Loading…
Loading…
6,050 results • Best match
Axial piston pump along with the bell housing unit to mount over the existing flange for HP LP bypass system Oil supply unit Make BOSCH Equivalent
Tirupathur District Srilankan 2021-22 Construction of Housing Unit for Srilankan Refugees - (For Chinna Pallikuppam) in Minnur Panchayat (Block 29 - 30) 2 Blocks Package No.16
Providing cycle stand, herbal garden fencing and other improvement works in the Ch.P.D.E.T Hr. sec. school campus in Tondiarpet housing colony in EE(C)THC premises
FRP HOUSING WITH HAMMER FOR BREAKING WINDOW GLASS IN CASE OF EMERGENCY DRG TO ICF DRG NO : ICF/SK-4-3-082, COL-I ALT : d
Providing CC Road From Edappadi -Sankari Road to Fire Station Housing Board H/O Devannagoundanur Sankari Block In Salem District OMDGF - 2026-27 Work No.01
Custom Bid for Services - CBMC for Ashok Leyland make 3 Phase 50Hz 250KVA DG set at NTPL Housing Colony for the Period of 2024 to 2026
KBA pump Gasket bearing housing, RING 9833-1698 RADIATION RESISTANTRUBBER 085-091-36-2, SHELL 1KBA31AP001.KP05 -H05.124.171.00P, KBA pump O-ring 130-140-58-2-3 GOST 9833-1481, KBA pump O-ring 160- 170-58-2-3 GOST 9833-1473, RINGS -095-105-58-258-S, RINGS 265-275-58-2, GASKET 2KBA33AP001.KP06- H05.124.138.0658-S, RINGS 380-390-58-2, RINGS -400-410- 58-258-S, SEALING RING 1KBA31AP001.KP07H05.124.103.02P, RINGS -390-400-58- 258-S, RINGS -105-115-58-2, KBA pump Disc Spring H05.114.100.03 Assemblydrawing H05.124.100.00Cb, SEALING RING 2KBA33AP001.KP31H05.124.500.01P58-S, SEALING RING 1KBA31AP001.KP32H05.124.500.02P, GASKET 2KBA33AP001.KP36-H05.124.145.0958-S, KBA pump gasket 83x52 H05.124.141.07 Assemblydrawing H05.124.141.00Cb, KBA pump gasket 38x26 H05.124.144.06 Assemblydrawing H05.124.144.00Cb, GASKET 1KBA31AP001.KP39-H05.124.138.02, KBA pump gasket H05.124.138.03 Assemblydrawing H05.124.138.00Cb, GASKET 2KBA33AP001.KP41-H05.124.138.0458-S, KBA pump gasket 58x26 H05.124.142.07 Assemblydrawing H05.124.142.00Cb, GASKET 2KBA33AP001.KP43- H05.124.138.0858-S, GASKET 1KBA31AP001.KP44- H05.124.138.07, GASKET 1KBA31AP001.KP45- H05.124.138.05, RINGS H05.124.100.02, SHELL 2KBA33AP001.KP47 -H05.124.181.00P58-S, KBA pump Oil Thrower H05.114.102.05 Assemblydrawing H05.124.102.00Cb, KBA pump Sleeve H05.114.102.07 Assemblydrawing H05.124.102.00Cb, KBA pump Ring H05.114.102.08 Assembly drawingH05.124.102.00Cb, KBA pump Ring H05.114.102.09 Assembly drawingH05.124.102.00Cb, KBA pump Split Ring H05.114.102.12 Assemblydrawing H05.124.102.00Cb, KBA pump Key H05.114.102.13 Assembly
RESTORATION OF DAMAGED BT ROAD DUE TO IMPLEMENTATION OF UGSS AND WATER SUPPLY SCHEME AT KK NAGAR ROAD NEAR TRACK 056050R3941, MUTHAMPALAYAM HOUSING UNIT PHASE-1 5TH STREET 1ST CROSS ROAD 056050R3266, MUTHAMPALAYAM HOUSING UNIT PHASE-4 1ST STREET 1
Providing Compound Wall in front of the Scheme along with Chain Link Fencing alround the scheme boundary for the Construction of 72 TNGRHS Flats at Ariyalur South Village of Ariyalur Taluk in Ariyalur District
Restoration of Road Cut made by CMWSSB for Supplying and laying of Dedicated water main from KK nagar new head works to TNHB Residential flats at P.V. Rajamannar salai in Dn-136, Zone-10.
Providing Plank work (Fiber cement board) an Pigeon netting (Polyethylene net) for Construction of 570 Multi Storied Residential flats (228 HIG and 228 MIG and 114 MIG Nerkundram Phase II Stage I Scheme, Chennai
PROPOSAL FOR NEW MOTOR ROOM SHED AND 3 1 2 X 95 SQ.MM CABLE LAYING FOR NEWLY CONSTRUCTED SUMP AND PUMP AT GOLDEN JUBILEE FLATS, PADIKUPPAM MAIN ROAD DIVISION-90, UNIT-20, ZONE-7.
Construction of 72 HIG (Stilt 9 floors) in plot No.4415-A2 4415-B in T.S.No.624 part, Block No.2 of Mullam Village, Aminjikarai Taluk, Chennai District in Anna Nagar. Maintenance for the Period from 01.03.2024 to 31.07.2024
PULL CORD EMERGENCY SWITCH WITH 2 NC CONTACTS 16 AMPS BUILT IN CAST ALUMINUM HOUSING WITH RESETING L (Q3), HEAVY DUTY ROLLER PROTECTION SWITCH WITH SWITCHING ELEMENT 2NO+ 2NC AND CONTACTS RATING OF 16A 500V A (Q3)
Annual Maintenance works to 60 TNGRHS Flats and 5 Transit Flats at SAF Games Village Scheme Koyambedu Chennai
GI FLAT 50X6MM, GI FLATS 25X3MM
Providing for Special repair works for Existing District Armed Reserve complex and 143 Nos. Police quarters Building at PRS Campus in Coimbatore City.
