Loading…
Loading…
5,735 results • Best match
Repair of CD at RD.56.048Km, De-silting and strengthening of Canal embankment at vulnerable reaches from RD.54.790Km to RD.55.240Km of GMC.
SR to Pattamundei Canal Embankment to Kuanrpur Road in the District of Cuttack for the year 2022 23 RD 0900 Km to 3060 Km
Cleaning of Nayanjori along toe of Left and Right embankment of Puri main Canal from Nuapatna Culvert to Hanspal square of Ward no 4
S/R TO IRRIGATION EMBANKMENT TO SADANGA ROAD FROM 0/00KM TO 0/900KM IN THE DISTRICT OF KEONJHAR FOR THE YEAR 2023-24
Construction of road from Daya River Embankment Nistarinipur to Madhipur road under MMSY-CMRL in the Dist. of Khordha for the year 2024-25
Restoration of Chitrotpala left embankment from RD 43.730 Km to RD 43.840 Km with gada at RD 43.380 Km and 43.720Km near village Narasinghpur
Improvement to service bank on C.E No.34B Birupa right embankment near village Gopinathpur to Malihata Gadi road from RD 12.100Km to RD 13.500Km
Providing temporary rest shelter cum cycle shed along with replacement of rock filled wall on the embankment of siding No-08 under Bharatpur OCP
Improvement and Slope Protection of Left flood embankment of Kokrijhore nallah down stream of PWD bridge near Shakti village for the year 2025-26
Repair Renovation of Tebeda Sluice Gate at RD 6 544 Km of Irribina to Nuaratanpur Saline Embankment under S E Mahanadi South Division Cuttack
Protection to scoured Bank on Chitrotpala right embankment from RD 14.200 Km to RD 14.400 Km near village Jaladia for the year 2025-26
Protection to Scoured Bank on Chitrotpala left embankment near Gadadhar Pitha (working RD 23.850 Km to RD 23.911 Km) for the year 2020-21
Improvement of Sahupada river embankment to Nilakanthapur road in the Dist. of Puri under Improvement of Existing RD road for the year 2022-23
Construction of road from Gaindala bridge to gabakunda Embankment via Nuagaon under MMSY-TRIP in the dist. of Puri for the year 2023-24
Improvement to service road from RD 43.580 Km to RD 48.480 Km on Chitrotpala left embankment (Narasinghpur to Narayanpur) for the year 2020-21
Protection to scoured bank on CE 34(B) Birupa right embankment near village Tulasi Dash Matha at RD 5.330km for the year 2023-24
Protection to scoured bank on Birupa right embankment (CE No.34B) from R.D. 8760m to 8860m near village Ganipur for the year 2020-21
Improvement to Chitrotpala right embankment from RD 1.050 Km to RD 3.100 Km from village Guali to Harichandanpur Bridge for the year 2021-22
Replacement of Gates Hoists and Mechanical Bridge of TELIJURI Sluice in KSDR Embankment under Superintending Engineer Prachi Division Bhubaneswar for the year 2024 25
Improvement and Beautification of Maneswar Mandhata Temple Park Such as Step Modification Filling Of Temporary Pond Improvement Of Embankment at Maneswar Ward No 40
Protection of embankment at erosion prone Area with sand bags in different locations inside KOCP mines of Basundhara area for 2025-26 monsoon period
MAKING OF EARTHEN EMBANKMENT ALONG BRAJSAGAR NALLAH AND NORTH EAST SIDE OF Z PATCH FOR LENGTH OF 270 MTR AT KOCP, KA RE TENDER
Construction of guard wall on C/S with Stone Packing on Chitrotpala left embankment near Baghuni Sluice at Narayanpur for the year 2020-21
Improvement to Service Road from RD. 00M to 400M to connection to Kusei right Jalasuan Embankment at RD. 945M for the year 2024-25
Construction of guard wall with stone Packing on both side of embankment at RD 1.350 Km near Purusottampur Sluice for the year 2020-21
Construction of Five (5) Nos. of Drainage Sluice at RD 825M, 1040M, 3300M, 3465M and 6825M of Baitarani Right Embankment from Batto to Ranapur.
Construction of protection wall from RD 0.00m to 100.0m on Kusumi right embankment near village Bhutadihi of Nayagarh District for the year 2025-26
Improvement to service road on Chitrotpala left embankment from RD 35.560 Km to RD 36.060 Km near village Pundalo for the year 2026-27
Protection to scoured bank on Kani mouth on Birupa right embankment from RD 1700 m to RD 1850 m for the year 2026-27
Renovation of sluice at RD 5.800 km of Gabakund cut left embankment near village Thorab and at RD 3.00 km near village Jamarsuan
Improvement to Jharling-Belanga Saline Embankment from RD 11.70Km. to 12.10Km., RD 12.950Km. to 14.150, RD 15.50Km. to 16.30Km. and 18.60Km. to 21.50Km.
FDR to piping to Daya left embankment at RD 19.500km, 20.700 km, 20.720 km, 20.740 km, 20.780 km,22.210 km and 23.900 km
Improvement to T.R. Embankment from Davar to Santrash and Bamanal from RD 3.20 Km to 4.400 Km and 6.500 Km to 8.500 Km
Improvement to Devi Right Embankment from RD 80.00 Km to 85.00 Km (Working RD 80.00 to 80.90 Km and 83.00 to 85.00 Km)
Improvement to service road on Badapal Nagari ghat Saline embankment on Saunlia right from RD 00 Mtr to 500 Mtr (From Sompur to Malikana)
Protection to scoured bank of CE No. 78(A) Mahanadi right embankment from RD21.840Km to 21.940Km. near village Balisukuri (Working RD 21.840Km to 21.923Km)
Improvement to service road on Badapal Nagari ghat Saline embankment on Saunlia right from RD 1796 Mtr to 2296 Mtr (From Malikana to Ghodadia)
Protection to scoured bank CE No. 78(A) on Mahanadi right embankment from RD28.30Km to 28.500Km. near village Berhampur (Working from RD28.390KM to 28.530Km)
Restoration to sliped bank of C.E No.78(A) Mahanadi right embankment from RD34.150Km to 34.210Km. near village Bankal (Working RD 34.260Km to 34.310Km)
Restoration to saline embankment on Baragudipada to Khatikolada from RD.0.00 Km to RD.3.65 Km (Working RD.0.00 Km to RD.1.400 Km)
Restoration to saline embankment on Fathepur to Guamunda from RD.10.50 Km to RD.13.50 KM (Working RD.4.49 Km to RD.5.49 Km)
Protection to scoured bank on C.E No.78(A) Mahanadi right embankment from RD.34.640Km to 34.710Km. With launching and packing near village Bankal
Protection to Scoured Bank from RD 1345 Mtr. to RD 1475 Mtr. on Mahanadi right embankment for the year 2026-27.(MBD51/2026-27)
dumping and packing work
dumping and packing work
Stone work
Earth work, Stone work and dumping work