Loading…
Loading…
5,735 results • Best match
Repair to East Kania Embankment to Puri Satapada NH-203 via-Gopalpur road in the District Puri for the year 2023-24.
Protection to Right Flood Embankment of river Udnati near village Masigaon from RD 160m to 310m of Bhawanipatna Block ini Kalahandi District
Construction of road from Pratapnagari to Sankhataras on left Embankment of KBC in the District of Cuttack for the year 2025-26.
Protection to scoured bank on Nuna-Karandia right embankment from RD 0.240km to 0.346km near Karilopatna Gherry for the year 2023-24
Protection to scoured bank on Karandia left embankment from RD 0.240Km to 0.390Km near village Ayitipur Dhobasahi for the year 2024-25
Construction of 2 Nos. low level spurs along with launching apron on CE No.78 (A) Mahanadi right embankment near village Rahama
Raising and strengthening of Sultania OAE on Birupa right embankment from RD 00 to RD 1530 m for the year 2026-27
Slope protection on Chitrotpala right embankment at RD 25.100 Km and RD 25.500 Km near village Uttarkul for the year 2026-27
Improvement and slope protection to left flood embankment of Bhainsimundi nallah near D/S of PWD bridge for the year 2026-27
FDR to Bhailipur flood embankment in between RD 3.150 km to 4.350km and Luna Ratnachira left bank at RD 2.900 km
FDR to piping at RD 15.18 km, 15.23 km, 15.26 km, 15.30 km, 15.45 km, 15.80 km of Bhargovi right embankment
Protection to scoured bank of C.E.No.44 A Nuna left embankment from RD 33.776 Km to 33.850 Km near village Kaliaboda.
FDR to piping closing and puddle filling of Bhargovi right embankment at RD 21.600 km, RD 21.700 km and 21.800 km
Imp of service road on KV left embankment from RD 73.50 (Liakhia Gada) to 65.50 Km (near Talamalasahi UP school Gada)
Improvement to communication facility on Bhargavi left Embankment from RD 30.50 Km to 31.40 Km and 34.10 Km to 36.20 Km
Improvement to Service Road on Kushavadra Right Embankment from RD 19.800 Km to 20.30 Km and 22.50 Km to 27.00 Km
Protection to Daya Left Embankment with lunching appron from RD.25.940 Km to 29.490 Km in Delanga Block of Puri District.
Protection to the Scoured bank river Hansua right on Keredagada Altanga Saline Embankment from RD 00m to 28m near village Jagannathapur
Improvement to Service Road of Gobari right near village Bahar sobala from RD5592 m to 5662m on Mahakalapada Chappali Saline Embankment
Rain cut filling and Jungle clearance on C.E.No.34 (b) A Birupa right embankment from RD 48.868 Km to 57.650 Km.
Protection to scoured bank on Pachupali Pantala Saline Embankment from RD 00 mtr to 70 mtr of Patasala Left Bank
Repair of fall at RD.4.050Km, RD.5.080Km and RD.5.370Km of Goraspalli Minor, De-silting and Strengthening of Canal embankments and cement concrete channeling at vulnerable reaches in between RD.0.00Km to RD.3.690Km of Goraspalli S/M-III and from RD.1
Jungle clearance, De-silting and strengthening of Canal embankments in between RD.0.100Km to RD.2.370Km of Malavaram S/M-V and cement concrete channelling from RD.1.780Km to RD.1.895Km of Malavaram S/M-V and from RD.0.750Km to RD.0.845Km of Malavaram
Channeling with bed concrete from RD.0.090Km to RD.0.440Km of Pendikonda S/M-I, De-silting and Strengthening of Canal embankments from RD.0.00Km to RD.3.00Km of Pendikonda S/M-I and RD.0.00Km to RD.0.540Km of Pendikonda S/M-II.
FDR to Banapur Gheri Bandh and Mahanadi right embankment with partial damage at patches and heavy damage at Banapur.(Sl No.4)launching
Construction of Guard wall and slope packing on Kuanria left embankment from Madhyakhanda to Jaganathprasad for 2023-24(RD 1300m to 2300m)
Improvement to Dochhian Temple gherry on Makara right embankment near village Dochhian from RD 500mtr to 1070mtr ( Working RD 500m to 877m)
Protection to Kusumi left embankment from Chinera to Lathipada with one number of additional vent near Lathipada for the year 2023-24
Restoration to Mahanadi left embankment (near Baulanga) from RD.14.00 to RD.17.00 Km.(Paika left RD0.300 Km to RD.0.600 Km)
Construction of toe wall in KSDR Embankment from RD 60.52 to 60.60 Km., 61.20 to 61.32 Km. and 61.50 to 61.60 Km
Slope protection to Bhargavi right embankment from RD (-) 0.400 km to 0.00 km and 0.00 km to 0.750 km near Uttara bazar
Improvement to Subhadrapur gherry on Makara right embankment from RD 00 to 2000mtr (Subhadrapur village to Chilika) (Working RD 00 to 495mtr)
Improvement to river embankment road of CE No. 78(A) on Mahanadi right from RD23.500Km to 26.500KM (Working RD 22.500Km to 24.200Km)
Improvement to Service Road of Kathajodi Left embankment from RD 2.200km. to 3.400 km. for the year 2026-27.(MBD56/2026-27)
Bank Protection to Scoured Bank on Kani Kharasuan Right near village Bhuinpur.
Protection to scoured bank on Baitarani Right near village Bajarpur From RD 13530 Mtr to 13630 Mtr on CDB Saline Embankment
Improvement of Road from N.H.-16 Old NH-5 to Naharkanta College Left Embankment of river Kuakhai from Ch.0.000 Km to 2.500Km
Improvement to River embankment to Isaniberahampur road in the district of Cuttack under MMSY-Improvement Existing RD road for the year 2025-26
Improvement of Gadas on Genguti right embankment and construction of parapet wall in between village Gadjit and Achyutabasanta for the year 2025-26
Fabrication, supply, transportation and erection of Sluice Gateat RD 1185M on Jamboo BaulakaniSalineEmbankment under Aul Embankment Division, Aul for the year 2024-25.
Improvement and Slope Protection to Left flood embankment from RD 110m-322m of Saipala nallah near Dharol village for the year 2025-26
Construction of FPE on right bank of Hariharjore from downstream of existing embankment from RD 165 m to RD 542m near village Hilung
Supply, installation and commissioning of Street Lighting system along embankment road from Bankibahal chowk to Tumlia chowk (2.7Km) at Kulda OCP, Basundhara Area
M/R to Mahanadi left embankment from RD 00 Km to 25.950 Km, Panimandua Gherry and Sahukheta Gherry for the year 2026-27
Protection to scoured bank on Chitrotpala right embankment from RD 27.085 Km to 27.200 Km near village Manijanga for the year 2025-26
Protection to scoured bank on Chitrotpala left embankment from RD 45.100 Km to 45.220 Km near village Pikirali for the year 2025-26
Improvement to Mahanadi right embankment and construction of bathing ghat near Baleswar Temple, Rautapada village at RD 6.00Km for the year 2025-26
Protection to scoured bank on Karandia left embankment from RD 2.900Km to 3.100Km near village Salara Malick Sahi for the year 2023-24
Protection to Dahuka Right Embankment Near Similisahi, Nayagarh from RD 6050 m to 6450 m of Nayagarh District for the year 2025-26
Protection to Duanto Right bank Embankment Near Notar village, Nayagarh from RD 2150.00M to 3800.00M of Nayagarh District for the year 2025-26