Loading…
Loading…
6,732 results • Best match
1. Welding and rebuilding of worn out splines. 2. Machining of rebuilding splines. 3. New splines cutting on shaper machine. 4. Final finishing of splines both side. 5. Straightening, bend portion of core of brake drum.
Providing and installation of 2 nos Drum Bush in Elecon make Feeder breaker no 2 installed at Potanga using cutting, welding and hydraulic Jack along-with Old bush removal using the same technique under Urimari OCP.
1. Service van body back side door complete removing, fitting. 2. Service van body back door complete complete denting, welding, repairing necessary damaged sheet changing, fitting. 3. Service van body back door kabja/ bracket cutting and
CEMENT, LED BULB, HOLDER, PVC PIPE, PVC BEND, SOCKET 16 AMP, SWITCH 16 AMP, SCREW, TILES, PAINT ACE, PRIMER, IRON ANGLE, WELDING ROD, ALUMINIUM SHEET, ALUMINIUM ANGLE, J HOOK, BLACK PAINT, WIRE 1.5 MM, FLOOR SHEET
1- Complete Operator Cabin Dismantling, all damage MS Sheet Cutting, New MS Sheet Changing, Welding, Denting and Repairing and Refitting. 2- Both Side Complete Fire Tender Side Body Dismantling, all Damage Angle, Channel, Square Pipe Cutting
1. old rack segment removed by gas cutting and gauging electrode. 2. Grinding handle body to remove burr from the surface. 3. Three layer welding of the new rack handle and rack by steel jointing electrode.
Work for angle with stub welding in rusted tower legs dismantling and re construction of damage portion foundation plinth construction of chemical earthing and ACD required at different locations of 400KV SC TTPS PTPS Transmission Line
1. Track frame diagonal LH and RH side broken portion gousing. 2. Track frame diagonal both side V shape cutting. 3. Track frame diagonal alignment as per size. 4. Track frame diagonal welding by steel electrode.
1- Front Both Wind Shield glass frame Cutting Welding Necessary rusted Sheet Changing and Frame New Making Proper Glass Size. 2- Front Wind Shield Glass with Rubber Replacement, Fitting with Materials. 3- Water Pump Dismantling, Fitting.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Repairing renewing complete cabin body operator seat complete painting and overhauling of clutch system of explosive van and repairing of welding van no JH17..
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
Dismantling and relaying of 6 inch dia pipeline and 1000 GPM pump motor set with installation of 2000 GPM pump motor and fabrication of tanker post at 4 no. mine under AADOCM, Dhori area
For installation of pontoon and 4000 GPM motor - pump including suction and delivery range and also fabrication of small drum pontoon and railing above main pontoon size 16ftX16ftX4ft at Nichitpur OCP under Sijua Area.
For fabrication of pontoon of size 21ftX21ft Manual pontoon of size 8ftX6ft and installation of 4000GPM Pump/ Motor set with base plate on pontoon at IV seam quarry of Tetulmari Colliery, under Sijua Area.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Power House Equipment, Pipelines, Layout, Fabrication, Erection & Commissioning of pipe lines for ZLD scheme of CTPS; As per SOW and ATC details
1. Boom broken portion cutting and alignment.3. Two no. box making inside the portion of boom. 4. Required plate cutting from grounded shovel damage boom. 5. Plate cutting as per required plate welding alignment box making.
(i)Repairing of Yoke shaft-(LHS RHS) broken portion of Yoke gouging ,welding. (ii) Repairing of broken and damaged Blade Arm-02 nos. (iii) Repairing of Trunion and its Cap(LHS RHS) with mounting bolts and nuts.
1.Blade lower side damaged base portion cutting. 2. Base portion developed by new plate cutting, setting and welding with steel electrode. 3. Hole making, cutting edge and end bit fitting. 4. Plate cutting from grounding Machine.
1. Taking out of broken bolts from undercarriage body 25 nos. 2. Making of thread through tapping process. 3. New bolts 25 nos and washers 50 nos fitting. 4.Undercarriage body cracked portion welding by steel electrode.
1. Both side bracket broken portion cutting by gas and gousing electrode. 2. Old bracket cutting from grounded machine. 3. Bracket both side welding by steel electrode. 4. Repairing of damaged portion of platform by gas heating.
1) The damage structure of the all four side of the cabin straightening and new M.S. Sheet changing by welding. 2) Both side of the gate of operator cabin, straightening repairing and refitting and new lock changing.
