Loading…
Loading…
489 results • Best match
Please refer the tender documents
Please refer the tender documents
Independent Engineer services for Rehabilitation of State Highways and Major District Roads Package A Kasargode District Total length 25 Km Package B Kottayam and Thiruvananthapuram District Total length 58.00 Km in the state of Kerala
estimate provisions included for the demolition of encroachments, removal of unauthorized arches, hoardings ,placards and banners with poles or frames at fixed which abuts the highways and pedestrians as per the direction of honourable Highcourt
BOUNDARY STONE LAYING WORK
Civil works
Shifting of electric lines and associate equipments in favour of KRFB under electrical section Kakkayangad
Investigation with boundar stone laying
Traffic Survey, Soil Collection and Testing, BBD, Pavement Composition Details,Topographic Survey, Inventory and Subsoil Investigation
DRAINAGE
Boundary stone laying and Total station survey
Detailed Topographic Survey, Establishing DGPS Control Points, Traverse control points, CBR Subsoil Investigation
Shifting of 24m RTT at CHANGANKULANGARA from old building to new building in the same compound in connection with highway widening
Maintenance work
The proposed estimate includes works such as filling of pot holes using 36mm, levelling undulations in road using 12mm metal, 20mm thick close graded BT surfacing works.
Construction of bridge and approach road
Shifting of HT and LT poles and line due to road widening Malayora Highway under Electri-cal Section, Kanchiyar. Work code 574634022100183
SHIFTING HT/LT OH LINES AND POLES ALONG KALLULLATHODE TO PERUMPALLY ROAD AS PART OF HILL HIGHWAY YNDER KSEB ELECTRICAL SECTION PUTHUPPADY
ROAD
This estimate consists of pothole filling with 36mm aggregates and levelling coarse with 12mm aggregates,Laying of interlocking tiles 100 mm in water logged areas and close graded chipping carpet provision
ROAD WORK
Topographic Survey, DGPS, Traverse Survey and Subsoil Investigation
taring
Construction
BOUNDARY STONE LAYING WORK AND TOPOGRAPHIC SURVEY WORK
This estimate consists of pothole filling with 36mm aggregates,Laying of interlocking tiles 100 mm in water logged areas and close graded chipping carpet provision after pothole filled area
Pre monsoon work
Rectification works
Shifting KSEB utilities along Meenangadi Panamaram road from Meenangadi to Varadoor in connection with KIIFB Hill Highway Project road widening work under Electrical Section Meenangadi.
This estimate proposes filling up potholes with 36mm metal, 12mm metal leveling undulation,levelling course, and 20mm close graded chipping carpet work.
Construction
Shifting HT and LT poles Utility Shifting in connection with Malayora highway to side of the road for road widening work location from Parassala to Palukal
Reallignment of HT/LT lines and allied equipments -Part I) in connection with Hill Highway project (KIIFB 2017-18)from Ambalakkadavu to Arippa under ES, Kulathupuzha .
Boundary stone laying
Maintenance
Topographical Survey Work
Sales of tree
Shifting of HT and LT line Transformers DP structures Excavation of pits for poles and stays fitting and erecting of poles stringing ACSR conductors HT and LTmFitting of AB switches providing stays DPs and earthing
Investigation with boundary stone laying
Premonsoon works