Loading…
Loading…
491 results • Best match
Premonsoon works
Dismantling and reerrecting of HT/LT lines and accessories along Kambalakak - Madakkimala road from the existing position to the side of the road in connection with road widening work
Shifting of HT and LT lines and utilities along Mulleria to Bellacheri road in connection with the upgradation of Hill Highway from Chevar to Edaparmba under Electrical section Mulleria
Executive Engineer KRFB PMU Kasargod through Letter No EE KRFB PMU KSD PWD013 28 2021 22 dtd 7 03 2022 requested to conduct CBR Subsoil investigation for the proposed alignment for Minor bridges at Pallanchi
Pre-Monsoon work
Boundary stone laying,Topographical survey work
Fixing boundary stone of standard design and Topographical survey work-General Civil Work
Valuation of structures
Boundary stone laying-Topographical Survey Work
Investigation with boundary stone laying
Rectification works,Close gradedBitumen chipping carpet
Construction of retaining wall
Shifting HT and LT OH line and Poles Shifting Transformer staions snd DPs AB switches Aerial Bunched Cable
Construction
EWE,C.C,Plastering
KIIFB DEPOSIT OF HILL HIGH WAY RWSS TO PARASSALA RELAYING OF WATER SUPPLY PIPE LINE ON THE BOTH SIDES OF PROPOSED HIGHWAY FROM KANNUMAMOODU MANURE SHOP TO PULIYOORSALA JUNCTION-Pipeline Work1
Shifting of HT/LT lines and accessories from Kainatty to Madakkimala to the side of the road which includes dismantling and re errecting poles/ DP structures / Transformers / Stays / Struts / Fly Stays as per the schedule attached
Patch work using close graded premix carpet of 20mm
Provisions included in the estimate are conduct topographical survey, cross sectional details , Hydraulic velocity of thode and soil investigation detais of 4 nos of boreholes ateach sides bridges
Construction
Deposit Work by CSML Pilot project-WSS to Kochi city - Supplying and fixing advanced Automatic Smart Metering infrastructure for consumers in Kochi Corporation at Highway Junction to Thevara Ferry in Division No 26old
all the unauthorized arches, display boards, hoardings, placards and banners with poles or frames etc fixed to and/or dug into the ground, which abuts the highway, public streets and pedestrain pavements sha
Construction
Construction
laying boundary stone
Laying boundary stone
Investigation with boundary stone laying
Clearing jungle,Demolishing CC 1 4 8,earth work excavation,pcc 1 4 8,centring shuttering,pcc1 3 6,pcc1 2 4,steel reinforcement,plastering
The proposed estimate includes works such as filling of pot holes using 36mm, levelling undulations in road using 12mm metal,WMM for damaged portions and 20mm thick close graded BT surfacing works.
Road work
Boundary Stone Laying and Total station survey
latying boundary stone
Four Laning of Thalssery Mahe bypass section of NH17 from KM 170.600 to KM 188.000 under NHDP Phase III on EPC Mode in the state of Kerala One time improvement of existing highway from KM 174.000 TO KM 184.600
DEPOSIT-KRFB-Hill Highway KRFB-2017-2018- Improvements to Peerumedu, Devikulam road KM 19/000 to 40/050 and Thodupuzha -Puliyanmala road KM 85/500 to 92/167 in Idukki dist-Shifting of KWA utilities -Improvement works to Peerumedu Devikulam road
KIIFB Deposit of Hill High way RWSS to Parassala Relaying of water supply pipe line on the both sides of proposed Highway from Parassala post office Junction to Palukal CSI Church and Kannamoodu manure shop to Puliyoorsala jn Pipeline Work
Cautionery and Informatory sign boards, DLP boards and premonsoon works, Rotine inspection etc, site clearence, hydraulic excavator, tipper
Stone Laying and Total station Survey
SHIFTING EXISTING HT/LT OH LINE, DTRs, STAYS, AB CABLE AND OTHER ACCESSORIES ALONG KALPETTA BYE PASS ROAD TO THE SIDE OF ROAD IN CONNECTION WITH ROAD WIDENING
Jungle clearance, side drain clearance, Cleaning of sign boards and Cutting the overhanging branches of trees
Please refer Tender document