1.Dismantling of 02 nos hyd. suspension assly after cleaning from outside. 2.Rep. barrel welding, machining, grinding, honing and polishing. 3.Piston rod straightening and polishing. 4.Suspension assly complete fitting and hyd. testing. 5.Disman
1.Dismantling of 01 no hydraulic tilt cylinder assembly after cleaning from outside. 2.Piston rod straightening and polishing. 3.Piston welding, machining and polishing. 4.Piston rod original shape threading. 5.Tilt cylinder fitting and hydrauli
1. Blade lower side damaged base portion cutting. 2. Base portion developed by new plate cutting, setting and welding with steel electrode. 3. Hole making, cutting edge and end bit fitting. 4. Plate cutting from grounding Machine.
1. Take up wheel build by electrode. 2. Take up wheel machining as per size. 3. New bush fitting by Hyd. Press. 4. All the bushing will be provided by BCCL. 5. New collar making and welding.
1. Take up wheel build by electrode. 2. Take up wheel machining as per size. 3. New bush fitting by Hyd. Press. 4. All the bushing will be provided by BCCL. 5. New collar making and welding.
1. Welding and rebuilding of worn out splines. 2. Machining of rebuilding splines. 3. New splines cutting on shaper machine. 4. Final finishing of splines. 5. Crowd shaft worn out portion rebuilding and machining as per size.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Coal Mines; Making proper arrangement for installation of four nos of 6600V/440V 100KVA to 160KVA Transformer for welding purpose by erection of 6600V OH Electric Double..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COAL MINES; A Repairing of 04nos Impeller welding machining of 2500GPM 120MH Kirloskar Pump SCT200582 and b Repairing of 08 nos Neck ring outer inner weldingmachining of..
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
Please Refer ANNEXURE B in Tender Document
1. Straightening of bend portion drill rod by hyd press machine and alignment checking. 2. Male, Female thread welding and thread making as per required size. 3. Straightening of cylinder rod by hyd press machine in zero alignment.
1.Dismantling of complete hydraulic steering pump assly. And control valve assly. 2.Repairing of housing, welding, machining, grinding, hooning, polishing and facing etc. 3.Control valve body and pump body facing by the lathe machine. 4.Hydraulic
1. Damaged portion drilling, gauzing, welding and new thread making as per bolt size. 2. Changing operator cabin front, back, side and upper glass along with new rubber bit. 3. Denting and straightening alignment of damaged operator cabin.
Repairing, Maintenance and overhauling of (A) Three (03) nos. of Drill Panels and different Coal Drill Machines and (B) Two (02) nos. of 300 Amps. 550V welding machine of 4/5/6 incline, Dhori (K) colliery, Dhori Area
A) Installation of load cell cables in appropriate length and size GI pipes with metallic flexible conduit for 02 nos. of weighbridges, including the dismantling of the previous non-functional system with welding, cutting, and fitting of tranzem
1. Connecting rod damage plate cutting and plate welding. 2. Damage portion plate cutting by gas. 3. Plate cutting from grounding machine. 4. Dismantling of radiator. 5. Cleaning of all tubes by gagging and HCL acid of radiator.
For repairing of vehicles store truck (A) BER 7613 repairing of steering and gear box, radiator job etc.(R.S Loyabad) (B) BER 3025 repairing of Break Systems, water pump and cross member welding(R.S Loyabad) under Sijua Area
1. Repairing of cracked portion of chassis. 2. Gousing of cracked portion of chassis. 3. Repairing of damage portion dust collector. 4. Repairing of yoke assly. 5. Cracked portion welding by steel electrode. 6. Complete repairing, denting of
A 1.Front damage plate cutting size-4x12 2.New plate welding in place of damage plate by steel and low hyd. Electrode. B 1 Damage blade arm broken plate cutting in side lower and upper size-12x4
Following repairing is to be done in BH60M Dumper Sl. No. D-60055, D-3640 and D-10359 of AADOCM, Dhori Area (1) Catwalk, Railing both side, and foot step (ii) Dump body with plate reinforcement, support welding
Rough casting of Lead Base white metal for fabrication of pump bush bearing inner surface of both drive and non drive end required for repairing of 2000GPM/150 Mtr Head WILLO pump of GRD Project.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - COAL MINES; A Repairing of 02 Sets Impeller welding machining of willo HT Pump and b Repairing of 04 nos Neck ring bush distance pieces outer inner weldingmachining of ..
1.Taking out of broken bolts from undercarriage body 26 nos. 2.Making of thread through tapping process. 3.New bolts 26 nos and washers 52 nos fitting. 4.Repairing of ladder and welding. 5.Body cracked portion gousing.
1.Damage platform cutting by gas 2.Damage angle, channel straightening and resetting 3.Damage sheet cutting and new sheet welding 4.Railing complete resetting and nut bolt fitting 5.Ladder straightening and setting 6.Plate cutting from ground