AHP Dn Rectification of defects in 6 Ton capacity 2 Nos for unit I II III EOT crane in ash handling slurry pump house by overhauling of long travels mechanism cross travels mechanism main hoists mechanism gear boxes inspection of control panels
Cleaning the roof tops of various buildings in Mill, Ash Handling, ESP, DM Plant 1 and 2, Hydrogen Plant, Auxiliary Cooling Water Pump House, Clarified Water Pump House in Unit 1 to 3 and clearing away the removed deposits to far off places
NCTPSI SEMII Circle AHP Dn Breakdown Routine Maintenance of Recovery Water Line No2 and 3 having OD 356 362 mm from Recovery Water Pump House to Ash Handling Pump House for a period from the handing over of site to 31 03 2026
Maintenance of 50LPH RO located in Adm Building Ash Handling Plant DM plant New Stores 33KV Sub Station Hydrogen plant FOC Fire Service and ECHS control room for the period of one year from the date of commencement of work at NCTPS I
AHP Dn Breakdown Routine Maintenance in Ash slurry Disposal Lines 1 to 5 Ash handling pump house to NCTPS stage II compound wall for a period of 3 months from the date of handing over of the site to 31 03 2024
NCTPS I M II Circle AHP Unit II O/H Works 2022 2023 Overhauling of various sizes of valves cleaning checking and rubber lining the ash water lines cleaning of Ash water tank Ash slurry Sump etc in Ash Handling pump House
NCTPS ISEMII Circle AHP Dn Unit I Renewal of Damaged foundation bolts Motor and Pump bed frame in Ash Handling Pumps 1A 2A 2C 3B Seal water Pump1A 2A 2B 3B and Flushing water Pump 1 and 2 and including RCC work
TTPS Mech II AHP Attending maintenance works in Ash slurry sump strainers at Ash slurry pump house Removal of clinkers and debris to avoid choking in ash slurry pump and ash disposal pipelines of Unit I II for the period of work on or after 08 04 2
TTPS Mech II AHP Attending maintenance works in Ash Slurry sump strainers at Ash Slurry Pump House Removal of clinkers and debris to avoid choking in ash slurry pump and ash disposal pipelines of Unit I II III for the period on or after 08 10 22 31
TTPS Mech II AHP Attending maintenance works in Ash Slurry sump strainers at Ash Slurry Pump House Removal of clinkers and debris to avoid choking in ash slurry pump and ash disposal pipelines of Unit I II III for the period from 01 4 24 to 31 3 25
Transportation of Dry Fly Ash through closed trucks from Tuticorin thermal power station to Alangulam Cement Works
Cleaning and Clearing the spilled Red hot bottom ash from DRYCON screw conveyor surrounding bottom ash hoppers area and Crusher house area transporting the ash to upper ash dyke by using the contractors vehicles of JCB and Tractors
Cleaning and Clearing the spilled Red hot bottom ash from DRYCON screw conveyor surrounding bottom ash hoppers area and Crusher house area transporting the ash to upper ash dyke by using the contractors vehicles of JCB and Tractors
Providing concrete coping to the structural columns of Drycon conveyor system in Bottom Ash Hopper area
Cleaning Clearing the spilled Red hot bottom ash from DRYCON screw conveyor surrounding bottom ash hoppers area and Crusher house area transporting the ash to upper ash dyke by using the contractors vehicles of JCB and Tractors and unloading
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Removal of Bottom ash from Unit-1 bottom ash conveyors by engaging Back hoe Loader (JCB-3DX) & JCB Robot 160 Skid -steer loader; AS PER TENDER DOCUMENT
Overhauling works in LT bus of 415V LT ESP(A,B,C,D, Fly Ash Ash Silo switchgearsComplete cleaning, tightness checking of horizontal, Vertical Bus bar, Bus bar joint, outgoing terminals, checking IR Value of LT buses of ESP, Fly Ash Silo switchg
Transportation of Wet Fly Ash through open trucks from Mettur Thermal Power Station to Ariyalur Cement Works, Ariyalur
Transportation of Dry Fly Ash from Neyveli Tamil Nadu Power Limited to Alangulam Cement Works, Alangulam Virudhunagar Dist.
