Loading…
Loading…
6,730 results • Best match
Fabrication of one (01) no. 36-drum (6X6) pontoon for 1000 GPM pump-motor foundation of reddy sump and maintenance of one (01) no. 36-drum (6X6) pontoon for 1000 GPM supply pump-motor foundation of main sump at JOCP.
Changing and fitting of Screw bolts, Nut, Washer for both propel gear boxes, Fabrication of Dipper Trip Motor Pinion., Shoe Slide and Shim for adjusting both front Idler Shafts of 182 M Marion Shovel, Sl. No.- 221 of AMP colliery.
Fabrication of sheds for 01 nos 1000GPM pump motor and repairing of damaged sheds of pump 02 nos 500 GPM shed, operator shed and the shed in main sump and operator shed of middle sump set in respect of AKK OCP
Fabrication, erection and repairing of mother plate and liner plate of transfer B/C, receiving pyjama chute, transfer B/C discharge chute, screen discharge chute, changing of rail between by-pass and picking conveyor etc. work in PCH Section of Sawan
Work Fabrication an fitting of stringer frame in top roller an bottom roller, dismantling of top roller an bottom roller with frame and refitting after changing of stringer frame of Feeder Breaker No.- 2and3, at Nadkhurkee under ABOCP Mine of BII
Replacement of worn out intermediate frame and deck plate, installation of idler frame with rollers and fabrication and erection of same at unit no. 401 middle portion belt conveyor of ROM section at Madhuban Coal Washery under Block-II Area, BCCL
Replacement of damaged intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at 501-2 Middle portion of ROM section at Madhuban Coal Washery under Block-II Area, B
Fabrication and erection of motor base primary crusher motor no. 2 (320KW) and burnt motor dismantling and shifting of new motor from electrical work shop to -12 mtr with MS material and welded in Raw Coal Section at Kathara Washery
(A) For repairing and maintenance of Kirloskar make, 6UP3 pump(B) Fabrication of 4 no. of coupler of size 250mm outer diameter and 32mm and 64mm inner diameter with 12 holes each, including cost of CI material required at ARA Colliery.
Repairing of Primary Hopper damaged main gartor, crusher portion damaged and repairing of mother plate along with fabrication and erection of new plate stand and supporting unit of feeder breaker no-01 of keshargarh ABOCP mine of Block-II Area
Replacement of wornout intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of same at Unit no. 916 conveyor of PS-9 section at Madhuban Coal Washery under Block-II Area,
FABRICATION AND INSTALLATION OF NEW C/R AND H/R GATE WITH EMBEDDED PARTS, HOISTING ARRANGEMEN T OF CANAL CHAIN NO. 53 AND MAINTENANCE OF C/R GATE, H/R GATE AND HOISTING ARRANGEMEN T OF NAKTI NALA WEIR SCHEME.
Dismantling of damaged materials of bottom portion of gallery along with supporting structure and repairing the same by fabrication and fitting through old raw material and also lubrication and exertion of stringer frame of F/B No4 at AMP Colliery.
Replacement of worn out deck plates, fabrication and erection of new deck plates and dismantling, installation and erection of brackets with rollers of unit no. 1401 belt conveyor Head drum side at Loading section at Madhuban Coal Washery under Bloc
Repairing of Boom foundation eye with line boring in Boom eye housing, fabrication of bushes in stick housing along with Dismantling, Repairing and fitment of Tooth point adaptor, Tooth point and different cracks developed in boom and stick of CK-300
Dismantling of damaged deck plates, idler frame with rollers, counter weight, installation erection of same and fabrication and erection of deck plates of unit No. 1406 belt conveyor of Loading section at Madhuban Coal Washery under Block-II Area, B
Repairing, strengthening of tail end drum base structure of conveyor no. 1602 of PS-9 section and dismantling of damaged deck plates, idler frame with rollers, return rollers, fabrication and erection of same of unit no. 1602 Tail end side
Replacement of worn out intermediate frame deck plates, installat5ion and erection of idler frame with rollers, return rollers, fabrication and erection of same at 901-1 drive side belt conveyor of PS-9 section at Madhuban Coal Washery under Block-
Fabrication and fitting of stringer frame in top roller and bottom roller, dismantling of top roller and bottom roller with frame and refitting after changing of stringer frame of Feeder Breaker No.-3 of Muraidih, AMP Colliery under Barora Area.