Construction of 1 No. of SFO and 12 Nos. of Firemen Quarters for Fire and Rescue Services Station at Chetpet in Thiruvannamalai District.
Towards the extension of Over head line from A type quarters (A11 - A13) to Pathology Glass House at ICAR-Sugarcane Breeding Institute, Coimbatore
Construction of Additional Building for Common Kitchen to CM Breakfast Scheme at Nehru Colony near Sanitory Workers Quarters in Sivakasi City Municipal Corporation
Improvements by providing RCC cover slabs to Cover the open drainage near R5, R3, R1, Q1 and Single occupant blocks inside quarters premises
Providing Special repair works to the existing 518 Nos. of PC/HC quarters for City AR at PALAYAMKOTTAI AR CAMPUS in Tirunelveli City
Special repair works to 1 No. of SI and 32 Nos. of PC/HC Railway Quarters in Rattinakinaru at Chengalpattu in Chengalpattu District
Improvement of Old quarters Building into AEE O and M sub division office and AE O and M Town at Kodumudi 110KVSS premises
Engaging essential services to Boards Buildings at Guest House RS Puram Coimbatore District and Boards Buildings at EE Quarters Race Course Coimbatore District
Providing Strom Water Drain arrangements for the existing 1 No of SFO and 15 Nos of Firemen quarters at Virudhachalam in Cuddalore District.
Z.O.IV.C.No.B3/7817/2024 Repair and improvement work to the A and B Block Quarters at CDH in DN-43,U-10,Z-04
Laying of Cement Concrete Road at 80th Street (PTC Quarters) in Div-135, Unit-31, Zone-10 (Under T.Nagar MLA Fund 2023-24)
Sweeping and clearing of litter and dry leaves along road and building sides in Type 1 and Temporary Quarters area at Thermal Nagar
MAINTENANCE OF PARKS AT SECRETARIAT COLONY 1 ST MAIN ROAD , PTC QUARTERS PARK IN DN-194,ZONE-15 FOR ONE YEAR (365 DAYS)
ARM works to ESIC BO ,Dispensaries and Quarters at ambaram, Pallavaram, Nandabakkam, Ambattur, Ambattur estate, Avadi, Korrattur, kaladipet, Tondairpet, Georgetown, Triplicane, Redhills, Choolai
Sweeping and clearing of litter and dry leaves along road and building sides in Type 1 and temporary quarters area at Thermal Nagar
REPLACEMENT OF DEFECTIVE UNDERGROUND LT ARMOURED CABLE FROM SS12 TO FEEDER PILLAR BOX NEAR VI - 2 AND VI - 3 QUARTERS IN AVNL ESTATE
ZONAL VI CIVIL MAINTENANCE WORKS IN CHENNAI PORT AUTHORITY AT TRUST VILLA QUARTERS FOR TWO YEARS IN EX(C) NORTH DIVISION II AREA
Construction of New buildings for Fire and Rescue Services Station and quarters for 1 SFO and 12 Firemen at Thalainayaru in Nagapattinam District
Construction of 100 Nos of PC/HC quarters (stilt plus 13 floors) at Singanallur (Vasantha Mill) in Coimbatore City Government of India Scheme.
CONSTRUCTION OF COMBINED COURT BUILDING CONSISTING OF FIVE NUMBERS OF COURTS AND FIVE NUMBERS OF JUDICIAL OFFICERS QUARTERS AT SATHYAMANGALAM IN ERODE DISTRICT
Maintenance and Repairs and Providing Reverse Osmosis and UPS to Commissioner Quarters and Maintenance and Repairs to Municipal Health Department in Ambur Municipality
Sweeping and clearing of litter and dry leaves along road and building sides in Type 1 and temporary quarters area at Thermal Nagar
Improvement works by carrying out renovation civil works to the single tenement in 2P Type Quarters at 110/11 KV Kinathukadavu Sub Station
Sweeping and clearing of litter and dry leaves along road and building sides in Type 1 and temporary quarters area at Thermal Nagar
Sweeping and clearing of litter and dry leaves along road and building sides in Type 2,3,4 and 5 Quarters area at Thermal Nagar
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF RGBW PIXEL DOT TYPE FACADE LIGHTING AT CMRL METRO HEAD QUARTERS(MetroS), NANDANAM, CHENNAI INCLUDING COMPREHENSIVE AMC
Extension of machine room in patient attender waiting hall in government District Head quarters Hopsital in ward no8 at Kumbakonam City Municipal corporation
ADDITION / ALTERATION TO EXISTING JOINERIES OF CERTAIN QUARTERS AND POST CONSTRUCTION ANTITERMITE TREATMENT TO BUILDINGS IN NOVRA-I UNDER AGE (I) NAVY CHENNAI
Annual Maintenance works to 12 nos. of IGP ADGP quarters at Wallajah Road in Chennai city for the Period from 01.06.2026 to 31.03.2027
NCTPS II Civil Maintenance Circle Civil Project Division Providing M.S.Grill gate in front of main door of Q type quarters at Vallur Camp
Providing special repair works to the existing 1 No. of SI and 8 Nos. of PC/HC Quarters at Kedar in Villupuram District.
GENERAL FUND_Repair and Maintances Work for Commissioner Quarters Building at Kasthuri Bai Hosptial Near in ward no 23 at Karur City Municipal Corporation.
Construction of UG Sump and Chain link fencing at A-2 Type V Quarters of CASFoS at Coimbatore. (SH: Civil and Electrical Work)