Loading…
Loading…
960 results • Best match
Maintenance contract for Bottom Ash Handling Systems at NTECL
Maintenance contract for bottom ash handling systems at NTECL
Annual Maintenance Contract for Bottom Ash Handling Systems of NTECL
ANNUAL MAINTENANCE CONTRACT OF BOTTOM ASH HANDLING SYSTEM AT NTECL
Gear Box for Bottom Ash Handling Equipments 3 Items
Procurement of Screw Conveyor assembly for ESP Fly ash handling System 4Nos
Screw conveyor Assembly for ESP Fly ash handling system 2 Nos.
Procurement of Screw conveyor Assembly for ESP Fly ash handling system 2 Nos.
Supply of Spares for Stage I and II Bottom Ash Hopper Ash disposal system
Supply of V Belts for Compressor House and Silo and Bottom Ash handling System in Ash Handling System 5 Items
Low Profile Band Element for Drycon Conveyor in Bottom Ash Handling System 20 Nos
Procurement of Spares for Screw Conveyor Assembly for ESP Fly Ash Handling System 02 items
OPERATION AND MAINTENANCE OF BED ASH AND FLY ASH HANDLING SYSTEM AT TNPL UNIT- II, TRICHY.
Procurement of Supporting Roller Assembly for Drycon Conveyor in Bottom Ash Handling System 150 Nos
Supply, Erection and commissioning of LP (Low pressure) water pump for Bottom Ash Handling system
Low profile Band Element for Drycon Conveyor in Bottom Ash handling system 20 Nos.
Procurement of 200 NB Knife Gate Valve with Chain wheel operated for Fly Ash Handling system
OPERATION AND MAINTENANCE OF BED ASH AND FLY ASH HANDLING SYSTEM AT TNPL UNIT - II, TRICHY.
Procurement of Bag Filters With Cage Assembly and Venturi for Fly Ash Handling System 208 Nos
PROCUREMENT OF SPARES FOR ECONOMISER WATER PUMP (MODEL 4MD 100/250D) FOR BOTTOM ASH HANDLING SYSTEM
Procurement of 50 NB Ball Valve for ESP Hopper High Level Pipe in Fly Ash Handling System 72 Nos.
Gear box for Bucket Elevator and Gear box for Second Stage Crusher in Bottom Ash Handling System 2 Items
Design Supply Erection and Commissioning of Augmentation of Dry Fly ash Handling system PDFACS Dense phase pneumatic conveying system 1 set
Supply of Various sizes of Valves for Unit 1 2 and 3 Bottom Ash Hopper Economizer and Air Preheater Hoppers Ash Disposal System
PROCUREMENT OF 150 NB DOME VALVE ASSEMBLY BELOW ESP HOPPER AND APH HOPPER IN FLY ASH CONVEYING LINE OF ASH HANDLING SYSTEM
Procurement of Various sizes of M S Plates and Iron and Steel for Unit I II and III Bottom Ash Hopper Ash disposal system
Removal of settled ash Clinker in Unit II III Common trench from Bottom ash hopper to Ash Handling Pump House and interconnection tunnel
MTPS II Design Supply Erection and Commissioning of Augmentation of Dry Fly ash Handling system DPPCS Dense phase pneumatic conveying system on turnkey basis
Procurement of 75 TPH Jet Pump Assembly Below Bottom Ash Silo Mixing pot and 90 TPH Pump Assembly Below Fly Ash Silo Mixing pot for Ash Slurry Jetting pipe line
AHP PDFACS Renewal of corroded and wornout ash conveying pipes from Stage-II Bottom ash hopper silo to fly ash silo entry gate at NCTPS II premises Replacement of spare parts for PDFACS System in Unit III 3rd Row
PROCUREMENT OF 200NB 45DEG CI BEND, 200NB 90DEG CI BEND, 250NB 90DEG CI BEND, 200NB ACI Y PIECE AND 250NB ACI Y PIECE FOR FLY ASH HANDLING SYSTEM
BOTTOM ASH LOAD CELL
REMOVAL OF FLY ASH WORK
Tender for Supply, Strengthening and renewal of damaged and corroded supports in Tube settler-1 of bottom ash handling system to avoid wastage of raw water for Unit-I.
Return flat idlers for Bottom Ash conveyors, Carring Idlers for Bottom Ash Conveyors
Custom Bid for Services - Supply of structural steel items and replacement of existing corroded steel structural members in Bottom Ash Conveyor System in Ash Handling System of Unit II in NTPL
FIELD JB FOR BOTTOM ASH LOADCELL
Plastering inside of bottom ash hoppers
Fabrication of 250NB 300NB 350NB 400NB MS ERW bends with SS liners inside or outside MS Box cover various degrees and Y pieces for Bottom Ash B stream conveying Pipe lines in Ash Handling system
PROCUREMENT OF 150 NB TOP ADAPTOR - TYPE I, II and III, 200 NB BOTTOM ADAPTOR TYPE I and II AND 250 NB BOTTOM ADAPTOR OF DOME VALVE ASSEMBLY FOR FLY ASH HANDLING SYSTEM
L172240750901001 9740701 BOTTOM ASH LOAD CELL PACK 1, L173219740701001 9740701 BOTTOM ASH LOAD CELL PACK 2, L183419740701001 9740701 BOTTOM ASH LOAD CELL PACK 3, L184019740701001 9740701 BOTTOM ASH LOAD CELL PACK 4, L170050740901001 BOTTOM ASH LOAD ... L180650740901001 BOTTOM ASH LOAD ... L171150740901001 BOTTOM ASH LOAD ...
Transportation of Dry Fly Ash from NCTPS to Ariyalur Cement Works
Supply and Transportation of Dark Wet Fly Ash (Colouring Purpose) for Ariyalur Cement Works
Transportation of Dry Fly Ash from TTPS to Alangulam Cement Works Alangulam
TTPS Mech II AHP Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit I Bottom ash hopper ash disposal system during forthcoming overhaul
Supply and Erection of Fly Ash Brick Unit
MTPS1 Operation circle Chemical Division Engaging of external agency on works contract basis for collection of received coal bunkered coal and fly ash bottom ash sample on round the clock basis for analysis for a period of 365 days
Removing hard clinkers from Bottom Ash Hoppers and Collecting, Transporting of ASH from Bypass chute in Bottom Ash Conveying System
TTPS MechII AHP Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit I Bottom ash hopper ash disposal system during annual overhaul 2024 2025
NCTPS 1 Operation Circle Chemical Division Annual Maintenance work Collection preparation testing and reporting of Bunker fed coal Pulverized coal from mills and bottom Ash and Fly ash samples MOT oil Furnace Oil HSD Oil from of all the units Carryin