Loading…
Loading…
7,538 results • Best match
MTPS I OANDAHS unit III IV Ash handling pump house stage II Dismantling of worn out suction pipe lines bends and grills in Ash slurry sump III and IV Fabrication and erection of 300NB M S suction pipes and bends in the suction lines
Cleaning the Roof Tops of various buildings in Mill, Ash Handling, ESP, DM Plant 1 and 2, Hydrogen Plant, Auxiliary Cooling Water Pump House, Clarified Water Pump House in Unit 1 to 3 and clearing away the removed deposits to far off places fo
Work contract for Comprehensive Annual Maintenance Contract for Hi-Rel make 2 X 65 KVA UPS System including its Auxiliary Panel for main plant and Hi-Rel make 2 X 7.5 KVA UPS System for Ash Handling Plant of 210 MW, ATPS, MPPGCL, Chachai
TGGENCO BTPS STAGE II CAM Division Preventive Periodical Maintenance and emergency rectification works of Units-3 and 4 Collector tanks and Vacuum pumps in Ash Handling System of Stage II BTPS for the year 2025-26 or date of commencement of work to 31.03.2026.
Remnant Life Assessment of Boilers and its auxiliaries as per Indian BoilerRegulation 1950, RLA & Condition Assessment(CA) of Turbine & critical piping, Power Transformers and Ash Handling System in Units 9&10 (2x250MW) ofKothagudem Thermal Power Station(KTPS-V),Paloncha, Bhadradri Kothagudem (Dist.)- 507 115
NCTPS I SE MI circle AHP Dn Renewal of existing wornout damaged Cast Basalt Lined Ash Slurry Disposal Pipe Line No 2 laid from Ash Handling Pump House to Ash Discharge Points at Ash dyke after dismantling the existing line and Erection of 5511 meters
cleaning the Roof Tops of various buildings in Mill, Ash Handling, ESP, DM Plant 1 and 2, Hydrogen Plant, Auxiliary Cooling Water Pump House, Clarified Water Pump House in Unit 1 to 3 and clearing away the removed deposits to far off places for
NCTPS I Operation Circle O and E Dn Fire Fighting Replacement of worn out underground hydrant mains to above ground from ware house compound to Newly erected diesel bunk and Ash Handling Pump Gate to Fuel oil pump house area in Fire Protection S
KTPS-VII Stage - Civil - O and M-I - SD-II - Clearing of shrub jungle two times in a year in Coal Handling Plant, Ash Handling Plant and along 30A Conveyor as and when required in KTPS Stage-VII, Paloncha for the FY 2025-26
TTPS Cleaning the roof tops of various buildings in mill, ash handling, ESP, DM plant 1 and 2, hydrogen plant, auxiliary cooling water pump house, clarified water pump house in unit 1 to 3 and clearing away the removed deposits to far off place
Custom Bid for Services - Annual Rate Contract for maintenance of CI system field portion of main plant along with its auxiliaries outside power house facilities including Ash Handling Plant Firefighting its annunciation system excluding Chlorinatio.. Similar Category Operation and Maintenance Power House/Power Plant
Cleaning and Clearing the spilled Red hot bottom ash from DRYCON screw conveyor surrounding bottom ash hoppers area and Crusher house area transporting the ash to upper ash dyke by using the contractors vehicles of JCB and Tractors and unloading
Cleaning Clearing the spilled Red hot bottom ash from DRYCON screw conveyor surrounding bottom ash hoppers area and Crusher house area transporting the ash to upper ash dyke by using the contractors vehicles of JCB Tractors and unloading the same r
Monitoring Attending Patch welding works in fly bottom ash conveying lines to be attended round the clock
As per SOW
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2), Transportation and stacking of PPC 33 Fly Ash content from consignee loc to Dett Lachun 115 RCC North Sikkim, Transportation and stacking of PPC 33 Fly Ash ... PPC Fly Ash content ... 33 Fly Ash content ... 33 Fly Ash content ... 33 Fly Ash content ... 33 Fly Ash content ... 33 Fly Ash content ... 33 Fly Ash content ... 33 Fly Ash content ... 33 Fly Ash content ... 33 Fly Ash content ...
Custom Bid for Services - Supply of Pond ash to NHAIs Rehabilitation and Up gradation from 4 to 8 lane of ChandikholeParadip section of NH53 Old NH5A from Km 0000 to KM 18000 Package1 in state of Odisha Similar Category Goods Transport Service – Per MT per KM Based Service
Extension and heightening of the six ash disposal lines of BTPS from Belwadah to Morchanala
Clearing of accumulated ash at ESP hoppers area Intermediate silo area Remote Silo area along the ash conveying pipe lines,Bottom ash hoppers area,Coarse ash hoppers area and transporting the same to the ash pond by trucks tractors for a period from ... in Ash Handling Plant ...
