Loading…
Loading…
1,391 results • Best match
Electrical
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Mini Truck mounted telescopic tiltable lighting tower of 7mtr height each with DG Set including 08 nos 400W LED Flood Lights fittings; Mini Truck mounted te..
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Hiring of 07 nos Mini truck mounted Lighting Tower with Light Fittings and DG Set composite system comprising of Mini Truck with..
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Mini truck mounted telescopic tiltable lighting tower 7 mtr height each with DG set including 08 nos 400W LED flood light fittin..
Laying of DI K9 and K7 CWRM, Construction of RCC MBR, Pump House, Watchman Shed, EOT Crane, Installation of Pump Sets with Pumping arrangement, Boundary Wall with Gate, Installation of 250 KVA Substation and 320 KVA DG Set, etc.
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Mini Truck mounted telescopic tiltable lighting tower of 7mtr height each with DG Set including 08 nos 400W LED Flood Lights fittings; Mini Truck mounted te..
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Mini Truck mounted telescopic tiltable lighting tower of 7mtr height each with DG Set including 08 nos 400W LED Flood Lights fi..
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Mini Truck mounted telescopic tiltable lighting tower of 7mtr height each with DG Set including 08 nos 400W LED Flood Lights fit..
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Mini Truck mounted telescopic tiltable lighting tower of 7mtr height each with DG Set including 08 nos 400W LED Flood Lights fittings; Mini Truck mounted te..
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Mini Truck mounted telescopic tiltable lighting tower of 7mtr height each with DG Set including 08 nos 400W LED Flood Lights fittings; Mini Truck mounted te..
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - Mini Truck mounted telescopic tiltable lighting tower of 7mtr height each with 7point5 KVA DG Set including 08 nos 400W LED Flood Lights fittings; Mini Truc..
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Mini Truck mounted telescopic or tiltable lighting tower of 7mtr height each with DG Set including 08 nos 400W LED Flood Lights ..
Emergency lighting and accessories (PORTABLE EMERGENCY LIGHTING SYSTEM Tower type With AC Genset) (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6758350 Dated : 06-10-2025 Bid Document 1/5, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 11 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Electrical O and M works
Operation and Maintenance of Electromechanical Services
O and M of Electrical Installations at BSNL Bhawan, Bhubaneswar
Construction of 4.0 ML WTP, Laying of DI Distribution System, Railway, NH Crossing by HDD Method, WTP Site Development, Construction of Recycle Pond, Retaining Wall, Laying of Washout Line, Hume Pipe Drain, Installation of DG Set and OM for 5 Years
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Hiring of 02 nos Mini truck mounted Lighting Tower with Light Fittings and DG Set composite system with Mini Truck with one nos ..
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Mini Truck mounted telescopic tilting lighting tower of 7mtr long with DG Set 08 nos 400W LED Flood Light fittings; Mini Truck m..
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Mini Truck mounted telescopic or tiltable type lighting tower of 7mtr height each with DG Set including 08 nos 400W LED Flood Li..
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Mini Truck mounted telescopic or tiltable type lighting tower of 7mtr height each with DG Set including 08 nos 400W LED Flood L..
Constn. of 4.0 ML CWR, 5 Nos. RCC ESRs, Laying of DI CWPM, DI Distribution Networks, HSC, Constn. of Boundary Wall, CC Approach Road, RCC Pump House, Site Development, Installation of Pump Sets, Silent DG Set, External Electrifiation, OM for 5 Years
Electrical Work
Emergency lighting and accessories (PORTABLE EMERGENCY LIGHTING SYSTEM Tower type With AC Genset) (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 4 Bid Number : GEM/2025/B/6673183 Dated : 12-09-2025 Bid Document 1/6, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Construction of 2 Nos Academic Blocks G plus 3, Administration Block G plus 3, Library Block G plus 3, 250 Boys Hostel Block G plus 3, 250 Girls Hostel G plus 3, Sub Station Building and attached Development Works like internal roads, Footpaths, ... Sub-stations, DG Sets , ...
