Loading…
Loading…
2,560 results • Best match
Providing installation and commissioning of 1 5 2 0 TR Split Type High Wall Air Conditioning Machines in different office rooms of the establishment of Medical Superintendent Gomati District Hospital Tepania during the year 2025 26
DEVELOPMENT OF ROAD FROM T.K. ROAD TO KALYANPUR PWD SUB-DIVISION OFFICE VIA KALYANPUR BAZAR, KALYANPUR HOSPITAL, CDPO OFFICE, KALYANPUR BRIDGE ROAD UNDER KALYANPUR SUB-DIVISION PWD (R and B) DURING THE YEAR 2026-27 ......Gr.I
FDR_Maintenance of road_ i) Abhoynagar bazar to Shantikami sangha via Vaterinary hospital, ii) Abhoynagar main road adjacent grill shop of Partha Pal via Abhoynagar Post office upto Ward Office No-11 and adjacent under Construction Sub_Division_III
Repairing, maintenance of, Air Conditioning systems, Lifts, Fire fighting etc at different site like IGM AND TMC Hospital, Quarters of various VVIPs AND VIPs, Education Department, Najrul kalakhetra, Health, law AND ICAT Department etc covered areas
Providing installation commissioning of 1 5 2 00 TR High Wall Split Type Air Conditioning System in different locations Infertility Clinic eHospital Server Room Department of General Surgery and Central Workshop of AGMC GBP Hospital Agartala
Repairing maintenance restoring CAMC of existing firefighting system including design drawing and display of fire evacuation plan in different areas of G6 Emergency Building and G2 Old buildings of IGM hospital by providing necessary spare parts2nd
Patch repairing, patch carpeting, premix seal coat, sand seal coat and construction of pucca drain etc ( portion from Ch 0 point 00 Km to Ch 0 point 85 Km)
Providing internal electrification to modified Hospital Kitchen and Medicine Store room at IPHL Lab Gomati District Hospital Udaipur Gomati Tripura
S.H- Near ANM Centre at old Hospital.
Civil construction work
Plaster work, Painting, water supply and Sanitary installation, roof treatment etc.
Installation
SH- Repairs to road by metalling, Potholes repair, Carpeting, road side drain etc. portion from Ch. 0.00 k.m to 1.050 k.m during the year 2022-23.
Internal Electrification works
Comprehensive Annual Maintenance Contract for 02 No Ducted type AC system installed at Administrative Building and 02 No Packaged type AC systems installed at NTI Building IGM Hospital Agartala West Tripura for a period of 03 years
Water Supply Scheme at Amarpur Sub-Division Hospital/SH-Construction of 1(One) No. semi permanent pump house, providing and laying distribution pipeline in/c. necessary fittings, sluice valves, hydrant post and platforms, supplying and installation o
Construction of DI and GI Pipeline work for providing potable water for 6 Nos. Reservoir for Professor Quarter, Doctor Quarter, Hostel and College Building of AGMC and GBP Hospital and other ancillary works in FY 2024-2025.
FDR Mtc. Of various road under Pecharthal Hospital section within the jurisdiction of Pecharthal Sub-Division, PWD (R and B) during the year 2020-21 SH Patch metalling, Patch carpeting bats filling, patch soling, gunny bag etc.
Providing installation and commissioning of 1.5 2.0 TR capacity Split Type High Wall Air Conditioning Machines VRF and AHU unit in the Integrated Public Health Lab IPHL at Unakoti District Hospital Kailashahar during the year 2024-25
Installation and commissioning of 1.50 T.R Air Conditioning Machines for the different rooms of pathology department of IGM Hospital disaster management block Fifth Floor along with dismantling and shifting of old existing AC machines from Old IGM
Providing, Installation and commissioning of 1.50 T.R 2.0 T.R Air Conditioning Machines for the different rooms and OPD s of Dental Unit of IGM G PLUS 2 hospital building, Agartala by replacing old ones on urgent basis
Comprehensive Annual Maintenance Contract CAMC for 01one No Machine Room Lift of 26 Twenty Six No passengers Capacity Bed Cum Passenger of G2 Lift Otis Make for 03 years at Teliamura Sub Division Hospital Khowai District Tripura
Maintenance of Amarpur Sub-Division Hospital Type-IV Quarter and SDMO Amarpur, Gomati District during the year 2025-26./SH- Dismantling Works, plastering, Brick works, Wood Works, Grill Works , Floor Tiles, Marble Works, Sanitary Fittings, Paint Wo
Comprehensive Annual Maintenance Contract CAMC for 2 nos. Elevators Otis make of different capacity, installed at Autospy Building Morgue and P.G. Hostel building of AGMC and GBP Hospital, Agartala, West Tripura for a period of 2 years
Annual repair and maintenance of Gplus7 Building (AGDC) Agartala, Gplus1 building (Oral Pathalogy) and Gplus1 (Canteen) at IGM hospital during the year 2026-27/ SH Repair to plaster, brickwork, Aluminium Work , Repair to pump motors, sanitary work
Renovation with maintenance of Internal Electrical Intallation at Sukumar Barman Memorial PHC Building Jumerdepha Sonamura Sub Division Sepahijala District Tripura
Construction of 100 Bedded Subdivisional Hospital at Sabroom South Tripura District under RIDF SH Providing internal electrification at Hospital building thereof
Brick work, Wood work, Flooring, Finishing work, Water supply and sanitation etc
Internal Electrification
Maintenance of Steel Foot bridges at (i) Bazar Bangamura para of Chailengta VC and (ii) near the house of Sambhu Das at Hospital para of Manu VC under RD Manu Division during FY 2025-26 , Dhalai District, Tripura.
