Procurement of spares for fly ash evacuation system and Nuva stream for Ash Handling Plant of unit no. 1, SGTPS MPPGCL Birsinghpur.
PROCUREMENT OF 150 NB DOME VALVE ASSEMBLY BELOW ESP HOPPER AND APH HOPPER IN FLY ASH CONVEYING LINE OF ASH HANDLING SYSTEM
spare for HP Water pump (Vertical Turbine Pump) and HORZ. Multi stage pump (Seal water pump) in Wet Fly Ash handling System
Supply of Welding machines of ESAB/ TORNADO/ Ador Fontech/D&H make for Dry fly ash handling system in KTPS-VI Stage
Supply of Ash Conveying Pipes (Pipe In Pipe) for Dense Phase Dry Fly Ash Handling System of Unit 5and 6, CSCTPP, Chhabra
PROCUREMENT OF 37KW 50HP COMPRESSOR, 7BAR WORKING PRESSURE, 240CFM SCREW ELEMENT FOR DRY FLY ASH HANDLING SYSTEM OF UNIT 3 AND 4.
C01515 Annual Contract for Manpower Deployment and Hiring of JCB and Tractor for running the Ash Utilization activities including Housekeeping at Fly Ash Silo , NTPC Mouda, Nagpur, Maharashtra
SUPPLY OF VARIOUS SIZE CAST BASALT BEND/TEE/Y-PIECES AndACI BENDS FOR BOTTOM and FLY ASH HANDLING SYSTEMS OF 2X600 MW AT KATPP, JHALAWAR
SUPPLY OF SPARES FOR M/S WEIR MINERALS MAKE PUMPS INSTALLED IN BOTTOM ASH HANDLING SYSTEM OF 2X600 MW, KATPP, RVUN, JHALAWAR.
Custom Bid for Services - SERVICE CONTRACT FOR MAINT OF ST II BOTTOM ASH HANDLING SYS AND ASH SLURRY SYS OF NTPC KAHALGAON
Supply of Castable Refractory for bottom Ash Hopper for O and M of Ash Handling Plant, CTPS, DTPS and ETPS, HTPS, Kasimpur
Procurement of 25 NB & 80 NB Stainless steel pipes for bottom ash hopper in Ash handling plant at STPP, Jaipur, Mancherial, Telangana
CAM- Removal and clearing of accumulated ash lumps/clinkers inside Bottom ash hoppers, economizer hoppers, clinker grinders as and when required in Bottom Ash Handling system of KTPP Stage-I during the FY 2025- 26
Dismantling & Erection of Bottom Ash Over Flow Transfer Pump Discharge 250NB Pipe Line to Slurry Sump & Erection of Bottom Ash C 200NB Slurry Pipe Line to Slurry Sump at Unit-3 Ash Handling System BTPS
Procurement of Various sizes of M S Plates and Iron and Steel for Unit I II and III Bottom Ash Hopper Ash disposal system
In situ condition repairing of the critical spares of Furnace Bottom Ash Disposal system in unit no 4 and 5 2x500 MW BTPS Anpara
Disposal of ash clinker from furnace bottom ash disposal system and Repairing of flight bar of unit no 4 and 5 2X500MW BTPS Anpara
Insurance cover for the equipment/ assets in 1X120MW UNIT OF KOTHAGUDEM TPS - B AND DRY FLY ASH HANDLING SYSTEM (DFAHS) PACKAGES - A&B
Supply of spares for jet pump and feeder ejector assembly for wet mode disposal of ESP major hoppers in fly ash handling system
TGGENCO BTPS STAGE-II CAM Division AHP Repair and reconditioning of U-4 Vacuum pumps 1 and 3 in Fly Ash handling system
Dismantlement Erection and commissioning of damaged pipes of secondary ash conveying pipe line of Dry Fly Ash handling system installed at GGSSTP Ropar
TGGENCO BTPS Stage II CAM Division Repair and reconditioning of UNIT-4 Vacuum pump-4 & Vacuum Pump-6 in Fly Ash handling system
Insuarance coverage for the Equipment/assets in 2X120MW Units of Kothagudem TPS 'B' and Dry Fly Ash Handling System (DFASH) Package - A & B
Procurement of MS Pipe of size 200 NB 250 NB and 300 NB for dry fly ash handling system installed at GGSSTP Rupnagar
PROCUREMENT OF GATE AND GLOBE VALVES FOR DRY FLY ASH HANDLING SYSTEM ,SCRAPER CONVEYORS AND ASH PUMP HOUSE OF UNIT 3 AND 4.
