Loading…
Loading…
6,731 results • Best match
1. New making of radiator guard. 2. New plate cutting, bending and holes making as per size. 3. Radiator guard setting alignment and welding. 4. Repairing of damage battery box straitening.
Repairing of operator cabin and fitting of new safety glasses along with all rubbers, locks and handles of operator cabin, cabin gate opening, repairing of damaged portion by denting and welding.
For repairing with meterials of Diesel Engine Kirloskar 5 HP and Stator, Rotor new making welding Air cooler DG Sl. No. DOI/41/80334/220/ 230 of SAW under Sijua Area.
Repairing of both side gate, Glass frame, gate lock, reling cutting, strighting, reconditioning fitting welding, platform right side cutting repairing and reconditioning fitting etc. Sl. No. D1126 of Gidi A Project
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COAL MINES; Pipelines, Repairing of upper cashing body stator of 54KW flygt pump by aluminimum welding at Rajmahal OCP; Service Provider
Please Refer ANNEXURE B in Tender Document
Caution Tape, Discharging Rod 33 KV, Dust Mask, Ear Muff, Fighting Hose Pipe with Coupling, Florescent Jacket, Rubber Hand Glove 11KV, Safety Belt Full Body Harness, Safety Goggles, Welding Goggles, Welding Screen, Whistle, LED Torch, Welder Gloves ... Leather Welding Apron, ... Apron, Welding Cap, ...
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
Fabrication and fixing of metal picks (Teeth type) for adjustable type secondary crusher roller (Old Roller) of Black Diamond make Feeder Breaker installed at Tarmi siding of SDOCM project.
For the Fabrication of extention Pin of link (100 nos.) for the conveyor chain of feeder breaker No. 1 and 2 of CHP Sendra Bansjora Colliery under Sijua Area.
For repairing of fabrication of frame, block readjustment and fitting of drive pulley with gear bo of feeder breaker No. 03 of CHP, Sendra Bansjora Colliery under Sijua Area
Work of metal fence painting name plate board fabrication erection and naming of 220KV 132KV 33KV feeders in their respective bays and other important places within GSS Itkhori premises
Planning, Design, Engineering, Construction, Fabrication, Erection, Supply, Installation, Testing and Commissioning2x3.15MVA, 33/6.6kV Sub-Station at TETARIAKHAR OCP, CCL and Operation and Maintenance of substation(plant) for five years
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Repairing and fabrication of structure machine C-21 and conveyor belt C20 at Rajmahal CHP; Service Provider
Construction of continuous electric welding in bracing members at every angle joint points required in different tower types in 220KV DC Itkhori Latehar Transmission Line under jurisdiction of Transmission Sub division Itkhori
1. Dismantling of complete transmission pump assly and after cleaning outside agency. 2. Repairing of housing welding machining grinding honing polishing and facing. 3. Transmission pump assly testing and full fitting etc.
1. Arm cylinder body eye end head welding, bush fitting and machining. 2. Arm cylinder body bore scratch portion dispositioning and machining. 3. Cylinder bore and piston rod grinding, honing and polishing.
1. Dismantling of complete hyd. Winch motor assly after cleaning outside agency. 2. Repairing of housing welding machining grinding honing polishing facing. 3. Hyd. Winch motor assly. testing and full fitting etc.
1. Operator cabin frame denting welding and straightening 2. Gate lock repairing and fitting 3. Repairing of operator seat 4. Fitment of new safety glasses with new rubber bit and rubber lock
1) Complete damage partition new plate changing 6mm plate. 2) New angle changing, alignment and fitting. 3) Roof plate cutting welding, alignment and fitting. 4) Complete repairing of water tanker inner partition.