Construction of single storied patient party waiting shed along with attach toilet facilities after demolishing the existing waiting shed in front of Obstetrics and Gynecology Department in FY 2024-25 under AGMC and GBP Hospital, Agartala(2nd call).
Brick Soling of following roads i Nipendra Das house to Manendra Das ward 4 ii from Uttam Nath house to Lakhan Nath house ward 4 iii from new hospital to Gobinda house ward 4 under Panisagar Nagar Panchayat
Providing installation and commissioning of 1.5 2.0 TR capacity Split Type High Wall Air Conditioning Machines, VRF and AHU unit in the Integrated Public Health Lab IPHL at North Tripura District Hospital Dharmanagar during the year 2024-25
Construction of C.C Paver Block Road from ARDD office/Vetenary Hospital to the house of Krishna Murari Shil at ward no-2 Under Sabroom Nagar Panchayat, Sabroom, South Tripura during the financial year 2022-23. (L-32.00 mtr)
Providing, Installation and Commissioning of lift for 20 persons 1360 kg capacity Stretcher Passenger lift up to G3 level at newly constructed 50 bedded MCH wing building G3 stories building at Gomati District Hospital, Tepania, Udaipur, Gomati Distr
Construction of following RCC Drains 1. from new hospital area to Chitta Nath Land ward No. 4. 2. from Cooperative Bank to Cherra ward No 4. 3. School road left side ward No 03 . Under Panisagar Nagar Panchayat.
Maintenance of Srirampur permanent bridge to gobindapur Bailey bridge via DWS intake well and road from Vetenary hospital to Laxmicherra embankment via Subal Sutradhars house near Kajirgaon school during the year 2022 23 SH patch soling metalling g
Comprehensive Annual Maintenance Contract(CAMC) of the chillers and associated equipments along with day to day operation of the entire air conditioning system installed in NTH_II, AGMC and GBP Hospital, Agartala for a period of 1(One) year
Construction of 03 Nos. SBDTW by manual means, providing and installation pump motor set, electrical panel board in/c other allied works at Quarter buildings of District Hospital under DWS Sub-Division, Santirbazar during 2023-24 (Deposit Work).
Mtc. Of Kanchanpur Hospital quarter and SDM quarter road (Length 0.840 km) under Jampui Hill Sub Division, PWD(RnB) during the year 2024-2025 SH-Pot Holes repair, Surface Drain, WBM-3,Tack coat, carpeting, seal coat etc.
Comprehensive Annual Maintenance Contract CAMC of Ducted Split type AC machines installed at Jayanti Block, Old SS Block, Old Building and College Building of AGMC and GBP Hospital, Agartala for a period of 2 years during 2023 2025
Operation and minor maintenance of 10000 GPH Capacity modified type IRP attached with 20000 ltr. Capacity modular IRP including DTW for supplying of water to the UGR of IGM Hospital for the period of 12 months (Deposit work).
Providing Installation Testing and Commissioning of Water Purifier Water Coolers Water Purifier with inbuilt Cooler at various locations of AGMC and GBP Hospital Agartala during the year 2024 25 with 1one year Comprehensive Warranty and 3 three year
Renovation of New Medical Superintendent office with Dy. Medical Superintendent and Dy. Director (Admin) office and their Establishment office and other ancillary works in New Super Specialty Building in FY 2024-25 under AGMC and GBP Hospital, Agarta
Incidental repairing and servicing of existing ROUF based Water purifiers and water coolers installed at different locations under AGMC GBP Hospital and 1 years Comprehensive AMC of the water purifier along with weekly checking of the water purifier
Comprehensive Annual Maintenance Contract CAMC of the chillers and associated equipments along with day to day operation of the entire air conditioning system installed in NTH II, AGMC and GBP Hospital, Agartala for a period of 1 year
Comprehensive CAMC for 08Eight Nos Elevator OTIS make of installed at Girls Hostel Doctor Building NTHII SS Block Dialysis Ward HOD Quarter Professor Quarter Building PG Family Quarter and College Building A in AGMC GBP Hospital Agartala Tripura
Comprehensive Annual Maintenance Contract CAMC) for 04 Nos. Elevators OTIS make of different capacity installed at Girls Hostel Building, Residential Doctor Building, NTH II and S.S Block near Dialysis ward in AGMC and GBP Hospital, Agartala, West Tr
Construction work
Construction