REPAIR REPLACEMENT OF LT CABLES NETWORK LT BREAKERS PANELS FEDDER PILLARS EARTHING AND ALLIED WORKS AT PXE TECH AND RESIDENTIAL AREA AT PXE CHANDIPUR AND REPAIR REPLACEMENT OF EXTERNAL ELECTRIFICATION DEHYDRATION OF TRANSFORMERS REPAIR TO DG
Hiring of one no. of 10 wheel truck chassis mounted mist blower fog cannon along with min. 25 KVA DG Set and min 12 KL Water Tank and suitable no. of nozzles on monthly basis for use in pilot project of OB and fly ash mix at DLCMP Sundergarh.
Custom Bid for Services - 800063915 Round the clock Operation and Maintenance of Electrical works in General and shift duties at NTPC ER-II office, NTPC Guest House Pokhariput and ER-II New office Building cum residence for 06 Months Similar Category ... Generator( DG -Set) ... Generator(DG- Set )
Fire Fighting Work
PROCUREMENT AND INSTALLATION OF COLD ROOM 09 TON AT LOGISTICS COMPLEX, PROCUREMENT AND INSTALLATION OF COOL ROOM 06 TON AT LOGISTICS COMPLEX, 60 KVA 3 PHASE DG SET, COLD AND COOL ROOM COMPLEX, FRONT WALL PANELING WITH ACM, SIGNAGE BOARDS WITH 1FT LED LIGHT LETTERS WITH INDIAN NAVY AND CHILKA CREST, RACKS FOR BOTH COLD AND COOL ROOM 10X10X7
Weather Coat Anti Dust, Weather Coat white, Weather Coat 3T0836, Weather Coat 3T0861, Brush 4 inch, Aliminum 3 thrack window, Aliminum 2 thrack window, Aliminum wall drop, Aliminum cupboard almirah, LED Tube light, Street Light, Exhaust Fan 12 Inch, ... iGreen DG Set confirming ...
Over current, Under voltage, Pin Type, Hydrometer, Hand Drill Machine, Portable Electric Drill Machine, Laboratory Type Induction Coil, Out Side Micrometer, Thermometer, Series Test Lamp, Miniature Breaker, Earth Plate 2mm Copper, Earth Plate, MCCB ... Battery, Diesel Generator Set , ...
Aeroponic facility for Sweet Potato and Greater Yam Structure, Aeroponic facility for Sweet Potato and Greater Yam Sliding Door, Aeroponic facility for Sweet Potato and Greater Yam Covering, Aeroponic facility for Sweet Potato and Greater Yam ... Yam Genset with
insulated 100 mm (Q3), Tweezers 150 mm (Q3), " Relay- Cut out Relays with panel and accessories" (Q3), " Relay- Reverse current with panel and accessories" (Q3), " Relay- Over current with panel and accessories" (Q3), " Relay- Under voltage with ... " Diesel Generator Set with ...
Annual Maintenance service-AIR CONDITIONER, Comprehensive Annual Maintenance Services for Precision Air Conditioners, AMC/CMC of Fire Detection, Fire Alarm, Fire Hydrant and Sprinkler System, AMC of Integrated Security and Surveillance System - CCTV ... KVA GENSET ; ...
portable emergency lighting sysetem Portable Emergency Lighting Sysetem ( 17 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Availibality of Patent rights from Shri SANJEEV MITAL r/o, Plot no. 102, Aditya ... CONSTRUCTIONAL Generator Set : ...
Online UPS 5 KVA for Critical Infrastructures Average Turn Over of Last 3 Years 4 Lakh (s) Experience with Gov. Required 5 Year (s) Online UPS 5 KVA For Critical Infrastructures ( 1 ) Technical Specifications * As per GeM Category Specification ... have DG set compatibility ...