Loading…
Loading…
5,735 results • Best match
Dumping and packing work
Earth work, Dumping and Packing works
dumping and packing work
Restoration to left bank
Earth Work, Stone Work, Concrete Work
Earth Work, Stone Work, Concrete Work
Scoured bank Protection to OAE No. 16B on Kharsuan right near Bahadalpur to Chintapalli
BANK PROTECTION TO THE LEFT BANK OF RIVER BUDHABALANGA NEAR VILLAGE BHANJABATI TO BAGHUAPAL.
Improvement to canal embankment road from RD 00M to 980M of Kujimahal MIP in Bhubaneswar block of Khordhadist CAPEX scheme for the year 2024-25
Providing and placing sand bags for protection of road embankment inside mine during monsoon-2022 as and when required basis under BOCM of Lakhanpur Area.
Routine Maintenance of East Kania Embankment to Gunthapilipila road in the district of Puri for the year 2020-21. (Ch.0/000 to 5/000km).
Protection to scoured bank on Birupa right embankment (C.E No-37B) near village Gopinathpur from RD 1000m to RD 1120m for the year 2021-22
Improvement to Left Service embankment of Taladanda Main Canal from RD 18.350 Km to RD 26.535 Km and RD 30.030 Km to RD 32.177 Km.
Construction of Bathing Ghat and protection to scoured bank on Nuna Karandia right embankment from RD 10.510 Km to RD 10.590 Km near Ramachandi Pitha
Construction of road from Kuakhai Right Embankment to Mancheswar via Gadhakana road in the Dist. of Khordha under MMSY-TRIP for the year 2023-24
Raising and Strengthening of Embankment on Ramial Left from Badabila to Saradhapur from RD 700m to 1500m of Kamakhyanagar Block. (Working RD 700m to 1262m).
REPAIR AND RENOVATION OF GATE AND HOIST OF SLUICE AT SHIKHAR ON DEVI RIGHT EMBANKMENT AT RD 67.30 KM UNDER EXECUTIVE ENGINEER, PRACHI DIVISION, BHUBANESWAR.
Repair to Right Embankment of Jajpur Main Canal from 4.00K.m to 5.650K.m (Such as repairing with WMM, BM SDBC etc) for the year 2024-25.
Improvement to Kathajodi right embankment road between Naraj-Trisulia road from 0/000 to 7/000 km in the district of Cuttack under State Plan
Improvement to Communication facility on left embankment of right main canal from RD. 00Km to 15.00Km (working RD. 00M to 6.20Km) of Kanjhari Irrigation Project
Improvement to Communication facility of Left Embankment of Right main canal from RD. 7.200Km to 15.100Km (working RD. 7.200KM to 12.400KM) of Kanjhari Irrigation Project
Construction of road from Daya river embankment to MIP via Ganesh CIDI road under CMRL in the Dist. of Khordha for the year 2022-23
Protection to scoured bank on Birupa right embankment (C.E No-34B) near village Ganipur from RD 8865m to RD 9000m for the year 2021-22
Protection to kusumi left bank Embankment Near Kalika Prasad, Nayagarh from RD 310 m to 650 m of Nayagarh District for the year 2025-26
Providing stone masonry Toe wall at embankment bottom at garland drain for protection of pond near Majhika and mine edge under Balram OCP, Hingula Area.
Providing slope protection with apron wall along the garland drain at embankment near steel dome bridge of Balram OCP under Hingula Area (Monsoon 2021-22).
Providing and placing sand bags for protection of road embankment inside mine during monsoon-2023 as and when required basis, under BOCM of Lakhanpur Area
Construction of Bathing Ghat on Sana Genguti and Bada Genguti left embankment near village Rambhadeipur, Ahamadpur, Radhadeipur, Balikana and Thakurapatna for the year 2025-26
Providing and placing sand bags for protection of road embankment inside mine during monsoon 2024 as and when required basis under BOCM of Lakhanpur Area
Fabrication, supply, transportation and erection of Batarpada sluie at RD 1.180Km on Batarpada saline Gherry of Baitarani Benga right Embankment for the year 2024 -25
4)Improvement to service road of Kathajodi right embankment from RD 00 km. to RD 1.100 km. for the year 2024-25. (MBD47/2024-25)
Repair to Left Embankment of Jajpur Main Canal from 1.450K.m to 2.950K.m (Such as laying of WMM, BM, SDBC etc) for the year 2024-25
Restoration to 02 Nos. Spurs at RD 20.950 Km and RD 21.150 Km on Nuna Karandia right embankment near Karilopatna for the year 2024-25
Construction of road NH-5 to Jasotikiri Baitarani Embankment via-Akhupada Sethisahi in the District of Bhadrak under MMSY TRIP for the year 25-26
Construction of flood embankment including 5nos. spurs on the left bank of river Rushikulya from Achuli to Jaleswarkhandi i.e. from RD 16.50Km to 20.94 Km.
Protection to scoured bank on Nuna Karandia right embankment from RD 9.500 Km to 9.620 Km near village Kulagaon Isalo for the year 2022-23
Construction of 4 Nos Gadas on Chitrotpala Left Embankment at RD 44.070 Km, 44.420 Km, 48.030 Km and 43.800 Km for the year 2026-27
Improvement to service road on Chitrotpala left embankment from RD 43.600 km to 44.180 km from village Raghabpur to Podana for the year 2026-27
Protection to scour bank of Chotipada-Badaraula saline embankment at RD 1.580 Km., 2.100Km. C/S and from RD 3.510Km. to 3.660Km. R/S.
Improvement to Bhargovi right embankment from RD 36.00 km to 39.500 km from village Pahadachula to Dugal and RD 42.00 km to 44.00 km
FDR to Daya left embankment at RD 4.20 km ( at RD 4.700 km, 5.200 km, 9.200 km, 9.700 km, 11.00 km, and 12.900 km )
Protection to Scoured bank of river Gobari Right from RD 17200 M to 17270 M on Mahakalapada Chhapali Saline Embankment near Chhapali School Gherry
Construction of Protection Wall to K.V. Right Embankment (Country Side) from RD 38.120Km. to RD 38.520Km. Including one no village Gada. at RD 38.395Km.
Improvement to Right bank main canal Embankment Road of Ghungijore M.I.P from Rd 0 M to RD 2336.20M in Birmaharajapur Block of Subarnapur District under CAPEX Grant (2024-25).
C Repair of H/R at RD.0.00Km and fall at RD.0.070Km and RD.0.420Km and cement concrete channeling from RD.0.00Km to RD.0.510Km of Telarai F.C. off taking at RD.0.745 Km of Telarai S/M-III, De-silting and strengthening of Canal embankments of Telarai
Improvement to left side embankment of MLC in between RD 13800 mtr. to 13900 m. of MLC for the year 2025-26. (MBD16/2025-26)
Protection to scoured bank on CE No. 78(A) on Mahanadi right embankment from RD13.250Km to 13.450Km. near village Barada. (Working from RD13.200Km to 13.360Km.)
Making of temporary rockfill wall along the C.T. road and along embankment of railway line for safety purpose at different location of Lingaraj OCP, Lingaraj Area.
Supplying and placing of Sand bags and Pitching of Stone boulder along the turning point of Bangaru Nallah embankment (extension mine site) at AOCP,under JA.
Laying Temporary WBM Road along embankment side of diverted Bangaru Nallah at North West side of Extension Mines for movement of Villagers under Ananta Opencast Project.