Loading…
Loading…
960 results • Best match
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2026 and upto 31 03 2027
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 59000 MT fly ash in Unit I to V from the date of handing over of site
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 59000 MT fly ash in Unit I to V from the date of handing over of site
TTPS Mech II BM Unit III Cleaning of I and II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from 01 04 2023 to 31 03 2024
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 48000 MT fly ash in Unit I to V from the date of handing over of site
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 48500 MT fly ash in Unit I to V from the date of handing over of site
EM II Routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area, etc and routine cleaning and minor maintenance work of boiler side fan motors mill motors lube oil motors feeder motors
TTPS Mech II BM Unit I II III Cleaning of zero meter floor in between BAH Mill and disposal of fly ash debris etc from to debris yard for a period from the date on or after 08 04 2022 and upto 30 09 2022
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 55 000 MT fly ash in Unit I to V from the date of handing over of site
NCTPS II Civil Maintenance Circle Civil Maintenance Division Removal of silt earth fly ash and other debris from the drains infront of A row column and C row column upto the intersection point at main drain near RODM for a period of One year from
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 63000 MT fly ash in Unit I to V from the date of handing over of site
Unit III Routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc and routine cleaning and minor maintenance work of boiler side fan motors mill motors lub oil motors feeder motors
EM II Routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area, etc and routine cleaning and minor maintenance work of boiler side fan motors mill motors lube oil motors feeder motors
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 58000 MT fly ash in Unit I to V from the date of handing over of site
TTPS Mech II BM Unit I II III Cleaning of zero meter floor in between BAH Mill and disposal of fly ash debris etc to debris yard for a period from the date on or after 08 10 2020 and upto 31 03 2021
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 48500 MT fly ash in Unit I to V from the date of handing over of site
Repair and Maintenance Works to the Chimney for Unit 1 Repair Works to the Inner Walls of Chimney Fire Brick Lining Chimney Duct arrest the leakage of the Flue Gas from the bottom of Chimney including Cleaning of Fly Ash from Chimney Bottom and
Vertical Extension of Existing boundary wall upto 1.20m height with fly ash brick masonry and pillars, RCC Coping and Repairing damaged raised cut pointing including finishing work, providing two numbers of entrance gates after removing existing gate for KV school at Mandapam.(SH: Civil works)
Supply of 350 NB Seamless pipe ASTM A 106Gr B MS Coupling sets MS Welding Sleeve for complete replacement of recovery water line No1 from Recovery water pump house to Ash handling pump house
NCTPS I ES Circle EM II Division SD II Overhauling of 7 nos LT motors in AHP drives section AWP motor SWP motor SWBP motor in Ash Handling Plant CWP motor in AC Plant
TTPS Mech II AHP Unit II Attending overhauling works in Unit II ECO APH hoppers Ash disposal system flushing apparatus Rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in ECO APH hopper platforms duri
TTPS Mech II AHP Unit III Attending overhauling works in Unit III ECO APH hoppers Ash disposal system flushing apparatus Rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in ECO APH hopper platforms 20
TTPS Mech II BM Unit I Strengthening of weak welding joints of step grills platform grills renewal of damaged corroded structurals from 0 Mtr to 52 Mtr elevation and re routing of ash disposal pipe line of Unit I Boiler
TTPS Mech II AHP Unit I Attending overhauling works in Unit I ECO APH hoppers Ash disposal system flushing apparatus Rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in ECO APH hopper platforms dur
Custom Bid for Services - Biennial Maintenance Contract for Operation and Maintenance works Contract of Ash Handling System and Lime Handling System in TPS II Expn Similar Category Operation And Maintenance Of Other Machines And Plants
TTPS Mech II AHP Unit I II III Breakdown works in Ash Water Pump House Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves for the period from 01 04 2024 to 31 03 2025
TTPS Mech II AHP Unit I II III Breakdown works in Ash Water Pump House Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump sump pump and valves for the period from 01 04 2023 to 31 03 2024
MTPS I Mill Plant AC Plant AC Cooling tower stage I II sump tank overflow water drain line laying rerouting to Bottom Ash Hopper Unit I trench for Zero discharge of A Zone area and providing an accessories of water level indicator for Sump tanks
TTPS Mech II AHP Unit I II III Breakdown works in Ash Water Pump House Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump, sump pump and valves for the period from 01 04 25 to 31 03 26
NCTPS I CM Circle CM I Periodical cleaning of all drains in bottom ash hopper plant area boiler area and mill area in Unit I II III and C row drain at Power house for the period of one year from 01.04.2025 to 31.03.2026.
