Loading…
Loading…
304 results • Best match
Removal of Silt and Jungle & repairs of Embankment in selected reaches of D-27 and its minors under TBC.
Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm
Special Repairs to CC lining SR and embankment of at aqueduct no 1 to 3 Dy-17A of IBC. .
Construction of flood protection structures to SWD including RCC retaining walls, Water retention structures, Nature based solution structures / Bridges and culverts under Karnataka Water Security and Resilience Programme (KWSRP) with externally funded project (World Bank) in Yelahanka zone-YNK Package-3 (14 Works).
Construction of flood protection structures to SWD including RCC retaining walls, Water retention structures, Nature based solution structures / Bridges and culverts under Karnataka Water Security and Resilience Programme (KWSRP) with externally funded project (World Bank) in Yelahanka zone-YNK Package-2 (22 Works).
Construction of flood protection structures to SWD including RCC retaining walls, Water retention structures, Nature based solution structures / Bridges and culverts under Karnataka Water Security and Resilience Programme (KWSRP) with externally funded project (World Bank) in Yelahanka zone-YNK Package-1 (19 Works).
Construction of flood protection structures to SWD including RCC retaining walls, Water retention structures, Nature based solution structures / Bridges and culverts under Karnataka Water Security and Resilience Programme (KWSRP) with externally funded project (World Bank) in South zone including KVP Package-l
HAS-MAJN Section:Repairs to the Embankment Slope of Bridge No. 175 by Providing Gabion Walls at Km 54/700-800
Removal of Silt, Clearing Jungle and Repairs to PO s, Embankment, Lining of D-68, 68A, 68B and Its Minors.
Reconstruction of Pipe culvert at ch 0.20 and raising of embankment from 0.10 to 0.20 in Dy-31 of ILC.
Improvements to the Selected Embankment Reaches on SR Side of LBC & RBC of Amarja Project for the year 2025-26
Special repairs to rain damaged SP/CTC at ch 49.60 km and breached embankment formation at 53.00 km under ILC
Special repairs to CC Lining and Raising of Embankment from ch.4.500 to 5.100 km of Dy 20 under IBC
Rectification to damaged CC lininig in embankment portion from Ch. 16.00 Km to 16.500 Km of Dy-18 of JBC
Raising of embankment on service road from Ch 14 to 66 R/S in selected reaches of Distributory 36 and Raising of embankment on inspection path from Ch 272 to 391 L/S in selected reaches of Sub Distributory 36/1 of Distributory 36 of TLBC
Construction of Protection Wall and Raising embankment from Ch0.300 to 0.480 km of Lateral No-5 of Distry 9 (A).
Construction of Flood Protection Structures to Storm Water Drain including RCC Retaining walls, Water retention Structures, Nature Based Solutions Structures, Culverts and Bridges Under Karnataka Water Security and Resilience Program (KWSRP) With Externally Funded Project World Bank In Mahadevapura Constituency Package-05 of Mahadevapura Zone
Construction of Flood Protection Structures to Storm Water Drain including RCC Retaining walls, Water retention Structures, Nature Based Solutions Structures, Culverts and Bridges Under Karnataka Water Security and Resilience Program KWSRP With Externally Funded Project World Bank In Mahadevapura Constituency Package 01 of Mahadevapura Zone
Construction of Flood Protection Structures to Storm Water Drain including RCC Retaining walls, Water retention Structures, Nature Based Solutions Structures, Culverts and Bridges Under Karnataka Water Security and Resilience Program (KWSRP) With Externally Funded Project World Bank In Mahadevapura Constituency Package-02 of Mahadevapura Zone
Construction of Flood Protection Structures to Storm Water Drain including RCC Retaining walls, Water retention Structures, Nature Based Solutions Structures, Culverts and Bridges Under Karnataka Water Security and Resilience Program (KWSRP) With Externally Funded Project World Bank In Mahadevapura Constituency Package-04 of Mahadevapura Zone
Construction of Flood Protection Structures to Storm Water Drain including RCC Retaining walls, Water retention Structures, Nature Based Solutions Structures, Culverts and Bridges Under Karnataka Water Security and Resilience Program (KWSRP) With Externally Funded Project (World Bank) in Bommanahalli Zone Package-01 (31 Works)
Construction of Flood Protection Structures to Storm Water Drain including RCC Retaining walls, Water retention Structures, Nature Based Solutions Structures, Culverts and Bridges Under Karnataka Water Security and Resilience Program (KWSRP) With Externally Funded Project World Bank In Mahadevapura Constituency Package-03 of Mahadevapura Zone
Construction of Seepage drain to Halla near G.Hosahalli in 14th km of D-23 and Improvement of embankment at G.Hosahalli colony
Removal of Silt, Clearing Jungle and Repairs to PO s, Embankment, Lining of D-69, 69A, 69A1, 69A2 and Its Minors.
