Loading…
Loading…
190 results • Best match
APPOINTMENT OF VENDORS FOR PROVIDING SERVICES OF VEHICLE TRACKING SYSTEM (VTS) FOR OWNED / HIRED / RENTED VEHICLES USED BY FCI APPOINTED RTCs DURING ROAD TRANSPORT OF FOODGRAINS
GPS Tracking System (Q3)
GPS Tracking System (Q3)
GPS Tracking System (Q3)
GPS Tracking System (Q3)
GPS Tracking System (Q3)
Fixing of GPS with Vehicle Tracking System in FST SST vehicles EVMs VVPATs transportation vehicles Zonal and Sector Magistrate and Polling Parties Vehicles
EDGE GPS TRACKING DEVICE SYSTEM
Ornitela In Compliance GPS Tracking System
CONCOX In Compliance GPS Tracking System
CONCOX In Compliance GPS Tracking System
Supply including Annual Maintenance for a period of 3 years of Mobile Testing Van complete with internal fabrication, exhaust system, air conditioning system, waste disposal system, GPS tracking facility etc Quality Control Testing Equipment.
Garmin Foretrex 601 Military GPS Watch, Coaxial Electric Wire, Telephone Set B, Screw for Nut opening, Multi Two Way, Multi One Way, Grass Cutting Wire 50 Mtr, Garden Spike Light 7W
Boom Barrier, Scanner, MDC, ANPR, Inverter 1400VA, GPS Tracker Vehicles, RFID Tags for Defence Vehicles, PC with Allied Accessories for RFID, OLED Display Screen 55 Inch for RFID, Bullet Camera, Network Video Recorders with Storage, Installation Charges
RFID BASED LOCATOR (Q3), RFID BASED MARKER (Q3)
RFID tagging system (Q3)
Procurement of 209 nos PTs and 47 nos VTs along with 2
SITC of RFID Based Animal Module
RFID System for BPET/CPT/PPT
RFID Door, Bag for Dak, Record Board as per sample, Telephone with digital display, Extension Board
RFID RUNNING TRACKING AND MONITORING SYSTEM FOR
Handheld GPS
SUPPLY OF EQUIPMENT FOR RFID CUM QR BASED DPT
hand held gps
hand held gps
hand held gps
hand held gps
hand held gps
hand held gps
hand held gps
GPS Tracking System (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6771594 Dated : 09-10-2025 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
RFID Based Digital File Tracking and Inventory Management System (Q3)
hand held gps (Q2)
hand held gps (Q2)
construction of gps sarkanda
P-60 GPS DRONE
hand held gps (Q2)
hand held gps (Q2)