wornout intermediate frame and deck plates, installation and erection of idler frame with rollers, returns rollers, fabrication and erection of same at 801-1 Tailend side belt conveyor of PS-9 section at Madhuban Coal Washery under Blo
Repairing and replacement of damaged and worn out conveyor under shed of conveyor 1016, 1017, 1018, 1021, 1022 and 1026, and Fabrication of structure for fitting of 08 nos. Guide rollers in conveyor 1016 and 1017 under CHP-CPP, Piparwar Area.
Conversion of the 33KV outgoing feeder bus bar from conductor type to pipe type, Replacement of 33KV, 1250A GOAB switch, Fabrication of a steel platform, Sand and gravel filling in the substation yard, and Maintenance and reconditioning of two nos. 1
Fabrication out of 10 inch, 8 inch, 6 inch dia old and useful pipes from Kargali washery to fabricate the fixed type lighting tower in Kargali washery workshop to be used for erection at different project and colonies of BnK Area.
(1) MANUAL LOADING AND TRANSPORT AND JOINING OF 10INCH DIA(12 MTR LENTH PIPES) FOR MAKING OF NEW RANGE AT AKWMC.(2) MISLLANEOUS 10INCH DIA M.S PIPE LINE JOBS AND FABRICATION JOBS FOR PUMPING OPERATION AT AKWMC.(3) (i) DISMA
For Making of 20 Nos. Spacer Bush of Chain Guard of BE - 1000 Hyd Shovel Sl. No.- G-10217 and Fabrication and Fitting of Engine Guard of TATA- Hitachi Ex-1200 Hyd. Shovel Sl. No. OABY002033 at AKWMOCP, Katras Area BCCL.
Replacement and repairing of damaged intermediate frame and deck plates. installation and erection of idler frame with rollers, return rollers, Fabrication and erection of same at 801-1 tail end side belt conveyor of PS-9 section of Madhuban Coal W
Repairing of Roller Float, Front Idler (602760-1) - 02 Nos., Front Idler (602626-5) - 02 Nos., Bushing (602625-7) - 02 Nos. and Washer - 20 Nos. and Fabrication of Shaft of 182 M Marion Shovel, Sl. No.- 221 of Muraidih Colliery.
Repairing of 01 No. lift cylinder bend piston rod straightening/ repairing, hard chroming, piston rod polishing as per standard and bore hole and new fabrication of bush making (both side) of crane RT630C Sl. No. 404324 at NOCP, Sijua Are
Dismantling of iron materials of damaged portion of top and bottom of bunker conical portion of hopper chute of hopper and discharge drum along with supporting materials and repairing the same by fabrication of old iron materials of feeder breaker No
Replacement of worn out intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same at 902 belt conveyor of drive side at PS-9 building at Madhuban Coal Washery under Block-II Area, BCCL.
Replacement of worn out intermediate frame and deck plates, idler frame with rollers, return rollers both side counter weight area and repairing of damaged counter weight platform Fabrication and erection of same at unit no. 801-1 belt conveyor of Ma
Replacement of wornout intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at 507-2 belt conveyor of ROM section at Madhuban Coal Washery under Block-II Area, B
Erection / Fabrication, repairing of steel structural work replacement / repairing of road weigh bridge no. 02 of joist, channel etc. and handling of loose weight (20Kg. each) for checking and testing of road weigh bridge no. 01 and 02 of Sawang Wash
Replacing B/D 4000GPM pump by another 4000GPM pump at Purbasump and dismantling 10inch and 8inch dia damaged MS Pipe from mine and transporting to attendance room premises for fabrication and making of bend, short piece and tapper pipe of AMPC.
Repair, fabrication and erection of 248 B/C structure using 150 mm x 150 mm x 6 mm channel total length 70 mtrs and mounting of bottom roller (10 nos.) and carrier roller (20 nos.) in HMS Section at Kathara Washery
Replacement, repairing of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at 902-2 Tail end side belt conveyor of PS-9 section at Madhuban Coal Washe
DISMANTLING MANUAL TRANSPORTING SITE TO SITE and RE-ERECTION OF 10 inch M.S PIPR 390 MTR INCLUDING MATCHING VERTICAL ERECTION ROAD CROSSING FABRICATION OF REQIRED BENDS OFF SETS AND MATCHING WITH EXITING DELIVERY OF KUMARI JORE- I RANGE AT AKWMC OCP
Removal Repair fitment of bearing axle and fitment of bush. Fabrication new ladder assembly, main motor coupling and base 04 nos., collector ring mounting Final drive inspection plate and 04 nos. Idler wheel housing of S10 Shovel at Ashok OCP.
Work of 10inch, 8inch and 6 inch GI pipeline work with dismantling, laying, pipe cutting, fabrication of bends etc work for pump shifting at main and Jehlitand sump as and when required for one year under KDH OCP, NK Area.