E-TENDER FOR ANNUAL RATE CONTRACT FOR BIOMASS BRIQUETTE, ASH HANDLING AND ASH DISPOSAL FORM STEAM BOILER (ON JOB WORK BASIS).
Enabling Civil Structural and Piping Works for rerouting of Ash Disposal Line 4 And Dry Fly Ash Lines for 5th Stream Expansion at Alumina Refinery
FENNER/ESCON/ FLEXER/PIX/LOVEJOY make "V-Belts, couplings and spiders for various equipment in CAM division of KTPS-VI stage and Fenner/ Escon/ Flexcer various sizes of " V" BELTS and pulleys for Ash disposal pumps, vacuum pumps and bottom ash drain ... in Ash Handling plant
fly ash
fly ash
Annual running maintenance works connected with 12inch ,14inch ash disposal pipe line of Ash Handling Division-II, 2x200 MW BTPS, Obra
Procurement of M.S. Pipe of size 200 NB and 250 NB installed at dry fly ash handling system GGSSTP, Rupnagar.
Custom Bid for Services - MAJOR MAINTENANCE OF ASH HANDLING PLANT UNIT 1 TO 6 AND BOTTOM ASH SYSTEM OF UNIT 9 AND 10
Raising of Precinct (Edge) of drains of Bottom Ash Handling system/ESP system and service path of Unit-1 to 4 CTPP, Chhabra
Supply of Shaft seal housings,wear,plates and connected spares required for clinker grinders for Bottom ash handling system in KTPS-VI stage
Removal of settled ash Clinker in Unit II III Common trench from Bottom ash hopper to Ash Handling Pump House and interconnection tunnel
Custom Bid for Services - MAINTENANCE OF ASH SLURRY PIPE LINE BOTTOM ASH FLY ASH OF STAGE I AND ASH SLURRY PIPE LINE OF STAGE II PART AB
ARC for work of computation and processing of ash utilization data and generating E-invoice for sale of dry fly ash and pond ash at Ash silo and Ash dykes of DCRTPP HPGCL Yamuna Nagar
SERVICE CONTRACT FOR MAINTENANCE AND OH OF FLY ASH HANDLING SYSTEM ANDESP OF STAGE I AND II AND ASH BRICK PLANT AT NTPC SIPAT
MTPS II Design Supply Erection and Commissioning of Augmentation of Dry Fly ash Handling system DPPCS Dense phase pneumatic conveying system on turnkey basis
O and M Contract of Fly Ash Handling System of Unit 7 and 8 and Maintenance contract of ESP of unit 7 and 8
LIFTING OF FLY ASH FROM BOILER AND FLY ASH ARESTER
STREET light for road for Pond Ash transportation from Ash dyke stage 1to Chakiya thana Highway NH-31 through township premises
Custom Bid for Services - 200138057 Maintenance jobs of Stage1 ash handling plant in Bottom ash hopper area Clinker grinders Ash slurry pump house Ash disposable lines up to boundary wall Fly ash Old DAETP Brick plant newly augmented DAETP ESP field.. Similar Category Operation and Maintenance Power House/Power Plant
Ash Disposal from ESP, Buffer Hoppers and APH Hoppers,Bottom AshHoppers, Silo to Ash Dyke at NTPC Solapur
Annual contract for routine, breakdown, capital maintenance work and providing assistance in operation of Bottom ash handling system Unit 5 and 6, CSCTPP, Chhabra.
Fixing of scaffolding and Replacement of Castable refractory in bottom ash hopper of Ash Handling Plant during Overhauling of unit 6, 2X500MW, DTPS, Anpara
Procurement of complete assembly of Clinker Grinder for Bottom Ash Hopper in Ash Handling Plant at Unit No. 1 and 2, SSTPP, MPPGCL, Dongalia
Annual contract for routine, breakdown, capital maintenance work and providing assistance in operation of Bottom ash handling system Unit 5 and 6, CSCTPP, Chhabra.
Procurement of 2500X1250X 6 mm thick SS 316 stainless steel plate for bottom ash hoppers in ash handling plant at STPP, Jaipur, Mancherial, Telangana.