Repairs to breached section of canal embankment at km 26.39 and Service road at km 21.20 distributary no.16A under RBHLC
Repairs to service Road and C.D of Sub-Distributary 7 to 17C and Repairs to Embankment Sub-Distributary 18 of KRBC
Improvements and repairs damaged portion Canal Lining and Service road,Embankment in selective reaches of d24 between ch1.00 to ch10.00km under TBC
Special repairs to formation of Embankment & CC lining, at Ch 11.50 to 12.00 Km of Dy 25 in selected reaches under IBC.
Clearing jungle,slipped earth and raising embankment in 57th km to 64th km of nbc and d13 coming under nbc(selected reaches)
Construction of Protection Wall and Raising Embankment from Ch 6.200 to 6.500 km of Arakera Branch Canal of NRBC Distry 9 (A)
Special Repairs to Raising of Embankment and CC Lining Aqueduct-1 to Aqueduct - 3 for selected reaches of Dy-17A of IBC
Development of bridge and embankment at Bommaghatta lake in Sandur taluk Ballari dist under 2515-KKRDB Micro for the year 2025-26
Construction of Flood Protection Structures to Storm Water Drain including RCC Retaining walls, Water retention Structures, Nature Based Solutions Structures, Culverts and Bridges Under Karnataka Water Security and Resilience Program (KWSRP) With Externally Funded Project World Bank In K R Puram Constituency Package-07 of Mahadevapura Zone
Special repairs to CC Lining and Raising of Embankment in selected reaches from ch.6.00 to 10.500 km of Dy 18 under IBC
Improvement to service road & Raising of Embankment from km 0.00 to 6.00 km, CC Lining in selected reaches of DY- 18 of IBC
Special repairs to CC Lining and Raising of Embankment in selected reaches from ch.0.900 to 1.400 km of Dy 19 under IBC
Special repairs to CC Lining and Raising of Embankment in selected reaches from ch.1.500 to 2.100 km of Dy 20 under IBC
Construction of RCC Box for G.Hosahalli Feeder Canal in 11th km of D-23 under T.B.C and Improvements of Embankment at G.Hosahalli tank
Construction of retaining wall at 8th km,Providing embankment in 2nd ,11th Km and other Improvements works of D18 of Nagamangala Branch canal
Restoration to the embankment portion and repairs to CC lining of Lateral-2 of BD-1 from ch Km 1.50 to 2.00 Km
Special repairs to CC Lining and Raising of Embankment in selected reaches from ch.0.500 to 1.00 km of Dy 21 under IBC
Repairs to Lining, Embankment, Removal of silt and jungle of D-67 Including Minors and Clearing Jungle, repairs to sopanum at chandre tank.
Removal of slipped earth ,jungle clearence and improvement to embankment of D19 and jungle clearence in Golahalli Sub Distributory Under D20 of TBC
Providing PMC Services including Supervision, Quality control for Construction of Flood protection structures to SWD including RCC retaining walls, Water retention structures, Nature based solution structures/Bridges and culverts under Karnataka Water security and Resilience Programme (KWSRP) with externally funded project (World Bank) in East Zone Package-1.
Providing Stone pitching & flush pointing for the Railway track embankment near Railway Running room to Point No.1 in Marshalling yard area at RTPS
Restoration to Damaged Lining and Raising of Embankment in Not considered Laterals in Dyst ERM of Dy-9 of NRBC (Not Considered in ERM )
Repairs to POs CDs, Gates, Embankment, Lining and Removal of silt and jungle of D-66B, D-67 Including Minors and Thonnur Tank Canals
Removal of jungle of MNP Dam embankment and MNP IB and Improvements to road from Maraladinni tanda to MNP Dam entry gate at RBC
Providing PMC Services including Supervision Quality control for Construction of Flood Protection Structures to Storm Water Drain including RCC Retaining walls Water retention Structures Nature Based Solutions Structures Culverts and Bridges Under Karnataka Water Security and Resilience Program KWSRP With Externally Funded Project World Bank ln Mahadevapura Package04 of Mahadevapura Zone
Providing PMC Services including Supervision Quality control for Construction of Flood Protection Structures to Storm Water Drain including RCC Retaining walls Water retention Structures Nature Based Solutions Structures Culverts and Bridges Under Karnataka Water Security and Resilience Program KWSRP With Externally Funded Project World Bank ln Mahadevapura Package02 of Mahadevapura Zone