Loading…
Loading…
960 results • Best match
TTPS Mech II BM Unit V Cleaning of I II Pass Boiler structures from 0 metre to 56 metre elevation, PRDS floor HWMP BFP room collection and disposal of fly ash debris etc from Unit V Boiler Pressure parts area to debris yard for a period from the date
TTPS Mech II BM Unit IV Cleaning of I II Pass Boiler Structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and disposal of fly ash debris etc., from Unit IV Boiler Pressure parts area to debris yard for a period from the d
TTPS ES EM II Charges for routine cleaning of fly ash and coal dust from cable tray duct in boiler area and mill area and routine cleaning and maintenance work of boiler side fan motor mill motor lub oil motor feeder motor and pipe line in Unit II fo
TTPS ES EM II Unit I Charges for routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc and routine cleaning minor maintenance work of boiler side fan motors mill motors lub oil m
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from the date on or after 08 10 2019 and upto 31 03 2020
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2021 and upto 30 09 2021
TTPS ES EM II Charges for routine cleaning of fly ash and coal dust from cable tray duct in boiler area and mill area and routine cleaning and maintenance work of boiler side fan motor mill motor lub oil motor feeder motor and pipe line in Unit III f
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash, debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2022 and upto 30 09 2022
TTPS Mech II BM Unit IV Cleaning of I II Pass Boiler Structures 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and disposal of fly ash debris etc from Unit IV Boiler Pressure parts area to debris yard for a period from the date on
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2020 and upto 30 09 2020
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from the date on or after 08 04 2020 and upto 30 09 2020
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash, debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2021 and upto 30 09 2021
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 10 2022 and upto 31 03 2023
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 10 2020 and upto 31 03 2021
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 10 2022 and upto 31 03 2023
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 10 2020 and upto 31 03 2021
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures, PRDS valves and pipe lines, floor and disposal of fly ash, debris etc from Boiler area to debris yard for a period of work on or after 08 10 2021 and upto 31 03 2022
TTPS Mech II BM Unit V Cleaning of I II Pass Boiler structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and disposal of fly ash debris etc from Unit V Boiler Pressure parts area to debris yard for a period from the date
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines, floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2022 and upto 30 09 2022
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2020 and upto 30 09 2020
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2022 and upto 30 09 2022
TTPS Mech II BM Unit V Cleaning of I II Pass Boiler structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and disposal of fly ash debris etc from Unit V Boiler Pressure parts area to debris yard from the date of commenceme
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 10 2020 and upto 31 03 2021
TTPS Mech II AHP Unit I II III Breakdown works in Ash Water Pump House equipments Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves from the date of commencement of work and upto 31 03 2022
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 200NB M.S pipes for a length of 120Mtrs from Repair Bay II to Bottom Ash Hopper of Unit V. OHT II to Power House of Unit IV and V service water line including supply of 200NB
TTPS Mech II AHP Unit I II III Breakdown works in Ash Water Pump House equipments Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves from the date of commencement of work and upto 31 3 2022
TTPS Mech II AHP Unit I II III Breakdown works on Ash water pump house equipments Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves for the period of work on or after 08.04.2022 and upto 30.09.
Customized AMC/CMC for Pre-owned Products - Biennial Maintenance contract (BMC) of Instrument and Conveying air Compressors in Ash Handling System in NNTPS; Ingersoll Rand (India) Ltd; Annual Maintenance Contract (AMC); As per scope of work; No
TTPS Mech II AHP Unit I II III Breakdown works in Ash Water Pump House equipments Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves for the period of work on or after 08 04 2021 and 30 09 202
NCTPSISEMII Circle AHP DnUnit II OH Works 202526 Overhauling of various sizes of valves cleaning checking and rubber lining the ash water lines cleaning of ash water tank and ash slurry Sump etc in Ash Handling Pump House
NCTPSISEMII Circle AHP DnUnit III OH Works 202526 Overhauling of various sizes of valves cleaning checking and rubber lining the ash water lines cleaning of ash water tank and ash slurry Sump etc in Ash Handling Pump House
Custom Bid for Services - Supply of HDPE pipes fittings and valves erection of HDPE and MS pipes with associated items and dismantling of old MS pipes at various locations of NTPL Ash Handling Plant Similar Category Support Services
TTPS Mech II AHP Unit I II Attending maintenance works in Ash slurry sump strainers at Ash slurry pump house - Removal of clinkers and debris to avoid choking in ash slurry pump and ash disposal pipelines of Unit I II
TTPS MechII AHP Attending maintenance works in Ash Slurry sump strainers at Ash Slurry Pump House Removal of clinkers and debris to avoid choking in ash slurry pump and ash disposal pipelines of UnitI II III for the period from 01 04 2026 to 31
TTPS Mech II BM Unit I II III Cleaning of zero meter floor in between BAH Mill and disposal of fly ash debris etc from to debris yard for a period from the date of handing over of site on or after 01 04 2024 and upto 31 03 2025
TTPS Mech II AHP Unit I II III Breakdown works in Ash Water Pump House Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves for the period of work on or after 08 10 2020 and upto 31 03 202
TTPS Mech II AHP Unit I II III Breakdown works in Ash Water Pump House equipments Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves for the period of work on or after 08 10 22 to 31 3 23
TTPS Mech II AHP Unit I II III Breakdown works in Ash Water Pump House Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves for the period of work on or after08 04 2020 and upto 30 09 2020
NCTPSISEMII Circle AHP Dn Unit I OH Works 2025 26 Overhauling of various sizes of valves cleaning checking and rubber lining the ash water lines cleaning of ash water tank ash slurry sump etc in Ash Handling Pump House
Cleaning the roof tops of various buildings in Mill, Ash Handling, ESP, DM Plant 1 and 2, Hydrogen Plant, Auxiliary Cooling Water Pump House, Clarified Water Pump House in Unit 1 to 3 and clearing away the removed depo
Transportation of Dry Fly Ash from North Chennai Thermal Power Station to Ariyalur Cement Works
Transportation of Dry Fly Ash through bulk Tankers from Mettur to Ariyalur Cement Works, Ariyalur
NCTPSI SEMII Circle AHP Dn Watch and ward round the clock Routine Maintenance and Breakdown in Ash slurry Disposal Lines from Ash Handling Pump House to NCTPS stage-II Compound wall from date of taken over site to 31 03 2026
NCTPS I ES Circle EM II Dn S Dn II Provision of New Earth pits erection of new GI Earth pipes and laying of New GI Earth flats for improvement of earthing system at Ash Handling Pump House in NCTPS I
TTPS Mech II AHP Attending maintenance works in Ash Slurry sump strainers at Ash Slurry Pump House Removal of clinkers and debris to avoid choking in ash slurry pump and ash disposal pipelines of Unit I II III for the period from 01 04 2025 to 31
TTPS M II AHP Attending maintenance works in Ash Slurry sump strainers at ASPH Removal of clinkers and debris to avoid choking in ash slurry pump and ash disposal pipelines of Unit I II from the date of commencement of work and upto 31 03 2022
Clearing of all kinds of wastage, debris, silt, fly ash etc., from the dustbins in stage
Removing the old damaged refractory and applying the new refractory in the Dry bottom ash hopper reconditioning of Jaw crushers and Overhauling of butterfly valves in bottom ash Hopper area during the Annual Overhaul 24 25
TTPS MII AHP Attending maintenance works in Ash Slurry sump strainers at Ash Slurry Pump House Removal of clinkers and debris to avoid choking in ash slurry pump ash disposal pipelines of Unit I II III for the period from 01 04 2023 to 31 03 2024
Overhauling of Coarse Ash Handling Equipments and other related works