1.Front damage plate cutting size -4ftx12inch. 2. New plate welding in place of damage plate by steel and low Hyd. Electrode 3. Blade front wall outside surface even by gauging electrode.
work for construction of continuous electric welding in bracing memebers at every angle joint points required in different tower types in 220KV DC Itkhori Latehar Transmission line under Transmission sub division Itkhori
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COAL MINES; Repairing of outer cashing body and stator body of 54KW Flyght Pump by aluminum welding at Rajmahal OCP; Service Provider
Please Refer ANNEXURE B in Tender Document
Resurfacing of lawn tennis court, Epoxy Primer, Epoxy Paint Red, Epoxy paint Green, Remarking of Line Court, Drainage Repairing, Paint Primer of Light Pole, Repairing of Flood Light, Fabrication Charge
Miscellaneous pump spares making, fabrication for day to day running repairing, maintenance works for Pumps along with associated Motors of the following in respect of IWSS, CCD Dhori Area, CCLtd
Fabrication of a pair of tyre coupling set for Gear Box Motor of conveyor chain drive of Black Diamond make Feeder Breaker Machine installed at Tarmi Siding of SDOCM Project.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Dismantling Fabrication Repairing of WB platform and recommissioning of 100 Te Road weighbridges of Rajmahal Area; Service Provider
1. Bucket eye oval holes rebuilding. 2. Bucket eye holes rebuilding portion grinding as per size. 3. Bucket eye holes bush making 06 nos and fitting. 4. Gousing of cracked portion of dipper eye end both side.
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
A) Repairing of Bucket lip portion for proper fitment on tooth portion which including. 1. Old an broken lip portion removal by gausing and grinding. 2. New lip portion welding by steel electrode.
1.Repairing of bucket lip portion for proper fitment on tooth portion which includes a) Old and broken lip portion removal by gousing and grinding. b)New lip portion welding by steel electrode.
Repairing of Center bearing oval eye upper and lower both by material depositing by welding and line boring upto bearing size and fitment of bearings in 988H Payloader sl.no.- BXY-2878/FEL-199.
Repairing of 2 nos. hydraulic main jack assly. 1. Dismantling of complete hyd. Main jack assly after cleaning from outside. 2. Rep. barrel, welding, machining. grinding, honing and polishing. Repairing of 3 nos.
1. Dismantling of 1 no. complete hydraulic tilt cylinder piston rod assly after cleaning from outside. 2. Piston rod welding , machining, grinding , chromium polishing , threading and head repairing etc. 3. Piston rod straightening.
1. Broken transition guard dismantling. 2. Broken transition guard straightening by gas heating. 3. Transmission guard welding by steel electrode. 4. Repairing of damage battery box straitening. 5. Battery box new sheet changing.
A) Repairing of Bucket lip portion for proper fitment on tooth portion which including. 1. Old and broken lip portion removal by gausing and grinding. 2. New lip portion welding by steel electrode.
1. Both water tank top and bottom opening, cleaning and rusted portion, repairing by gas welding. 2. All tubes cleaning by HCL acid. 3. All tubes gagging. 4. Both tank refitting by soldering.
Work for construction of continuous electric welding in bracing members at every angle joint points required at different towers in 220KV DC Itkhori Latehar Transmission line under jurisdiction of Transmission sub division Itkhori
Repairing of bucket old plate cutting and opening size of plate 8X7-2 no, 7X12-2 nos 6X8- 2nos New plate fitting and cutting shape size welding of CK300 159 of Bokaro ocp
1. Damage transition guard dismantling. 2. Damage transition guard straightening by gas heating. 3. Transmission guard welding by steel electrode. 4. Repairing of damage battery box straitening. 5. Battery box new sheet changing.
Bid. POTENTIAL TRANSFORMER 6 Point 6KV By 110V, CABLE WELDING, CU,600AMP,RBBR,SQ SEC, HOSE 1IN,WTR, HOSE HP, HYD,WREBRAIDD, 1IN, W By END FTTNG, TAPE RETROREF LECTIVE, 50M X 50MM
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Repairing of outer casing body and stator body of 54 KW Flyght pump by Aluminum welding at Rajmahal OCP; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Repairing of impeller ring and sleeve making by welding machining of 400GPM 10UPH8 Pump Kirloskar make of Rajmahal OCP; Service Provider
Custom Bid for Services - Design, Fabrication, Supply & Installation of MS Chimney of Boiler with dismantling of old chimney at Turamdih Mill Similar Category Operation And Maintenance Of Other Machines And Plants