A) Dismantling of old damaged conveyor belt shifting and installation of new conveyor belt 1400 mm of different places in Raw Coal (0-0) Section B) Dismantling of discharge chute, liner plate and fabrication and erection of discharge chute and liner
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same of unit no. 1301 belt conveyor middle portion at PS-9 section at Madhuban Coal Washery under Block-II A
(A)Repairing/Fabrication of two (2) nos. of RKB Pump base frame and (B)Dismantling and laying of 6inch dia pipe with fabricationof 6inch dia flange, sluice non-return valve etc. for smooth pumping at 7/8 incline, Dhori (K) Colliery.
Repairing of Float Roller, Front Idler (602760-1) - 02 nos. and Fabrication Of Shaft, Front Idler (602626-5) - 02 nos. and Bushing (602625-7) - 02 nos. and Washers - 20 nos. of 182 M Marion Shovel, Sl. No.- 221 of AMP colliery.
Repairing of (A) Intermediate shaft and Fabrication of its locknut and studs with nuts. (B) Crowd motor foundation and Replacement of base plate of Crowd motor foundation plate bolt nut washer of EKG Shovel, Sl. No.- HMB-541 of AMP colliery.
Reformation, reorganization and fabrication of motor n pump foundation base frame for running 125HP, 550V motor and DSM-5 pump on the existing base frame including harmonizing with the delivery pipeline n valves of 6inch and fabricating of fan cover
Dismantling of damage deck plate, idler frame with roller, installation and erection of same fabrication and erection of deck plates of unit no. 1401 belt conveyor of drive side of Loading section at Madhuban Coal Washery under Block-II Area, BCCL
Repairing of Hyd. control valve, main relief valve, draw bar assly, changing of door lock 2 nos. and transmission control valve, steering control valve assly. with fabrication of engine hood, cover and radiator guard repairing of BD355 Dozer, Sl. No.
Replacement and repairing worn out intermediate frame , deck plates and liner plates for chutes and erection of idler frame with rollers, fabrication and erection of same at 506 belt conveyor of ROM section at Madhuban Coal Washery under Block-II Ar
Dismantling, shifting and fitting of old motor, base and coupling, fabrication and erection of new motor, base and coupling fitting and assembling etc. of Pump No. 1 and 3 (River Side) including making of flange as per required under Kathara Washery
Design, Fabrication with running and operation for 365 days of one no Automatic wheel washing system with pic and different logic operation as per the vechile analysis and minimum utilization of water for heavy vechiles at exit point at AAODCM
Replacement of damaged deck plates, idler frame with rollers, installation/erection of same and , fabrication and erection of deck plates of unit no. 916 belt conveyor and replacement and repairing of damaged liner plates of unit no 953 and 916 disch
Rep. of operator cabin, grease drum platform, battery box, track chain link cutting from machine, fitting from serviceable track chain (RHS) and rep./ fabrication 0f 02 Nos. chain guard of Hydraulic Shovel Sl. No. G10228 at ASBN OCP, Sijua Area.
(A) Repairing of damaged 6 inch dia pipeline by dismantling, laying and fixing, pipe cutting, jointing, fabrication of bends etc for sprinkler system at Dakra siding (B) Repairing and replacement of damaged 6 inch dia pipeline for dust suppression in
Rep. of broken track chain link (03 sets), chain guard (01 set), broken bolt removal, bolt providing and fitting, rep./ fabrication of 02 Nos. final drive cover in BE1000-1 Hydraulic Shovel Sl. No 10222 at ASBN OCP, Sijua Area.
