Loading…
Loading…
304 results • Best match
Restoration to the embankment portion and repairs to CC lining of Sonthi Branch Canal at Chainage from 9.00km to 10.00km of Sonthi LIS ( In Selected Reaches) for the Year 2025-26.
Restoration of Existing Check Dam Near Ramenahalli Village Including Extension of Body Wall, Key Wall, Wing Wall, Returns Wall, Protection Wall, Pitching and Formation of Embankment in Shirahatti Constituency Gadag Dist
Repairs to POs, CDs, Gates, Embankment, Lining and Removal of silt and jungle of D-66 From ch 0.0km to 5.00km Including minors and D66 RBC, D-66A coming under HLBC
Earthwork Excavation, formation of embankment, Repairs and improvements to the damaged canal lining and structures due to rain flood in Main canal Km 203 to 206Km coming under UTP Main canal.
Restoration to the embankment portion and repairs to CC lining of Sonthi Branch Canal in Between at Chainage from 8.00km to 8.50km of Sonthi LIS ( In Selected Reaches) for the Year 2025-26.
Restoration to the embankment portion and repairs to CC lining of lateral no -7 of Sonthi Branch Canal from Ch. 1.00 Km to 1.60 Km of Sonthi LIS for the year 2025-26
Removal of jungle , silt and strengthening of embankment on Ghataprabha right bank main canal from km no 120 to 122 and km 131 to 148 at selected reaches During the year 2025-26
Balance work of Earthwork excavation, Formation of embankment, C.C. Lining including construction of CD Works in KM- 27, 28 and 29 of Distributary-6 offtaking at Ch. 244.450 Km under UTP Main Canal
Construction of CD in between from salagunda road to kannari village in sindhanur taluk of Raichur district(under flood damage for the year 2024-25) (RESERVED FOR CAT-II A)
Repairs to POs, CDs, Gates, Embankment, Lining and Removal of silt and jungle at ch 10.50 to 19.00 km of Dudda Distributory, Thibbanahally minor, Honnenahally Minor, mudagandur minor Manuganahalli Minor coming under D-70
Restoration Of CC Lining and Embankment reach from chainage 8.50KM to 9.60Km and Grounting (Water proofing) of Aqueduct including trough joint from Chainage 6.70Km to 8.20Km of west main canal under Herkal south LIS.
Repairs to CC lining embankment formation at ch 11.500 TO 12.00 km of Dy-19 (in selected reaches ) and Special repairs to Head wall of outlet of Lat-6 of Dy-19 under IBC
Balance Earthwork excavation, Formation of embankment, C.C. Linning including construction of CD Works of KM-1 to 18 & KM-22 to 33 of Dy-6 offtaking at Ch. 244.450 Km under UTP Main Canal
Due to heavy Rain in august and september month of 2025 surrounding command area of LBC of BNT resulting in Flood so embankment,lining and escape damage occured so to give water to farmers restoration of damaged portion is necessary so this work is taken up
Removal of Silt, Jungle and raising of Embankment in Vulnarable reachesof Dy. No. 9A, 9R, 9C, 10, 11, 12, Hirebelaguli Minor, Kadavinakote Minor, Kadavinahosahalli Minor, Bagivalu Minor, 16, 17 of HLBC for the Year 2026-27 .
Repairs to POs, CDs, Gates, Embankment, Lining and Removal of silt and jungle at ch 12.00 to 18.00 km of Kalenahalli Distributory, Nanjenahalli minor, Maralekere minor, M.Hatna minor & Bolenahalli Left Bank Canal coming under D-70
Removal of Silt , Jungle, Scoure Filling, Road formation and Embankment rising Works in selected reaches 46 Block, 46B, 47, 48B, 49, 50 51 Block and its Sub distributaries coming under of MRBC for the year 2025-26.
Special repairs to Raising of Embankment ,CD work, CC lining, of Lateral No R-2 from Ch 0.00 to 2.50 Km, and Special repairs to SR formation from Ch 0.00 to 4.50 Km of Dy-23 in selected reaches under IBC
Repairs to cc lining and Raising of Embankment in Lat-2 from 0.05 km to 0.250 km of Dy-29 of ILC and dy 29 from km 9.6 to 9.79 and dy 28 from km 3.4 to 3.62 km ( Selected Reaches)
Consultancy Services for Survey, Investigation including detailed engineering, preparation of designs, drawings, estimates and draft tender documents for RCC trough aqueduct from NRBC Ch. 153.040 to 153.840 Km of NRBC Extension (Instead of canal ... canal embankment in ...