Transportation of Dry Fly Ash through Closed Trucks from Thermal Power Station, Tuticorin to Ariyalur Cement Works, Ariyalur
Transportation of Dry Fly Ash through closed trucks from Tuticorin Thermal Power Station, Tuticorin to Alangulam Cement Works
Transportation of Dry Fly Ash through bulk tankers from mettru thermal power station mettur to Ariyalur Cement Works
TTPS MII AHP Attending maintenance works in Ash slurry sump strainers at ASPH Removal of clinkers and debris to avoid choking in ash slurry pumps and ash disposal pipe lines of Unit I and II for the period of work on or after 8 4 22 and upto 30 9 22
NCTPS I SE MI circle AHP Dn Renewal of existing wornout damaged Cast Basalt Lined Ash Slurry Disposal Pipe Line No 3 laid from Ash Handling Pump House to Ash Discharge Points at Ash dyke after dismantling the existing line and Erection of 4942 meters
MTPS I OANDAHS unit III IV Ash handling pump house stage II Dismantling of worn out suction pipe lines bends and grills in Ash slurry sump III and IV Fabrication and erection of 300NB M S suction pipes and bends in the suction lines
Cleaning the Roof Tops of various buildings in Mill, Ash Handling, ESP, DM Plant 1 and 2, Hydrogen Plant, Auxiliary Cooling Water Pump House, Clarified Water Pump House in Unit 1 to 3 and clearing away the removed deposits to far off places fo
NCTPS I SE MI circle AHP Dn Renewal of existing wornout damaged Cast Basalt Lined Ash Slurry Disposal Pipe Line No 2 laid from Ash Handling Pump House to Ash Discharge Points at Ash dyke after dismantling the existing line and Erection of 5511 meters
cleaning the Roof Tops of various buildings in Mill, Ash Handling, ESP, DM Plant 1 and 2, Hydrogen Plant, Auxiliary Cooling Water Pump House, Clarified Water Pump House in Unit 1 to 3 and clearing away the removed deposits to far off places for
NCTPS I Operation Circle O and E Dn Fire Fighting Replacement of worn out underground hydrant mains to above ground from ware house compound to Newly erected diesel bunk and Ash Handling Pump Gate to Fuel oil pump house area in Fire Protection S
Cleaning and Clearing the spilled Red hot bottom ash from DRYCON screw conveyor surrounding bottom ash hoppers area and Crusher house area transporting the ash to upper ash dyke by using the contractors vehicles of JCB and Tractors and unloading
Cleaning Clearing the spilled Red hot bottom ash from DRYCON screw conveyor surrounding bottom ash hoppers area and Crusher house area transporting the ash to upper ash dyke by using the contractors vehicles of JCB Tractors and unloading the same r
Monitoring Attending Patch welding works in fly bottom ash conveying lines to be attended round the clock
BM AOH Overhauling of Coarse Ash Handling Equipments and other related works
Transportation of Dry Fly Ash through bulkers from North Chennai Thermal Power Station (NCTPS) to Ariyalur Cement Works, Ariyalur
Transportation of Dry Fly Ash through bulk tankers from North Chennai Thermal Power Station to Ariyalur Cement Works, Ariyalur
Transportation of Dry Fly Ash through closed trucks from Tuticorin thermal power station, Tuticorin to Alangulam Cement Works, Alangulam
Transportation of dry fly ash through bulkers from Mettur Thermal Power Station, Mettur to Ariyalur Cement Works, Ariyalur District
Transportation of Dry Fly Ash through Bulk Tankers from Mettur Thermal Power Station Mettur to Ariyalur Cement Works, Ariyalur
STONE AGGREGATES SIZE 20 MM, STONE AGGREGATES SIZE 40 MM, M SAND, RIVER SAND FOR CONSTRUCTION, FLY ASH BRICK
Cleaning the Roof Tops of various buildings such as Power House, Ash Handling, Boiler, Bunker ESP4 and 5 Control Room CWPH 2 of Unit 4 and 5 at EL 3.00m to 52.80 m and clearing away the deposits to far off places for the period from 01.04.202
NCTPS I ES Circle EM II Dn SD n IV Cables Fabrication and Erection of cable tray support structure work in Ash Handling pump House motor room of Unit I and III with AHP transformer A and B yard and cleaning relaying binding and dressing variou
Breakdown Maintenance of Ash slurry Disposal Lines No 1 4 5 having OD 356 and ASDL No 2 3 having OD 406 mm from Ash Handling Pump House to NCTPS stage II compound wall for a period of 1 year from the date of handing over of the site
Transportation of Dry Fly Ash through bulkers from NLC Tamil Nadu Power Limited, Tuticorin to Ariyalur Cement Works Ariyalur District
Transportation of dry fly ash through bulkers from Tuticorin Thermal Power Station (TTPS), Tuticorin to Ariyalur Cement Works, Ariyalur District
Transportation of Dry Fly Ash from Tuticorin Thermal Power Station and NLC Thermal Power Limited, Tuticorin to Alangulam cement Works
Transportation of Dry Fly Ash through bulkers from North Chennai Thermal Power Station, Chennai to Ariyalur Cement Works, Ariylalur District
Transportation of Dry Fly Ash through bulkers from M/s. Neyvelil Lignite Corporation Limited, Neyveli to Ariyalur Cement Works, Ariyalur
TRANSPORTATION OF DRY FLY ASH THROUGH BULK TANKERS FROM METTUR THERMAL POWER STATION, METTUR TO ARIYALUR CEMENT WORKS, ARIYALUR DISTRICT
Transportation of dry fly ash through bulkers from NLC Tamil Nadu Power Limited, Tuticorin to Ariyalur Cement works, Ariyalur District
Transportation of dry fly ash through bulkers from NLC Tamil Nadu Power Limited, Tuticorin to Ariyalur Cement Works, Ariyalur District