Loading…
Loading…
7,454 results • Best match
Finishing work by way of plastering /POP/ wall putty/tile and Granite work for Administrative Block of Medical College at Baramulla
e-NIT for SITC and CAMC of Machinery and Equipment required at Medical College, Kakryal (Group F - High End Medical Equipments)
Internal Sanitary / Plumbing/Water Supply And Sewerage System Up to First Manhole Of Girls Hostel At Govt. Medical College Works Anantnag
SITC of LT Cable for External Power Connection from 400 KVA Transformer to Central Library Block at Government Medical College Anantnag.
Internal Sanitary / Plumbing/Water Supply And Sewerage System Up to First Manhole Of Boys Hostel at Govt. Medical College Works Anantnag
Providing And Fixing of Floor Tiles, Granite, And Applying Pop On Walls Etc. In Professors Quarters at Govt. Medical College Anantnag.
Internal Sanitary / Plumbing / Water Supply and Sewerage System Up to First Manhole Of Residential Quarters at Govt. Medical College Works Anantnag
Providing and Fixing of Floor Tiles, Granite, And Applying Pop On Walls Etc. In Principals Residence at Govt. Medical College Anantnag.
Providing and fixing of Student Benches in lecture halls and Lecture Theatre of Academic block of the Govt. Medical college Baramulla
Providing and fixing of first class Deodar wood in frames of doors/ Windows for Administrative Block at Medical College Works Baramulla.
e-NIT for SITC and CAMC of Machinery and Equipment required at Medical College, Kakryal (Group C - High End Medical Equipments)
e-NIT for SITC and CAMC of Machinery and Equipment required at Medical College, Kakryal (Group E - High End Medical Equipments)
Unbranded Foot Step for Hospitals Single Step Mild Steel 200, Unbranded Foot Step for Hospitals Single Step Mild Steel 200 mm 100 kg
mediguard Foot Step for Hospitals Single Step Mild Steel 200, mediguard Foot Step for Hospitals Single Step Mild Steel 200 mm 100 kg
Repair/Renovation of ISM Dispensary Gunthal, Surankote
Construction of Govt. Ayush Dispensary at Quilmuqam.
Upgradation of ayush dispensary at Gurah Kalyal
Constt. of Dispensary near CFC at Rajbagh
Toilet near dispensary at banjal wno 2
Repair/Renovation of AYUSH Dispensary at Muradpur
Repair and renovation of ayush dispensary Hatli
Repair/Renovation of AYUSH Dispensary at Muradpur
Construction of Govt. Ayush Dispensary at Onagam
Sanitary Complex near Dispensary Shahpur W.No 01
Constt. of CSC near Dispensary at padyari
Construction of Road OR Protection Bund with Fencing and restoration of Drain AND allied works near Health Center at Khimber
Finishing work (interior and exterior plaster) flooring for main PHC Building at PHC Kralpora
Please refer to BOQ
FENCING OF PRIMARY HEALTH CENTRE BACK SIDE AT KARHAMA. PYTT HALQA KARHAMA BLOCK HARDABOORA UNDER ADP (PRI) 2026-27
Repair / Renovation of Primary Health Centre at Jig under Aspirational Block Development Programme ( ABDP) for the year 2022-23
Repair / Renovation of Primary Health Centre at Jig under Aspirational Block Development Programme ( ABDP) for the year 2022-23
Creation of 25KVA substation along with allied HT and LT Line on ST Poles for Primary Health Centre Arnas
Fencing of Primary Health Centre Back Side At Karhama . Pytt Halqa Karhama Block Hardaboora under ADP (PRI) 2026-27
Equipments to be installed for Fire Hydrant System in PHC Prem Nagar Doda
please reffer BOQ
Construction of CSC at Health Center Ratnal Pyt Ratnal Block Bishnah under SBM for the year 2024-25. .(2nd call)
Construction of P/Path from Madrassa towards Primary Health center ward no 1l Pyt Gadi B Block Bhagwah 3rd Call
Construction of CSC at Health center PYT Sarna Block Nud District Samba under Scheme SBM for the year 2022-23
Construction of CSC at Health Center Makhanpur Pyt Makhanpur Block Bishnah under SBM for the year 2024-25.(2nd call)
P path at dugli grath from health center towards pedeslat of mool dev Pyt Dugli A Block Bhalla (PRIs Grant)
Unbranded Mild Steel Double Foot Step foot step for hospitals,, Unbranded Mild Steel Double Foot Step foot step for hospitals, Length 301-350 Millimeter
Unbranded Stainless Steel Double Foot Step foot step for hospitals,, Unbranded Stainless Steel Double Foot Step foot step for hospitals, Length 451-500 Millimeter
Unbranded Mild Steel Double Foot Step foot step for hospitals,, Unbranded Mild Steel Double Foot Step foot step for hospitals, Length 301-350 Millimeter
Unbranded Stainless Steel Double Foot Step foot step for hospitals,, Unbranded Stainless Steel Double Foot Step foot step for hospitals, Length 451-500 Millimeter
Unbranded Foot Step for Hospitals Single Step Mild Steel 200 mm, Unbranded Foot Step for Hospitals Single Step Mild Steel 200 mm 150 kg
Unbranded Mild Steel Single Foot Step foot step for hospitals,, Unbranded Mild Steel Single Foot Step foot step for hospitals, Length 501-550 Millimeter
please refer BOQ
please refer BOQ
please refer BOQ
day to day Works of SMGS Hospital Jammu