Loading…
Loading…
542 results • Best match
Repiaring and Maintenance of DG Sets on call basis in different TEs BTS sites in Kanker and nearby area under BA Bastar. For the year 2025-2026
Repiaring and Maintenance of DG Sets on call basis in different TEs BTS sites in Jagdalpur and nearby area under BA Bastar. For the year 2025-2026
Annual Operation and maintenance of Directorate of Census, CG Office building, Naya Raipur during the year 2025-26, SH-I Operation and routine maint. of 11/0.433 KV Sub Station, 82.5 & 125 KVA DG Set i/c internal & external EI installation & CCTV & PA System. SH:-II Operation repairing and maint of 2 nos. 10 passenger & 1 os. 15 passenger lifts.
Construction of Office-cum-Museum and Auditorium Building for Anthropological Survey of India, Sub-Regional Centre, Jagdalpur (C.G.). SH: Construction of Office cum Museum bldg. (B plus G plus 7) & Auditorium Bldg. (GF) including development works, ... Substation, DG set , ...
Custom Bid for Services - Drawing of Temporary 440V 220V LT Overhead Line on as and when required basis for providing power supply for illumination siren operation and other temporary mine installations within the mine premises for a period of two ... Generator( DG -Set) ... Generator(DG- Set )
As per BOQ
LIGHTING MAST POLYGONAL SHAPE, TYPE LM30, MOVABLE LIGHTING MAST WITH DG SET, FIXTURES FOR MAST, GS FLAT 50 X 6 MM
Special Visit for Functional Test of 15 20 KVA DG Set in TE BTS Sites nearby Kanker under BA Bastar Jagdalpur
Job contract for O/H and Maintenance of TG and Auxiliaries including Aircompressor and DG set area equipments of NTPC Unchahar
LIGHTING MAST POLYGONAL SHAPE, TYPE LM30, MOVABLE LIGHTING MAST WITH DG SET, FIXTURES FOR MAST, GS FLAT 50 X 6 MM
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested ... - DG Set (up ...
Replacement of defective Service Cable at GSM BTS NMDC Nagarnar and shifting and reinstallation of DG sets at Nileshnar Kinjoli and SF LED Fittings at Type V Staff Quarter under Bastar BA
Annual Operation and Maintenance of Directorate of Census, Chhattisgarh, Office Building, Naya Raipur during the year-2023-24. SH:-I- Operation and routine maintenance of 11/0.433 KV Sub-station, 82.5 and 125 KVA DG Set i/c Internal and External EI Installation at Directorate of Census, Chhattisgarh, Naya Raipur. SH:-II- Operation repairing and maintenance of 2 Nos. 10 Passenger lift and 1 No. 15 Passenger lifts at Directorate of Census, Chhattisgarh, Naya Raipur.
Supply of Poles & Mast-Lighitng Mast Octagonal shape, Type LM30, Supply of Poles & Mast-Fixtures for Mast, Supply of Poles & Mast-Movable Lighitng Mast with DG set
SUB-HEAD - Civil Work including Electrical work, Sanitary and Plumbing, External Water Supply System, Fire Protection System, Street Light, DG Set, CCTV, Landscaping and other Allied Works etc
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6510672 Dated : 18-08-2025 Bid Document 1/15 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 422000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 4 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SECL GEVRA AREA` SOMM OFFICE OF THE GENERAL MANAGER SECL GEVRA AREA KORBA CHATTISGARH PO- GEVRA PROJECT PINCODE-495452 SECL Bilaspur Chhattisgarh, COAL INDIA LIMITED, South Eastern Coalfields Limited, Ministry of Coal (Secl Gevra Area) Splitting
Annual Maintenance of HT & LT Electrical Systems, Building Electrification, and Comprehensive Annual Maintenance of UPS Systems, Fire Alarm System, DG Sets, and Telephone System at Paryawas Bhawan, Sector-19, Nava Raipur Atal Nagar, District Raipur (C.G.)”(1st Call)
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6496318 Dated : 25-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 21650 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PWD E&M DIVISION NAVA RAIPUR E-in-c, Pwd, Nirman Bhawan Raipur, Public Works Department Chhattisgarh, N/A, (Executive Engineer) Splitting
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6528136 Dated : 04-08-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 18500 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Superintendant of Police The SP office district korba, infront of Collector Office Chhattisgarh (The Sp Office District Korba) Splitting
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6437208 Dated : 10-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 9600 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PWD E&M NAWA RAIPUR E-in-c, Pwd, Nirman Bhawan Raipur, Public Works Department Chhattisgarh, N/A, (Executive Engineer) Splitting
Custom Bid for Services - 200152847-Contract for Overhauling of Boiler Pressure Parts, Burner, Hanger, etc for NTPC Lara Similar Category Operation and Maintenance Services of Power Generator(DG-Set)
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7086452 Dated : 09-01-2026 Bid Document 1/9 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank ICICI EMD Amount 50000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : NTPC Ltd SSC COAL MINING NTPC, NA, NTPC Limited, Ministry of Power (Ntpc Ltd)
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6714281 Dated : 25-10-2025 Bid Document 1/12 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 110000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 32 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/12 (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PFA/SECR/BILASPUR HQ NEW GENERAL MANAGER SECR, Indian Railways, South East Central Railway, Ministry of Railways (Pfa/secr/bilaspur)
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6434746 Dated : 14-08-2025 Bid Document 1/14 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 115180 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 38 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/14 PFA/SECR/BILASPUR HQ NEW GENERAL MANAGER SECR, Indian Railways, South East Central Railway, Ministry of Railways (Pfa/secr/bilaspur) Splitting
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6973642 Dated : 06-12-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 8000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/6 The commandant The Commandant 15th Bn Caf Dhanora District Bijapur (C.G.) (The Commandant Of Fifteen Bn Bijapur)
Job contract for Electrical Maintenance of complete Electrical system,Air conditioners and DG set at ER-1HQ office, its guest houses,residential office of RED(East-1) and Bachelor accommodation.