LOWERING /LEVELLING, EARTH CUTTING AT NORTH EAST PORTION OF THE SITE, EARTH FILLING,LEVELLING,PREPARATION ,EMBANKMENT AND RELATED WORKS AT SOUTH EAST CORNER OF LOW LAYING /WATER LOGGING AREA IN NEW MEGA DAIRY SITE,KIADB INDUSTRIAL AREA, HASSAN, FOR HASSAN MILK UNION.
Construction of retaining wall at Km 98.150 to protect the embankment and Construction of widening of Pipe Culvert at Km 76.300 Km 77.800 Km 85.450 Km 87.900 Km 88.320 88.360 Km 89.950 and Km 109.900 and diversion of road and providing sand bag etc
JRU- Provision of shunting neck on Road-4 for a length of 300 m towards SLU end in JRU yard SW-I:-Ancillary track work for linking of track SW-II:- Extension of RUB no 62A along with provision of retaining wall to retain embankment
AME of Providing and supplying out source employees for maintenance of Hemavathy Dam Embankment portion, Spillway, Drainage gallery, Maintenance of Hemavathy Dam Gates, Maintenance of Electrical works, maintenance of roads and plantation of Dam premises and Maintenance of Circuit House for the year 2025-26.
Repairs to damaged Pipe Aqueduct Headwlls in Dy-9A and Dy-10 of HRBC, Repairs to slipped Embankment in the D/s approach of Aqueduct at Dy-4 of HRBHLC and Removal of Silt and Jungle in selected reached in the distributories of ABLIS (Balance reach)
Restoration of under Tunnel/Box Culvert at 13.60 km, 14.675 and 17.580 kms and improvements to the SP/CTC at CH.16.250km, 16.620km, 17. 600km, 22.100km, 22.475km, 23.250km, 23.450km, Formation of Embankment, CC lining formation of SR/IP of Mundaragi Branch Canal of Singatalur Lift Irrigation Scheme.
Design and Construction of formation in embankments, cutting including blanketing, Major bridges, Minor bridges, RuB, ERS/retaining wall, sacrificial retaining wall, drains, boundary wall ,fencing works and Station boxes of Nagawara and Kanakanagar
Design and Construction of Formation In Embankments/Cuttings/Blanketing, MIBs, ROBs, RUBs, ERS/Retaining Wall, Drains, Boundary Wall, Fencing Works In At-Grade Section of Length 12.632 Km and Other Related Infrastructural Works
Raising of embankment on service road from Ch 547 to 550 R/S, on inspection path from Ch 577 to 587 L/S, Ch 599 to 618 L/S, Ch 650 to 656 L/S and Removal of silt from Ch 512 to 540 in selected reaches of Distributory 36 of TLBC
Special Repairs to CD at SL-3 of R-9, C.C Lining, embankment formation at Ch.5.50Km, Ch 8.10Km, Ch.14.40Km of Dy.22 and IBC Main Canal at Ch.105.00Km and Special repairs C.C.Lining and damaged CTC Head wall of Lateral No.3 at Ch.1.50Km of Dy.23 under IBC.
Repair of canal lining of Sonthi main canal from Ch.5.00Kms to Ch.10.00Kms Repairs to canal lining and embankment and Outlet repair of Distributary-5 of SMC from Ch.0.0 to 2.345Kms and SR Improvement of Distributary-1 of SMC from Ch.0.00 to 1.500Kms in selected reaches of Sonthi LIS.
Hubballi Division- Londa - Miraj(LD-MRJ) proposal for construction of retaining wall cum drain to protect the embankment on both UP-line.(at KM.717/500-719/300) and DN-Line (at Km.716/714-718/250 and 718/250-719/600) sides between Kudachi-Ugarkhurd(KUD-UGR) stations.(Maintenance Period:12 Months)
Restoration of CC lining and embankment of Lateral No4 of Dy13A under CLIS East Canal
Design and Construction of Formation in Embankments, Cuttings including Blanketing, Ramp, ROB, Minor Bridges, RUB, ERS/Retaining Wall, Sacrificial Retaining Wall, Drains, Boundary Wall and fencing At-Grade Section of 5.80 Km and Ele Viaduct of 185m
Design and Construction of Formation In Embankments /Cuttings, Blanketing, MIBs, RUBs, MJBs, ERS/Retaining Wall, Drains, Boundary Wall, Fencing Works In At-Grade Section of Length 6.259 Km, Elevated viaduct of length 3.681 km and Other works
Special repairs to CC lining embankment formation at ch 169.00 km and CTC at ch 0.100 km of Lat-4 of Dy-46 of IBC and Construction of CTC at ch 1.300 km and ch 1.850 km of Lat-1 of Dy-39 and Improvements of SR of Lat-3 of Dy-44 of IBC.