NCTPSI SE M II Circle For AHP Dn Unit I Attending breakdown works in Bottom Ash Hopper Scrapper feeder Clinker Grinders for a period of six months 2023-24 from the date of taking over of site or Completion of quantity whichever comes earlier
TTPS Mech II BM Unit IV Cleaning of I II Pass Boiler structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and devolution of scrap materials to stores and disposal of fly ash debris etc from Unit IV Boiler Pressure pa
TTPS Mech II BM Unit IV Cleaning of I II Pass Boiler Structures 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and disposal of fly ash debris etc from Unit IV Boiler Pressure parts area to debris yard from the date of commencement
TTPS Mech II BM Unit V Cleaning of I II Pass Boiler structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and devolution of scrap materials to stores and disposal of fly ash debris etc from Unit V Boiler Pressure parts are
TTPS ES EM II Unit III Charges for routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc and routine cleaning minor maintenance work of boiler side fan motors mill motors lub oil
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 8 00 000 MT fly ash in Unit I to V from the date of handing over of site
TTPS Mech II BM Unit V Cleaning of I II Pass Boiler structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and devolution of scrap materials to stores and disposal of fly ash debris etc from Unit V Boiler Pressure parts
TTPS Mech II BM Unit IV Cleaning of I II Pass Boiler structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and devolution of scrap materials to stores and disposal of fly ash debris etc from Unit IV Boiler Pressure parts a
NCTPS II Civil Maintenance Circle Civil Maintenance Division Removal of silt earth fly ash and other debris from the drains infront of A row column and C row column upto the intersection point at main drain near RODM for a period of One year from 0
TTPS Mech II BM Unit IV Cleaning of I II Pass Boiler Structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and disposal of fly ash, debris etc from Unit IV Boiler Pressure parts area to debris yard for a period fro
TTPS ES EM II Unit II Charges for routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc and routine cleaning minor maintenance work of boiler side fan motors mill motors lub oil
TTPS ES EM II Charges for routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc and routine cleaning and minor maintenance work of boiler side fan motors mill motors lub oil motor
TTPS Mech II AHP Unit 1 2 3 4 5 ESP Operation and maintenance of PDFAC system and wet sluice system including materials for the collection of 1 28 000 MT fly ash in Unit I to V from the date of handing over of site
Rate Contract for Excavation, loading of Pond Ash from Ash Dyke of NTECL-Vallur, transporting and unloading at construction site of road projects of NHAI and other Central or State Government road construction department / Authority / PMGSY Road Proj
MTPS I M II Circle OAHS Stage I and II Attending The breakdown Preventive maintenance in Ash Slurry Line IA IB IC ID IIA IIB IIC And IID streams from outside the Ash Handling Pump House
Custom Bid for Services - supply of galavanized grills and steel items and replaced in the chequer plates with this galavanized grill in all the ISH and silo area of ash handling system Similar Category Support Services
TTPS Mech II AHP Unit I II Attending maintenance works in Ash slurry sump strainers at Ash slurry pump house Removal of clinkers and debris to avoid choking in ash slurry pump and ash disposal pipelines of Unit I II
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from the date on or after 08 10 2019 and upto 31 03 2020
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 10 2022 and upto 31 03 2023
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures, PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from the date on or after 08 04 2021 and upto 30 09 2021