Loading…
Loading…
960 results • Best match
NCTPS I Operation Circle Chemical Division AMC work Collection preparation testing and reporting of Bunker fed coal Pulverized coal from mills and bottom Ash and Fly ash samples from of all the Units Domestic coal Carrying out the works on c
Cleaning and Clearing of red hot bottom ash
PROCUREMENT OF FLY ASH COMPRESSOR SPARES FOR BOILER 5
TTPS Mech II AHP Unit III Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit III Bottom ash hopper ash disposal system during forthcoming overhaul
TTPS Mech II AHP Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit III Bottom ash hopper ash disposal system during forthcoming overhaul 2022 2023
TTPS Mech II AHP Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit III Bottom ash hopper ash disposal system during annual overhaul 2025 26
TTPS Mech II AHP Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit II Bottom ash hopper ash disposal system during the forthcoming annual overhaul
TTPS Mech II AHP Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit I Bottom ash hopper ash disposal system during forthcoming overhaul 2019 20
TTPS Mech II AHP Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit II Bottom ash hopper ash disposal system during annual Overhaul 2024 2025
TTPS MII AHP UnitII Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit II Bottom ash hopper ash disposal system during the forthcoming annual overhaul
TTPS Mech II AHP Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines, Feed sump Hydraulic ejector assembly etc in unit III Bottom ash hopper ash disposal system during annual Overhaul 2024 2025
TTPS MII AHP Unit I Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit I Bottom ash hopper ash disposal system during the forthcoming overhaul
MTPS I OAHS FAM PDFACS Outsourcing the Operation and Maintenance of pressurized dense fly ash collection system PDFACS for disposal of dry fly ash
MTPS I OAHS FAM PDFACS UNIT I Operation and Maintenance of pressurized dense fly ash collection system PDFACS for disposal of dry fly ash
TTPS M II AHP Unit III Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit III Bottom ash hopper ash disposal system during the forthcoming overhaul
Custom Bid for Services - Supply of structural steel items and replacement of existing corroded steel structural members in Bottom Ash Conveyor System in Ash Handling System of Unit-1 in NTPL Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
MTPS I OAHS FAM PDFACS UNIT I Outsourcing the Operation and Maintenance of pressurized dense fly ash collection system for disposal of dry fly ash
MTPS I OAHS FAM PDFACS UNIT II Outsourcing the Operation and Maintenance of pressurized dense fly ash collection system for disposal of dry fly ash
TTPS Mech II AHP Unit II Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit II Bottom ash hopper ash disposal system during forthcoming overhaul 2019 20
TTPS Mech II AHP Unit I Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit I Bottom ash hopper ash disposal system during forthcoming overhaul 2020-2021
TTPS Mech II AHP Unit II Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit II Bottom ash hopper ash disposal system during forthcoming overhaul 2021 202
TTPS Mech II AHP Unit II Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit II Bottom ash hopper ash disposal system during forthcoming overhaul 2020 2021
TTPS Mech II AHP Unit I Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit I Bottom ash hopper ash disposal system during forthcoming overhaul 2021 2022
Transportation of Dry Fly Ash through Bulk Tankers from NLC to New 1 MTPA Plant, Ariyalur Cement Works, Ariyalur
MTPS OAHS FAM PDFACS Operation and Maintenance of pressurized dense fly ash collection system PDFACS for disposal of dry fly ash on tonnage basis Unit II
MTPS OAHS FAM PDFACS Operation and Maintenance of pressurized dense fly ash collection system PDFACS for disposal of dry fly ash on tonnage basis Unit I
MTPS I OAHS FAM PDFACS UNIT II and III Operation and Maintenance of pressurized dense fly ash collection system PDFACS for disposal of dry fly ash
Transportation of Wet Fly Ash from Mettur Thermal Power Station (MTPS) to Ariyalur Cement Works, Ariyalur
MTPS I OAHS FAM PDFACS Outsourcing the Operation and Maintenance of pressurized dense fly ash collection system PDFACS for disposal of dry fly ash on tonnage basis
MTPS I OAHS Operation and Maintenance of pressurized dense fly ash collection system PDFACS for disposal of dry fly ash on tonnage basis including supply of spares
AHP Dn. -PDFACS- Renewal of corroded and Damaged Fly ash conveying pipes from stage-II fly ash silo entry gate to stage-I 1000 MT silo top
PROCUREMENT OF FLY ASH SCREW COMPRESSORS USE FOR BOILER 6 AND 7
Supply of Ash discharge gate chute for bottom ash hopper
Attending patch welding works in fly/bottom ash conveying lines
Unit I BAHS Disposal of generated semi wet bottom ash
Unit II BAHS Disposal of generated semi wet bottom ash
Procurement of Fabric compensator for Bottom Ash Hoppers 52 mtrs
SS316 Scrapper feeder travelling wheel assembly for bottom ash hopper
Clearing of all kinds of wastage, debris, silt, fly ash etc
Sale of Fly ash from Mohanur offsite on Seasonal rate contract
Procurement of Bag filters for Fly Ash Buffer Hoppers 312 Nos
Biennial Maintenance contract for ESP and Fly ash system of NTECL
ANNUAL MAINTENANCE CONTRACT FOR ESP AND FLY ASH SYSTEM OF NTECL
Sale of Fly ash from Mohanur offsite on Seasonal rate contract
SPARES FOR OVERHAULING OF FLY ASH COMPRESSOR IN BOILER 5
MTPS I M II OAHS FAM PDFACS UNIT I Operation and Maintenance of pressurized dense fly ash collection system for disposal of dry fly ash on tonnage basis
MTPS I M II OAHS FAM PDFACS UNIT II Operation and Maintenance of pressurized dense fly ash collection system for disposal of dry fly ash on tonnage basis
MTPS I M II OAHS FAM PDFACS UNIT III Operation and Maintenance of pressurized dense fly ash collection system for disposal of dry fly ash on tonnage basis
MTPS I M II OAHS FAM PDFACS UNIT III Operation and Maintenance of pressurized dense fly ash collection system for disposal of dry fly ash on tonnage basis
MTPS I M II Circle OAHS FAM PDFACS Operation and Maintenance of pressurized dense fly ash collection system PDFACS for disposal of dry fly ash on tonnage basis