Earthwork Excavation, Formation of Embankment, Providing Canal Lining to Damaged Portion of Canal network due to Rain flooding, control the Seepage to adjacent affected lands and improvement of SR and IP fromCh 32.300Km to Ch 32.500Km and Ch 34.800Km to Ch 35.00Km , Ch 35.300Km to Ch 35.800Km of Dy-2 coming under UTP Main canal.
Earthwork excavation, formation of embankment, providing lining to canal damaged portion due to rain flooding and control of seepage to adjacent affected land, improvements to S.R and I.P side of canal , Repairs and improvements to the damaged canal structures of Direct minor 36, direct minor 40 and its sub minors and corresponding CD works under UTP canal network.
Earthwork excavation formation of embankment, providing lining to canal damaged portion due to rain flooding and control the seepage to adjacent affected land, improvements to S.R and I.P side of canal ,Repairs and improvements to the damaged canal structures of UTP main canal from Ch 179.800Km to Ch 180.230Km and 182.460km to 182.850km under UTP canal network
Earthwork excavation, formation of embankment ,providing lining to canal damaged portion due to rain flooding and control of seepage to adjacent affected land, improvements to S.R and I.P side of canal, Repairs and improvements to the damaged canal structures from Ch 8.650Km to Ch 9.500Km and corresponding CD works of Distributary-3 canal under UTP Canal network.
Earthwork excavation, formation of embankment ,providing lining to canal damaged portion due to rain flooding and control of seepage to adjacent affected land, improvements to S.R and I.P side of canal ,Repairs and improvements to the damaged canal structures Ch 3.500Km to Ch 10.00km their corresponding CD works of Sub - Distributary canal under DY-3 of UTP Canal network.
Earthwork excavation, formation of embankment ,providing lining to canal damaged portion due to rain flooding and control of seepage to adjacent affected land, improvements to S.R and I.P side of canal ,Repairs and improvements to the damaged canal structures of Minors 1, 2, 3 & 4 and their corresponding CD of Distributary-3 canal under UTP Canal network.
Filling The Road Potholes on the rathabeedi road,near temple, near chandan juvelars, near manajivitha medicals, near male madeswara canteen, and near old bus stand and on new private bus stand road ,stadium roads, and Laying gravel embankment for side shoulders infront of mahalakshmi sweet road , and Repairing interlock paving near chamarajeshwara park and ugd repair works
Restoration to Breached portion
DEN/South/SBC Section: Karuvalli : Widening of old platform, Additional loop line 1 no, approach road(500x6m), Retaining wall for platform and toe wall for embankment, Earthwork, Extension of 2 nos of Box culvert (Br.no 43,44), Dismantling of old station building, cable hut room, divangjan toilet, public toilet and SnT building at Karuvalli station(Km 22/800-21/800). (Composite work). Maintenance period is 12 months
Earthwork excavation , formation of embankment ,providing lining to canal damaged portion due to rain flooding and control of seepage to adjacent affected land,improvements to S.R and I.P side of canal ,Repairs and improvements to the damaged canal structures of Distributary-3 canal from Ch 6.800Km to Ch 7.300Km, Ch7.500Km to Ch 8.00Km and Ch 21.800Km to Ch 22.00Km coming under UTP Main canal.
1Improvements to Damaged Canal Bund at Dy No.24 of HRBHLC.2) Repair works to Damaged Main Canal Bund at CH1200 M and South Branch Under Tunnel at CH1800 M and 2400 M of HMLIS.3) Removal of silt and jungle in Dy.No.32A ,34A, 38 Minors and Hiritalalu ... Breached Embankment Portion ...
Package-II Removal of silt and Jungle in Selected reaches of Maigur Dy and Its Minors (Km 0.00 to 8.00), and Other Repair Works, Terdal Dy, Jagadal & Hosur Dy, Nandagoav Dy (km 0.00 to 5.00), OL No. 11 of Terdal Dy including improvements to Service ... of embankment ) ...
Improvements to service roads and damaged portion of CC Lining in selected reaches from Ch3.80 to 4.50km, Ch 6.90 to 7.20km and Ch 10.50 to 11.00 of NRBC D-9(A) 2)Improvements to service roads and damaged portion of CC Lining in selected reaches and ... 3) Embankment Raising ...
Improvements of Road to continued from Narona village to Bilagunda village, Improvements to Sangolgi (C) village Road, Machendra Devate house to basavaraj Sutar house, Construction of CC road and drain from Madhumati Dahivade house to Savaleshwar ... under Flood Damage for ...