Loading…
Loading…
7,394 results • Best match
LIFTING OF FLY ASH FROM BOILER AND FLY ASH ARESTERFOR SEASON 2022-23
LIFTING OF FLY ASH FROM BOILER AND FLY ASH ARESTERFOR SEASON 2023-24
LIFTING OF FLY ASH FROM BOILER AND FLY ASH ARESTERFOR SEASON 2024-25
Overhauling work of Stage I 3 x 200 MW units Bottom ash Clinker grindersn its disposal pipe lines n sumps ESP DAETP FY 2022 24
D.P. Extension and Branching of the Ash Disposal Pipelines at the Ash Dyke of Ash Handling Plant
Operation and Maintenance of Dense phase Dry Fly Ash Handling System of Unit 7 and Maintenance of ESP system system for Unit No. 1 to 7
Annual contract for removal, loading, shifting and transportation of Dry/Wet fly ash from inside plant to pond ash or at any designated place at KaTPP, RVUNL, Jhalawar
Handling and Transport on Lumpsum Basis - Wasteland Development of low-lying areas at acquired Land of NTPC- Lara using fly ash from Silo/pond ash of Lara STPP
Handling and Transport on Lumpsum Basis - Transportation of pond ash/fly ash from NTPC Korba Dhanras Ash Dyke/FA Silo to Dugga/Bishrampur Mines in environment friendly manner
SUPPLY OF ALLOY CI BEND WITH FLANGED END AT BOTH SIDE INSTALLED IN FLY ASH HANDLING SYSTEM OF UNIT 1 and 2 (2X600 MW), AT KATPP, JHALAWAR
Annual Contract for routine, breakdown, capital maintenance work and providing assistance in operation of Dense Phase Dry Fly Ash Handling System of Unit5and6(2x660MW), CSCTPP, RVUNL, CHHABRA
Annual Maintenance Contract for Dry Bottom Ash Handling System of U7 300MW and U8250MW DPPS and Economizer hopper ash handling system of U7 DPPS for a Period of One year with a provision of extension for another one year
Fly Ash Bricks (Q3)
FLY ASH HIGH PRESSURE
Upgradation of Fly Ash
Various Fly ash Spares
TGGENCO-YTPS (5X800 MW)-BOP/AHP-Unit-I-Carrying out Mechanical Maintenance of Fly Ash Handling System including Preventive, Periodical, Emergency and Breakdown Maintenance and Housekeeping of the Fly Ash Handling System of AHP, Unit-1, Stage-I, YTPS for the period of three months from 01.11.2025 or from the actual date of commencement of work for the FY 2025-26
TGGENCO-YTPS (5X800 MW)-BOP/AHP-Unit-II-Carrying out Mechanical Maintenance of Fly Ash Handling System including Preventive, Periodical, Emergency and Breakdown Maintenance and Housekeeping of the Fly Ash Handling System of AHP, Unit-2, Stage-I,YTPS for the period of three months from 01.11.2025 or from the actual date of commencement of work for the FY 2025-26
FLY ASH LOW PRESSURE WATER PUMP, FLY ASH LOW PRESSURE WATER PUMP BEACON, FLY pump switch, 5 amp switch, LOW PRESURE
Contract for Supply of Bottom ash Stone dust Supply of cement and fly ashand charging into silos for Ash brick Plant at NTPC Sipat.
KTPS VI Stage CAM Strengthening of supporting columns of Bottom Ash Hopper and laying of Fire Crete refractory in Bottom Ash Hopper in Wet Ash Handling System of KTPS VI Stage during the Annual overhaul of Unit XI for the year 2025 26
AHP PDFACS Renewal of corroded and wornout ash conveying pipes from Stage-II Bottom ash hopper silo to fly ash silo entry gate at NCTPS II premises Replacement of spare parts for PDFACS System in Unit III 3rd Row
Annual Maintenance Contract for Dry Bottom Ash Handling System of U7(300MW) and U8(250MW) / DPPS and Economizer hopper ash handling system of U7 / DPPS for a Period of 2(Two) year with a provision of extension for another one year
Procurement of Indure make feed Gate Complete Assembly with power cylinder for Bottom Ash Hopper installed at Ash Handling Plant of 2x600 MW at SSTPP, MPPGCL, Dongalia.
