Loading…
Loading…
5,735 results • Best match
De-silting and Sectioning of Canal embankments in between RD.0.00Km to RD.0.510Km, repair of fall at RD.0.220Km, RD.0.350Km, RD.0.440Km, RD.0.510Km and RD.0.660Km of Maharajpalli Minor and cement concrete channeling at vlunerable reaches in between R
De-silting and Strengthening of Canal embankments, structure repair and cement concrete channelling at vulnerable reaches in between RD.0.00Km to RD.0.810Km of Tindraspalli S/M-I, RD.0.00Km to RD.1.005Km of Tindraspalli S/M-II, RD.0.030Km to RD.1.200
Construction of addl. VRB at RD.0.590Km of Sarabanpalli S/M-II, De-silting and Strengthening of Canal embankments and cement concrete channeling at vulnerable reaches in between RD.1.750Km to RD.2.220Km of Sarabanpalli Minor and RD.0.360Km to RD.0.
Construction of Pedestrian Guard railing with paver block and safety kerb on canal embankment between Manasapolo to Check Gate on NH 20 Ch. 189.680 to Ch. 190.093 Km. for the year 2026 27.
FDR to Bardia OAE on Gobari left embankment from RD 900 m to 1170 m, from RD 250 m to 700 m, Jankoti OAE on Sukanai left embankment near village Jankoti, Khartang OAE on Birupa right embkt. from RD 150 m to 600 m, near village Khartang Sethi Sahi,
Protection to scoured bank on Righagada Nalitapata Saline Embankment of Brahmani Right from RD 4.340 km to 4.410 km
Improvement to Malaguni right embankment from Mashania bridge to Raktapata from RD 9.648km to 13.136km (Working RD 9.648km to RD 13.136km
Improvement to road of Kathajodi Left Embankment from RD 3.050km. to 3.800 km. for the year 2023-24. (MBD46/2023-24)
Protection to Kusumi right embankment from PWD Road to Jadunathpur Sasan (From RD 3.3Km to 6.0Km) for the year 2023-24.
Restoration and protection to scoured bank of Paika left embankment between RD.7.00 Km to RD.7.900 Km near village Ukusahi.
Improvement to Kuakhai Left Embankment from RD 1.430 Km. to RD 2.700 Km. (Approach to Nuagada village near RD 7.00 Km.)
Improvement to Makara left embankment from RD 1600mtr to 2300mtr (Bodal bridge to Badaora via Ogalpur) (Working RD 1600mtr to 1975mtr)
Construction of Guard wall and slope packing on Kuanria Right embankment near village Sikrida for 2023-24(RD 700m to 1200m)
Improvement to service road on OAE 62 (B) on Paika Right embankment from Saralapur to Nalapur (RD 10.00km to RD 16.00km)
Earth work , Dumping work and Stone work
Earth work, Stone work and Dumping work
Earth work and Stone work
Earth work and Stone work
Improvemnt to Communication facility on left Embankment of Ganijanga Distributary from RD 7500 mtr to 8600 mtr for the year 2025-26
Improvement to road from NH-16 Old NH-5 to Kanpur Right Embankment of river Kuakhai from 0.00 Km to 11.500 Km
Deepening, widening of Garland drain and heightening and strengthening of embankment to prevent entry of water inside mines boundary of Bharatpur OCP
Construction of 2-laning road of Daya right embankment from 0/000 km to 8/591 km in the district of Khordha
Construction of Salandi Left Embankment from village Barikpur to Bilana from RD 77.500 Km to 86.00 Km (Working RD 77500m to 84700m)
FDR to Daya left embankment at RD24.530km,24.560km,24.590km,24.600km,25.100km,25.205km,25.410km25.480km,25.460km,26.300km,26.270km,26.315km,26.980km,28.440km,29.245km,29.465km,30.370km
Construction of two nos of low level spurs on Karandia left embankment near village Sisua Jena Sahi for the year 2024-25
Restoration to Chitrotpala left embankment from RD 20.820 Km to RD 21.500 Km with Gada (Naganpur Gada to Kamalei Banka Hanuman Gada)
Protection to scoured bank on Nuna- Karandia Right embankment from RD 22.850Km to 23.027Km near village Fakirabara for the year 2023-24
Protection to scoured bank on Nuna-Karandia right embankment from RD 11.400km to 11.523km near village Garam for the year 2023-24
Improvement to Sapua left embankment from Ichhapur to Gudupada and on Sapua right from Balipatna to Matikota for the year 2024-25
Raising and strengthening with protection to scoured bank on Nuna karandia right embankment near village Gaudagaon Gherry for the year 2024-25
Construction of Guard wall and slope packing on Mahanadi Right embankment near Sidhamula Pry School for 2025-26 (RD 100mtr to 600mtr)
Protection to Sulia Right and Left Embankment Near Hinjiligadia (from RD 0.00m to 600.00m) of Nayagarh District for the year 2025-26
Construction of CC road from Malgodown Behera sahi and Malgodown Dock Sahi to Kathajodi Embankment at Balisahi basti in Ward No.51.
Restoration to the Flood embankment of right bank of river Udanti near village Chhapria from RD 250m to 600m under Golamunda Block.
Improvement to Dahuka left Embankment near Daliamada from RD 5170 m to 5770 m of Nayagarh District for the year 2025-26.
Improvement to Dahuka right embankment near Durudura to Udaypur (from RD 3690m to 5055m) of Nayagarh District for the year 2025-26
Repair and Restoration of Rural Road of Sahupada river Embankment to Nilakanthapur for the year 2020-21 in the Dist. of Puri
Protection to scoured bank on Nuna Karandia right embankment from RD 23.010 Km to RD 23.250 Km for the year 2025-26
Improvement to Mahanadi Left embankment from Kandarpur to Routrapur from RD 1.600 Km to RD 3.000 Km for the year 2024-25
Raising and strengthening with protection to scoured bank on Nuna karandia right embankment near village Karandiapatna Gherry for the year 2024-25
Improvement to Kusumi right embankment near village Nuapalli to PWD road (from RD 0.00km to 3.00 k.m.) for the year 2024-25
Revival of Mitiani Nallah and Construction of Road cum Embankment on Northern Side of The Nallah as Protection Structure on Turnkey Basis
Restoration to Mahanadi left from Mangarajpur to Sankhamari embankment from RD 1500 m to RD 1800 m for the year 2022-23
Repair and Restoration to Irrigation Embankment (Pachipal) to Chiginia, Bauribasta, Krushnasaranapur road in the District of Puri for the year 2021-22
Construction of road with Guradwall from Acharya Harihar Bidyapitha Playground to Kuakhai river embankment via Totasahi at Uttamapur in Ward No.56.
Irrigation Embankment Road to Saranga under routine maintenance for the year 2019-20.(From R.D. 0/470 K.M. to 0/690 K.M.)
Shifting of C and D waste, debrises, such as bricks, concrete, plaster, sand etc from Brahmani bandha embankment in ward no 05
Construction of CC paver road from Sani Mandir Towards Mangala Temple on the Embankment of Siba Sagar Tank in Ward No 05
Protection to scoured bank on Nuna Karandia right embankment from RD 24.950 Km to RD 25.200 Km for the year 2025-26
Const. of Bridge over Daya West Branch Canal on Kuakhai right embankment to Barang Railway Station road in the dist. of Khurda