74 live40 closing this weekmost from E-IN-C BRANCH - MILITARY ENGINEER SERVICES and Purvanchal Vidyut Vitran Nigam Limited Varanasi
74 results • Best match
PROVIDING BOUNDARY WALL FENCING AROUND REMAINING PART OF TEMPLE NO 2 AND REPURPOSING OLD RAILWAY WAGONS FOR CHILDRENS RECREATIONAL USE AT FORT AT RAMNAGAR OR AHICHACHHATRA AONLA BAREILLY U P
REPAIR TO FENCING, AREA DRAINAGE, RCC COVER, HARDSTANDING AND REPAIR OF SAND BUTT WITH MISC WORKS OF FIRE RANGE AS WELL AS VARIOUS LOCATION UNDER AGE B/R-II AT AFS CHAKERI KANPUR
Quantum of works involved in erection of wire mess fencing at 400 250 KVA distribution transformer installed at different places under the area of EDSD Purwa And Maurawan under Electricity Distribution Division Purwa Unnao
Quantum of works involved in erection of wire mess fencing at 400 250 KVA distribution transformer installed at different places under the area of EDSD Patan And Bhagwant Nagar under Electricity Distribution Division Purwa Unnao
Construction of Safety Fencing in form of Precast Boundary Wall and Metal Beam Crash Barrier along the track between JNH-LOT Section from Km 778 to Km 847, as per RDSO-approved drawings of Lucknow Division, Northern Railway
CLEANING AND MAINT OF SEPTIC TANK, SOAKAGE WELL, SEWAGE LINE, MANHOLES AND DRAINS AND REPAIR/MAINT OF BOUNDARY WALL, FENCING, GATES AND PERIODICAL SERVICES AND CERTAIN MISC ALLIED WORKS SERVICES AT PTS (VIKAS) UNDER GE (AF) SARSAWA
8564/E8 PROVN OF RAIN WATER HARVESTING SYSTEM NEAR BLDG NO P-3, P-4 OF 606 EME BN AND CONSTRUCTION SHED OF WASHERMAN SHOP OF 306 FD HOSP AND CONSTR OF DEPOT AND KOTE PERIMETER FENCING UNDER GE (EAST) BAREILLY
CLEANING AND MAINT OF SEPTIC TANK, SOAKAGE WELL, SEWAGE LINE, MANHOLES AND DRAINS AND REPAIR/MAINT OF BOUNDARY WALL, FENCING, GATES AND PERIODICAL SERVICES AND CERTAIN MISC ALLIED WORKS SERVICES AT RESTRICTED AREA OF SG SARSAWA UNDER GE (AF) SARSAWA
FRP Fencing Work on 250 KVA and Above under EDSD Manjhanpur
FRP Fencing Work on 250 KVA and Above under EDSD Saini
FRP Fencing Work on 250 KVA and Above under EDSD Sirathu
FRP Fencing Work on 250 KVA and Above under EDSD Chayal
FRP Fencing Work on 250 KVA and Above under EDSD Bharwari
REPAIR AND REPLACEMENT OF JOINERY AND MISCELLANEOUS WORK AT PAO (OR), SPL REPAIR TO SECURITY FENCING NEAR BLDG NO 16 TO POSTMARTEM AREA, SPL REPAIR/REPLACEMENT OF GI PIPE LINE AT JCO MESS TO MD ACCN NEAR VIJAY PARK AT RTS (D), SAHARANPUR AND CERTAIN
FRP Fencing Work on 250 KVA and Above under EDSD P Sharira
FRP Fencing Work on 250 KVA and Above under EDSD Sarai Akil
Fencing work for Power Transformers with a capacity exceeding 250 KVA under Electricity Distribution Circle, Basti
1 Term contract for civil maintenance works for a period of two years at HAL Factory Kanpur. 2 Proposed modification of conference room at CNC shop and enclosure for laser cutting machine in TDS at HAL TAD Kanpur. 3 Fixing of Bamboo Fencing Provision of vertical garden with Drip irrigation system in front of C-type quarters in zero line at HAL Township Kanpur.
Construction of Service building, S&T rooms, gate lodge at level crossing, Rail/ high level passenger platforms, fencing, extension of minor bridges etc. provision of station name board, including dismantling of existing Building structure & fencing, Up gradation/ extension of Level Crossing, Construction of Limited height subway/ Road under bridge in lieu of LC by pushing method of precast box segments under running traffic condition including construction of approaches, provision of height gauges at LHS and L-xings etc. and Linking of BG Track & turnouts, provision of glued joints & SEJs, dismantling of existing track & turnouts, handling, lifting, loading, leading, unloading and spreading of ballast, handling of P.way material including working in BNI/ NI period and other allied works at Dalel Nagar, Chodiala, Aghwanpur station on Lucknow-Moradabad-Saharanapur section in c/with "Longer loops in both direction at Dalel Nagar & Chodiala" and "Extension of Siding to accommodate full train load" in the jurisdiction of Dy CE/C/MB unit on Moradabad division
Electrical Work in Connection with Rebuilding of Rail Beam of Old Washing Line No. 1 & 2 of LKO Yard, Improvement/Up-gradation of North Coaching Complex Washing Line AND Provision of Fencing towards North side Pathway of Sadar Washing Line and Improvement of End Ramp at BSB end Flooring up to C&W office including repairs to office, etc. at LKO, AND Provision of covered Shedand Road Access for ART/LKO under LKO C&W Depot.
Supply, Installation, Testing and Commissioning of 700 Digital Water Level Recorder (DWLR) (Non-Vented pressure type) with Telemetry, including fencing and establishment of Data Acquisition system along with its maintenance etc
Electrical work in connection with provision of Electronics interlocking under remodilling work at LJN yard, Proposal for extension of electric loco shed at Lucknow Jn. yard, CYM Building at coaching Depot ASH, Development of goods platform surface, ... surface, fencing etc. ...
Three phase Distribution box Clamps, Bracket Clamps for 3 ph meter box, Holding clamps for top channel, TPMO and fuse set etc with bolts and nuts, LT Clamps with nuts and bolts of PCC pole with neutral, Earth wire clamps with bolts and clamps, Al PG ... Dog, Barbed wire GI, ...
Dismantling of 11 KV line and LT Line with its dump at suitable place on site up to completion of work and its safe loading/unloading/weithing carriage from dump site to je's store (including broken STP/PCC Pole)., PCC pole 8.5 Mtr long, PCC pole 11 ... of barbed wire /danger ... Bolts, Barbed wire , ...