Spares and Complete Assembly of Vertical Drain Pump for Ash Handling System
BM AOH Overhauling of Coarse Ash Handling Equipments and other related works
ROUND THE CLOCK OPERATION AND MAINTENANCE CONTRACT OF ASH HANDLING PLANT CTPS.
Filling of pond ash in low lying areas near ash dykes at PTPP, Parichha
Filling of pond ash in low-lying areas behind CISF Barracks at PTPP, Parichha.
Filling of pond ash in water logged area behind CISF Colony at PTPP, Parichha
Procurement of special purpose Alloy Steel electrodes for ash handlingsystem
ULTRASONIC THICKNESS GAUGE (D-METER) WITH ACCESSORIES FOR ASH HANDLINGfor NTPC KAHALGAON
PROCUREMENT OF FLOWMORE MAKE PUMP CAPITAL SPARES FOR ASH HANDLINGMAINTENANCE AT NTPC DALIPALI
Ex BHEL Supervisory Services for Boiler Rotary Machines Ash HandlingMaintenance and Pressure Parts Deployment of Ex WRI Welding expert forthe year 2020 21 and 2021 22 during Boiler Overhauls
Procurement of Complete assemblies of clinker Grinder for Ash HandlingSystem Stage-III NTPC VINDHYACHAL.
Deemed OT- 18MEG-01
Procurement of Flowmore make Pump Capital spares for Ash HandlingMaintenance at NTPC Darlipali
SCHEDULE_1_100257335_ITEM_10_M1779091080, SCHEDULE_2_100257335_ITEM_20_M5600000072, SCHEDULE_3_100257335_ITEM_30_M5600000121, SCHEDULE_4_100257335_ITEM_40_M5654016013, SCHEDULE_5_100257335_ITEM_50_M1708990916, SCHEDULE_6_100257335_ITEM_60_M5600000068
360132101000, 360132230000, 360132270000, 360106050000, 360106040000
M3582993254, M3582993400, M3582993401, M3582993404, M3582993403, M3582993406
Cement, Sand, Aggregate 40mm, W2 Panel, Clay bricks, Fly ash brick, AAC blocks, PCC block in CM 1 4
Transportation of Dry Fly Ash through bulkers from North Chennai Thermal Power Station (NCTPS) to Ariyalur Cement Works, Ariyalur
Transportation of Dry Fly Ash through bulk tankers from North Chennai Thermal Power Station to Ariyalur Cement Works, Ariyalur
Transportation of Dry Fly Ash through closed trucks from Tuticorin thermal power station, Tuticorin to Alangulam Cement Works, Alangulam
Transportation of dry fly ash through bulkers from Mettur Thermal Power Station, Mettur to Ariyalur Cement Works, Ariyalur District
Transportation of Dry Fly Ash through Bulk Tankers from Mettur Thermal Power Station Mettur to Ariyalur Cement Works, Ariyalur
STONE AGGREGATES SIZE 20 MM, STONE AGGREGATES SIZE 40 MM, M SAND, RIVER SAND FOR CONSTRUCTION, FLY ASH BRICK
Excavation. Rcc work, Brick work, Fly Ash work, Cement plaster, Snowcem Etc. at village Hathwala Block Samalkha Distt Panipat
Removal of ash accumulated around Bottom Ash Hoppers, APH and Duct Hoppers, Economizer hoppers, ash slurry disposal pump house area including surrounding drains, trenches, drain sump in UNIT 1&2 by loading manually into tractor and transporting to a distance of 10 KM for disposal into ash pond as and when required during the year 2023-24
Removal of ash accumulated due to clearing of foreign material, open ashing from APH and Duct Hoppers, Bottom Ash Hoppers Unit-1 and 2, including surrounding drains, trenches, drain sump and transporting to a distance of upto 5 KM for disposal at a location Ash Pond directed by Engineer -in-charge for the year 2025-26
Lifting and Transportation of ash, ash slurry etc., collected from the premises at bottom ash hopper area, coarse ash tank area and its transporting pipe line area etc.. of Unit-1 wet ash system area and disposal of the same at suitable place as per the instructions of Engineer in charge during the financial year 2022-2023
PROCUREMENT OF 335 KW, 3.3KV, 4 POLE MOTOR FOR STAGE-II ASH DISPOSALPUMPS.
HIRING OF PC 200, HYWA, JCB and TRACTOR WITH TROLLEY FOR ASH DISPOSALFROM NEAR THE V1_V2 OFL ON THE BANK OF RIHAND RESERVOIR FOR VSTPS.
Fixing of scaffolding and replacement of damaged castable refractory in bottom ash hopper unit 7, 2x500MW, DTPS, Anpara
KTPS-VII Stage-Civil-O&M-III-Ash Pond-Section-I-Removal of Jammu/Jungle/silt/ash etc., in toe drains and catch water drains of Northern Ash Pond-I, II and drains along the side of ash disposal pipe lines in two spells as and when required during the year 2023-24.