Loading…
Loading…
491 results • Best match
Pre Monsoon work 2024 - Malappuram-Manjeri Olipuzha road (Km 0/000 to 16/200), Poolamanna- thaliyankund road at km 4/350 and ends at km 11/660 (vaniyambalam Town), Mundengara- Pulippadam - odayikkal - veettikkunnu and Coastal highway Reaches
Expression of Interest (EOI)/ BID for Operation and Maintenance of facilities/amenities at toll plazas under Highway Nest (Mini) including the toilets constructed under Swachh Bharat Mission in the State of Kerala under the Jurisdiction of RO TVM
investigation for bridge
Boundary stone planting
Valuation of structures
Valuation of structures
SITC of 8 Mtr Mini Mast lights at Chirakkal Palli Parisaram ward 7, 17th Kallu Highway Parisaram ward 10, Kannampullipuram Vayanassala Parisaram Tippu sulthan Road ward-15 in Edathiruthy Grama Panchayath under MPLADS 2022-23 of Sri Benny Behnan MP (C
Shifting KWA Utilities - along Mananthavady Kalpetta road ( chainage 24/600 to 30/800) and Kalpetta Byepass Road (chainage 0/000 to 3/800) - Pipeline Work.
07/26
KRFB Relaying of Jalanidhi pipelines (ANJUKUNNU L WSS) along Boys Town to Manathawady PWD Road at Panamaram Grama Panchayath, Wayanad District.
GENERAL NHAI Thuravur Aroor Elevated Highway Project Maintenance of deviation Roads Providing BC overlay to Thuravur Kumbalangi Road Ch 0 000 to 10 350 and Thuravur Makkekadavu Road Ch 0 000 to 5 200 TOTAL 15 55Km and allied works in Alappuzha D
Premonsoon work and Rectification work
Repair work
COLD TAPE INNER WRAP WR WASHALA, COLD TAPE OUTER WRAP WR WASHALA, PRIMER WR WASHALA, MASTIC FILLER WR WASHALA, COATING WRAPPING MACHINE WR WASHALA, COLD TAPE INNER WRAP WR GUJRI, COLD TAPE OUTER WRAP WR GUJRI, PRIMER WR GUJRI, MASTIC FILLER WR GUJRI, COATING WRAPPING MACHINE WR GUJRI, COLD TAPE INNER WRAP CR KOTA, COLD TAPE OUTER WRAP CR KOTA, PRIMER CR KOTA, MASTIC FILLER CR KOTA, COATING WRAPPING MACHINE CR KOTA, COLD TAPE INNER WRAP CR BINA Incl BPPL complete, COLD TAPE OUTER WRAP CR BINA Incl BPPL complete, PRIMER CR BINA Incl BPPL complete, MASTICFILLER CRBINA Incl BPPL complete, COLD TAPE INNER WRAP VBPLVADINAR, COLD TAPE OUTER WRAP VBPLVADINAR, PRIMER VBPLVADINAR, MASTICFILLER VBPLVADINAR, COATINGWRAPPING MACHINE VBPLVADINAR, COLD TAPE INNER WRAP SR KOCHI Incl KHPL complete, COLD TAPE OUTER WRAP SR KOCHI Incl KHPL complete, PRIMER SR KOCHI Incl KHPL complete, MASTICFILLER SR KOCHI Incl KHPL complete, COATINGWRAPPING MACHINE SR KOCHI Incl KHPL complete, COLD TAPE INNER WRAP NRPIYALA, COLD TAPE OUTER WRAP NRPIYALA, PRIMER NRPIYALA, MASTICFILLER NRPIYALA, COATINGWRAPPING MACHINE NRPIYALA
High End Desktop Computer (Q2) (3 (3 ))
SLTF - Eviction of encroachment 2021 - 22 - Dismantling and Disposal of Evicted display boards, hoardings, banners etc. abutting highways under PWD Roads section Kannur
RETARING
Pre monsoon
Plot development, retaining wall
Construction
Construction
Utility shifting from Pookotumpadam to Kelunairpadi for the construction of Malayora highway
The entire length is proposed to restored with GSB and WMM Since BT portion is also damaged due to KWA
Land development
A n n u a l P l a n - T h r i s s u r C o r p o r a t i o n koorkanchery zonal div 33 PROJECT 272/24- 25 cleaning of chal through Alum vettuvazhi pattala kinar St Joseph -street highway
KIIFB-HILL HIGHWAY- GOPALAPURAM T O N E D U M A N I , R E A C H 1 - GOPALAPURAM TO KANNIMARIMEDU, CH 0/000 TO CH 14/860- PALAKKAD DISTRICT- Survey Works and Laying Boundary Stones-PART TS-2-Site Clearance and Boundary Pillars-General Civil Work
RE TENDER NO 1 of 1 2022 23 EE
Planting of Boundary stones
Construction of retaining wall
4 Door Filing Cabinets, Steel Rack, Air Conditioner 1.5 Ton, Air Conditioner 2 Ton, All In one Computer
Investigation with boundary stone laying
Valuation of structures
KIIFB-Relaying of Boundary stone for certain locations as per SIS study
open graded premix carpet
Boundary stone laying
Construction
clearing jungle solid block masonry for ramp filling excavated earth cement concrete1 2 4 chequered tile inter lock grill for veranda hand rail for ramp painting cleaning water tank sanitary fittings and electrical maintenance works etc
Boundary stone planting work
BT patch works
Traffic Survey, Soil Collection and Testing, BBD, Pavement Composition Details,Topographic Survey, Inventory and Subsoil Investigation
Boundary stone planting work
Urgent Rectification Work
Construction