Loading…
Loading…
28,933 results • Best match
Project for Flood Protection Work of Kunhra-Ghoghi Bund between Km. 20.300 to 20.700 Near Village Masijidiya on left Bank of River Kunhra in Distt. Siddharthnagar.
Flood protection work for safty from erosion at village Barona downstream of Stud No.19 at the Right Bank of Ganga River Tahshil Patiyali District Kasganj
Construction of Flood Protection Work on Solani River in Village Gee Mohmmad Saidpur of Gram Panchayat Sisona Block-Bhagwanpur, Distt-Haridwar. (Ch.-0.00 to 246.00 Meter)
Restoration Repair Reconstruction of flood protection work at various spots of block Ghagwal Rajpura in local nallahs as per necessity of site requirement under M R
Flood protection work Residential and agriculture land village Jakhol Badgaad khadd (Jinanu khadd, Piyagaad khadd) Mori block of district Uttarkashi (Reach Km 0.00 to Km 0.110)
Extension Of Flood Protection work in L/B P.G. College Augustymuni From Mandakini River in Block-Augustymuni, Distt.- Kedarnath (Job 1 Reach 0.00 to 68.00 m)
Flood Protection work along right bank of Mandakini river D/S of confluence at Rudraprayag district Rudraprayg under SDMF Reach( 0-200m) Working Reach (0-30m)
FLOOD PROTECTION WORK BETWEEN KM. 0.490 TO KM. 1.090 OF HETIMPUR PARASKHAND BUND NEAR VILL. MATHIYA ON R/B OF LITTLE GANDAK RIVER IN DIST. DEORIA
Flood protection work along right bank of Suswa river from Lalmati khala to Badkali bridge in block Doiwala district Dehradun (Reach 232.00 m to 348.00 m)
Lot no- 4 FLOOD PROTECTION WORKS BETWEEN KM. 18.920 TO KM. 19.670 OF CHAHLARIGHAT GANAESHPUR BUND ON RIGHT BANK OF RIVER SARYU/GHAGHRA IN DISTRICT SITAPUR
Restoration Repair Re construction of flood protection work at various spots of block Ghagwal Rajpura in local nallahs as per necessity of site requirement under MandR
Restoration of rain damages to various flood protection work under JSV Sub Division Dharampur Tehsil Dharampur Distt. Mandi HP RD 120 to 240 Job No.2
Repair to various flood protection works and other allied works at various spots in L/S and R/S of River Ujh U/S National Highway.
Construction of Inlets, Flood Protection wall and Strengthening of Flood Bank in Gadilam River at Elanthampattu, Semmedu and Siruvathur villages in Panruti Taluk of Cuddalore District
Stage context for repair improvement and maintenance of various flood protection works on LR side of river Ujh DS NH way for the year 2022-2023.
Construction of Flood Protection work near the land of Sunil Singh and others at ward no. 1 Panchayat Sumwal Block Majalta in Gambir Nallah(UT Capex)
Flood protection works at critical spots of Dachigam Nallah including improvement works of shelter shed office from RD 1500 to 2300M excluding cost of available crates
Flood Protection Work In R/b Of Asan River Village Parval, Thakurpur in Sahaspur Block of Distt. Dehradun. Job-1 Reach 0.00 M to 125.00 M
FLOOD PROTECTION WALL AND NALLA WIDENING AND DEEPENING WORK AT ADGAON BUJRUK AT PATHARDI TALUKA TELHARA AT VARUR JAULKA TALUKA AKOT DISTRICT AKOLA UNDER STATE FUND
Filling of jhau jhakar and Bamboo Bracing etc. in existing flood Protection work near Village Jaswant Nagla on right bank of river Ganga in Distt. Budaun.
Flood protection works at right bank of Swarna river from canal head to Joshi farm in block Sahaspur district Dehradun Under C.M Announcement Number 599/2021.
Flood Protection of Malana along both bank of Kothigad block Mori Distt Uttarkashi under State Disaster Mitigation Fund (Reach 0.380 KM to 0.565 KM) JOB-3
Const. of Protection Wall, Earth Filling and Other misc. Civil Works for flood protection at 33 KV S/S Deoligaon under AEN (O and M) Deoli.
Project for strengthing of Flood Protection scheme of village khotila along right bank of kali river in Dharchula block of district Pithoragarh reach 0 to 750m
Flood protection works at critical spots on LS of river Ujh near village Bhamberwan Bhag Creek Part-III Part-A under FCSD Ujh under UT capex
Restoration/construction of Flood Protection work on Right Side of River Nikki Tawi upstream Omman Post near IB at Boarder village Makwal (at spots) Part-B
To conduct third party audit for flood protection works under SDMF proposed before monsoon season 2026 under SBS Nagar Drainage cum Mining Geology Division WRD Punjab
Flood protection work on the left bank of the Pindar River from Saraswati Shishu Mandir to Badrinath Motor Bridge in the Karnaprayag block of Chamoli district.
Supply erection and commissioning of new pumps allied with all accessories for flood protection works at Kasandi Pump House in Water Services Mechanical Sub Division, Gohana
Construction of Damaged Flood Protection Work by way of Studs on Right Bank of River Waddi Tawi from Ring Road to Indo-Pak Border (At Places).
Construction of flood protection work by way of crated revetment on Mohalla Nallah Bhathindi, Bermini Nallah, Chatta Nallah and Tributaries (At Spots) Block Satwari, District Jammu.
Const. of flood protection work near CSC at Shiv Mandir Panchayat saloon Pyt Saloon Block Pouni Distt Reasi under capex DDC for the year 2026-27
Flood Protection works on left Bank of Vadlavanicodu minor drain from km 0.120 to 0.18 in Agartipalem Village limits of Palakollu Constituency in West Godavari Dist.
Providing Flood Store Materials at Srirangapatanam village for attending Flood Protection to the Burada Kalava during the Flood Season in Korukonda Mandal in East Godavari District
Flood Protection works on Krishna lamka Flood Bank below Barrage from Km 0.000 to 6.400 and KLF Bank below barrage in between Km 0.00 to 89.000
Flood protection works for bund, head sluices including supply channel for surplus weir of Kodicalva Tank in Dandipudi (V) of Buttaigudem (M), Eluru District.(2ND CALL)
Flood protection works to Right Main Canal and Left Main Canal of Gorrigedda Reservoir near Thummalapalem (V) of Avuruwada G.P of Madugula (M) in Anakapalli District
Construction of flood Protection wall near Bathing Ghat near Ransoo PoraKotla Pyt Pora kotla Block Pouni Distt. Reasi under capex PRI for the year 2026-27
Const. of Construction of Flood Protection work at Peer Baba W.No 06 Pyt Dadowa Block Pouni Distt. Reasi under capex PRI for the year 2026-27
Construction of flood protection work on left side of Trichal by way of crate work and stone pitching at village Koil Duhwuth Bonagam from RD 7500m
Saline embankment protection
Improvement to embankment
Embankment protection work
Embankment protection work
Embankment improvement work
Embankment Protection work
Embankment improvement work
Saline embankment protection
Maintenance and Repair of rain cuts and earth slips in between 29.6 Km to 29.75 Km of Ajoy right embankment including repairing bank cuts near village- Kalyanpur, mouza- Kalyanpur in Block - Mongalkote.
Maintenance and Repair of rain cuts and earth slips in between 14.3 Km to 14.80 Km of Ajoy right embankment including repairing bank cuts near village- Nabagram, mouza- Paligram in Block - Mongalkote.