Fabrication and fitment of Railing Pipes of Boom repairing of damaged Catwalk Steps of Boom Walkway of Boom Machinery House Roof Dykes Hoist Rope Guard on Machinery House Roof etc of PH 2300XPA LR Shovel No RS15 of Rajmahal Project
(A) Repairing of counter support, fabrication of metal washers for shimming in trick and repairing of cracked turbo charger guard and silencer pipe of Tata Hitachi Exc-2961. (B) Repairing of cracked air cooler, radiator and oil cooler of ZX650H Tata
Diff.types of jobs such as repairing of old water tank at Shatabdi filter plant, laying and jointing 1inch dia PVC pipe for tanker, fabrication and fixing of safety board and valve repairing and coupling bore and keyway making under Muraidih,AMPC
Dismantling of 300 Mtr 6 inch GI / MS. Pipe and laying the same on bench for providing water for dust suppression and to nearby villagers from sainik patch sump at Develgadda including installation and fabrication of sunction, delivery system of 1000
Fabrication n fixing of shed for pump n motor (550V, 3PH, 60HP, make-Kirloskar) set dedicated for supplying water to water tanker filling point, starter, grinder machine, etc and replacement of existing damaged sheets near clean water pump house incl
Repairing/fabrication of damaged grills of radiator, track frame covers, battery box, lift cylinders eye, etc of D355 dozer Sl. No. D25 and replacement undercarriage assy. and repairing of 54nos. Sprocket holes of D155 dozer Sl. No. D24 at Ashok OCP
Replacement, repairing of worn out intermediate frames, deck plates and liner plate for fix chute and erection of idler frame with rollers, return rollers, fabrication and erection of same at unit no. 506 belt conveyor of ROM section at Madhuban Coal
Fabrication and commissioning of 0ne No. PVC drum pontoon for One No of pump capacity 1000 GPM/2000 GPM to run in the quarry sump for quick dewatering in the upcoming monsoon 2026 at Parej East OCP under Hazaribagh Area.
Making of HT and LT Bus-system from 11KV GOAB to 250 KVA, 11KV/440V distribution transformer and transformer to 800 A distribution LT switch to replacing cable system for proper power supply, fabrication and installation of shed, filling sand
Repairing of pressure regulator valve, steering control valve, draw bar assly. and trans. control valse assly. Changing of door lock 2nos. along with the fabrication of engine hood and radiator guard rep. and Lift Cyl. eye rep. with changing of bushi
Fabrication and Installation of 6 Nos MS Sheet Shed for 11 KV 3.3 KV 440V Switches 3.3 KV Starter 3.3 KV Motor and Transformer kept at Libra Pumping site at Kujama Section of Amal.NT-ST-Kujama Colliery under Lodna Area.
Repairing, line boring of 04no. hoist cylinders eye, its 04no. mountings holes and rebuilding/fabrication of 04no. pins, etc of WA800 PL7 and Repairing of rear differential assy., its mountings, drive line, support assy. of WA800 PL7 and 988H PL1
Fabrication, Erection and Commissioning of new 2 nos. U/S and 5 nos. Service gates of Head Works with hoisting arrangement, embedded part, electrical accessories and other components of gates and stairs, Hoisting shed, D.G. set with shed of Tardiha
Repairing of Wornout Broken eye welding, griding and bush press fitting of damaged/ Broken bucket cylinder piston adding and welding, machining and fitting of barrel of bucket cylinder
1. Gouging of carousel tower. 2. V joint bead welding on cracked portion by steel electrode. 3. Cracked dust collector body welding. 4. Repairing of Gear box body.
1. Repairing of operator cabin damaged portion straightening. 2. Repairing of operator cabin gate by gas heating and welding. 3. Repairing of damaged portion silencer straightening and welding.