Loading…
Loading…
304 results • Best match
Damage due to Flood in august and september month Lining,SR ,IP and embankment portion damaged in severe condition. to give water to farmesr of command area and to safe guard canal system this work is taken up.
Construction of Pipe Cut and Cover at Km No-1 of minor -3 of Dy-4 Under UTP Main Canal, Construction of Embankment , CC Lining at breached /damaged portion of canal from Ch 1.660 to 1.70 Km /Minor-3 of Dy-4 and Construction of additional SP/CTC at Ch 4.800 Km, 4.90 Km, 4.95 Km, ch 6.050 Km, Ch 8.260 Km ,Ch 9.40 and 12.825 Km of Dy-6 offtaking at Ch 244.450 Km of UTP Main Canal and Construction of RCC trough on Both sides of canal to pass side drain water at road bridge at Ch 9.220 km of Dy-6 of UTP Main canal
Maintenance of Canal system, intakes for supply of water to field for irrigation purpuse duly maintening / operation of sluice gates / head regulater / escape regulators, removal of jungle of all types on SR & IP , slopes of the canal, removal of ... canal embankment / ...
Removal of Jungle & Silt from Ch-0m to 8700m in Bijumaranahalli Branch canal, Construction of Silt trap at ch-4500m of Dandiganahalli Branch canal under 2nd Stage of Kachenahalli LIS, removal of silt & jungle in lower contour canal of vontigudda lift ... of Embankment in ...