INDURE /MELCO/AYEMS/ENRGO make Assembly 610x915mm inclined feed gate assembly and drive shaft assemblies of Bottom Ash System of unit-9&10 in Ash handling plant
Preventive/Periodical Maintenance and Emergency rectification works of Bottom Ash Hoppers in Units-1&2 Ash Handling System as and when required during the year 2023-24
Supply of Castable Refractory for BM division and Castable Refractory for Unit-2 Bottom ash hoppers in Ash handling Plant in CAM Division of Stage-I , BTPS
Custom Bid for Services - MAJOR MAINTENANCE OF ASH HANDLING PLANT UNIT 1 TO 6 AND BOTTOM ASH SYSTEM OF UNIT 9 AND 10 Similar Category Support Services
COLLARD Portland-Pozzolana Cement (fly ash based)for bulk, COLLARD Portland-Pozzolana Cement (fly ash based)for bulk buying 33 %Content Of Fly Ash
Operation and Maintenance of Dense phase Dry Fly Ash Handling System of Unit 7 and Maintenance of ESP system for Unit No. 1 to 7 KSTPS, KOTA
Operation and Maintenance of Dense phase Dry Fly Ash Handling System of Unit 7 and maintenance of ESP system for Unit 1 to 7 at KSTPS, Kota.
Supply of Pneumatic Cylinder Assembly and its seal kit sets for Dry Fly Ash Handling System and RCC Silo system of Unit 1 to 4, CTPP,RVUN, Chhabra
Supply of Various Sizes MS ERW Double Casing Main Conveying Flanged Pipe with Specially Fabricated Bypass Elliptical Inner Pipe (PIP) for Dense Phase Dry Fly Ash Handling System
Preventive and Periodical Maintenance works of Dry fly ash lines and ESP hoppers in Units-1 and 2 of Ash Handling System for during the year 2025-26
Custom Bid for Services - Biennial Mega Contract for Opn MechMaintenance of Dry Fly Ash Handling system of NTPC Sipat StageI 3x660MW Unit123 for a period of 15 months
PROCUREMENT OF 200NB 45DEG CI BEND, 200NB 90DEG CI BEND, 250NB 90DEG CI BEND, 200NB ACI Y PIECE AND 250NB ACI Y PIECE FOR FLY ASH HANDLING SYSTEM
FLY ASH DISCHARGE VALVE 80 NB, FLY ASH DISCHARGE VALVE 50 NB
FLY ASH DISCHARGE VALVE 80 NB, FLY ASH DISCHARGE VALVE 50 NB
CRITICAL SPARES TO ASH DISPOSAL PUMPS)PUMP TYPE 10/8F-AH ASH SLURRY PUMP) FOR ASH HANDLING PLANT-KTPS-V STAGE DURING THE YEAR 2018-19
Ash lifting work
Ash lifting work
Procurement of Feed Gate Power Cylinder for Bottom Ash Hopper ALVdischarge valves of Ash Handling Plant at NTPC Solapur STPP
Work contract for Various analysis work of Fly ash, Bottom ash and Ambient air samples mentioned in Consent to Operate and MoEF and CC notification and requirement at SSTPP, MPPGCL, Dongalia, Khandwa.
Work contract for Various analysis work of Fly ash, Bottom ash and Ambient air samples mentioned in Consent to Operate and MoEF and CC notification and requirement at SSTPP, MPPGCL, Dongalia, Khandwa.
Work of operation and maintenance of Dense Phase Dry Fly Ash Handling system of Unit 7 and maintenance of ESP system of Unit 1 to 7, KSTPS, Kota
Work of operation and maintenance of Dense Phase Dry Fly Ash Handling system of Unit 7 and maintenance of ESP system of Unit 1 to 7, KSTPS, Kota
Providing home delivery of fly ash to 06 nos fly ash brick industries based in Angul, Odisha
Contract for Transportation of Cement and Fly Ash and Charging intoSilos and Supply of Bottom Ash or Stone Dust to New FABMP at NTPC SIPAT
Ultratech cement Portland-Pozzolana Cement (fly ash based)for, Ultratech cement Portland-Pozzolana Cement (fly ash based)for bulk buying 33 %Content Of Fly Ash