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6610561 Dated : 01-09-2025 Bid Document 1/11 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 48240 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 32 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PFA/SECR/BILASPUR HQ NEW GENERAL MANAGER SECR, Indian Railways, South East Central Railway, Ministry of Railways (Pfa/secr/bilaspur) Splitting 2/11
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6686932 Dated : 02-11-2025 Bid Document 1/12 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 37714 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 36 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : PFA/SECR/BILASPUR HQ NEW GENERAL MANAGER SECR, Indian Railways, South East Central Railway, Ministry of Railways (Pfa/secr/bilaspur)
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6747235 Dated : 10-10-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank ICICI EMD Amount 50000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : NTPC Ltd. SSC COAL MINING NTPC, NTPC Limited, Ministry of Power (Ntpc Ltd.)
As per BOQ
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6914041 Dated : 21-11-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 9000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/6 The commandant 17th Btn Ir Kabirdham, Home Department Chhattisgarh, Chhattisgarh Police, (The Commandant Of Seventeen Bn Caf Kabirdham)
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6701064 Dated : 19-09-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 18000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/6 The Superintendant Of Police Kabirdham Office of the SP Police Kabirdham, Home Department Chhattisgarh, N/A (Superintendent Of Police) Splitting
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7095682 Dated : 22-01-2026 Bid Document 1/11 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 87400 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 36 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : FA and CAO HQ NEW GENERAL MANAGER SECR, Indian Railways, South East Central Railway, Ministry of Railways (Fa And Cao/secr/bilaspur)
SITC of 100 kVA DG set, Supply and Cable Laying in open duct, Supply and Cable Laying in pipe, Supply and Cable Laying on cable tray, Supply and Cable Laying on surface
As per BOQ
Power Generator - DG Set (up to 900 KVA) (Q2) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7086884 Dated : 08-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 24 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Executive Engineer Raipur, Department of Water Resources River Development and Ganga Rejuvenation, Central Ground Water Board (CGWB), Ministry of Jal Shakti (Keshab Chandra Nayak) UIN Number NCTGC2415P
Operation and Comprehensive Maintenance of Electromechanical Service in T Ex Fafadih Raipur and Its Staff Quarerter Compound SH Major Reapring of 600 KVA DG Set Split AC PCB and Replacement and repairing of Other Electrical items
Part A 1) MOEI and fans i/c RMO of Pump sets, S/lights, comp. light I.T. office Bldg. and Resdl. Qtrs. Civil Lines at Raipur. 2) MOEI and fans i/c RMO of pump sets, S/ lights, Com./ light I.T. Office Bldg. and Resdl. Qtrs at Bhilai. 3) MOEI and fans ... KVA DG set at ... system, DG set and ...
Custom Bid for Services - 200143071 - Biennial maintenance contract for gen, VFD, DG set, H2 plant, EOT cranes, lifts, offsite EOTs & ground mounted & rooftop solar generation plant at sipat Similar Category Operation and Maintenance Power House/Power Plant
Execution of balance work in the campus of New Technology Centre of MSME at Durg for finishing work of internal partitions, false ceiling, aluminium windows, flooring, painting, external development work such as roads, boundary wall, paver blocks, ... system, DG set , ...
Hiring of Tent 10 x 12, Hiring of Tent 12 x 15, Hiring of PA Speaker and Machine, Hiring of Seating arrrangment, Hiring of JCB for ground maint, Hiring of road roller for ground lavelling, Hiring of DG set with control panel, Hiring of extension bd and heavy duty power cables, Installtion and labour charge
portable emergency lighting sysetem Portable Emergency Lighting Sysetem ( 1 ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Allowed Values GENERIC Availibality of Patent rights from Shri SANJEEV ... CONSTRUCTIONAL Generator Set : ...