Loading…
Loading…
1,068 results • Best match
Replacement of damaged condensers and compressors, cleaning of suction air filters of AHUs, chemical cleaning of condenser tubes of AC Package units of AC plant / Stage-I/Dr.NTTPS during the year 2022-23.
Replacement of damaged condensers and compressors, cleaning of suction air filters of AHUs, chemical cleaning of condenser tubes of AC Package units of AC plant / Stage-I/Dr.NTTPS for the year 2023-24
Comprehensive Maintenance to the Air Conditioning system (VRV for 05 floors) located in the O/o Engineer in chief R and B New HoDs office building at MG Road Vijayawada for the year 2026 27
Comprehensive Maintenance to the Air Conditioning system (VRV / Split) in the premises of Raj Bhavan at Governorpet, Vijayawada for the year 2020-21 i.e., 01.04.2020 to 31.03.2021 (12 Months)
Construction of Office Building (Basement G 5 Storeyed) including Internal Water Supply, Sanitary installations, Drainage IEI & Fans, Fire Fighting with Wet riser system, Automatic Fire Alarm System, Mechanical Ventilation, Lifts, UPS Backup, AV ... System, VRV &VRF ... & VRF AC ...
Construction of 17 Court Building complex at Vizianagaram Andhra Pradesh including water supply sanitary installations drainage IEI Fans water coolers UPS System Fire Fighting with wet riser system Addressable Fire Alarm System 7 Nos 13 Passenger ... lift VRF VRV AC ...
Supply of 20TR Ductable package units, ITC of 20TR Package unit, Pressure testing and Vaccumming and Nitrogen flushout, Refrigerant Charging entire system, MS Structure Modification for ODU Mounting Arrangement, Dismantling of existing machine, Refrigerant Piping and Modification, Communication cable between IDU and ODU, Canvas connection with Zip on machine outlet, GI 22Gauge Duct Mouth Connection modification, Acousting insulation 15 mm thick for the mouth connection modification piece, Lifting Shifting and Positioning of the machines, Comprehensive Maintenance AFTER COMPLETION OF WARRANTY 1ST YEAR, Comprehensive Maintenance AFTER COMPLETION OF WARRANTY 2ND YEAR, Comprehensive Maintenance AFTER COMPLETION OF WARRANTY 3rd YEAR, Comprehensive Maintenance AFTER COMPLETION OF WARRANTY 4TH YEAR, Comprehensive Maintenance AFTER COMPLETION OF WARRANTY 5TH YEAR
COMPREHENSIVE MAINTENANCE TO CENTRAL PACKAGE AC PLANTS COOL COLD ROOMS AND CONNECTED ACCESSORIES INSTALLED AT NAD V MO V BV YARD INS VISWAKARMA CQAE ALONG WITHCERTAIN INSTALLATIONS AND CONNECTED WORKS UNDER GE U-II VISAKHAPATNAM
Supply , Installation , Testing and Commissioning of 3 nos of 5.5 TR capacity Package AC Floor mounting conditioner system for Control Floor at Dam Power House pertaining to Indoor section , Operation sub division , Dam Power House
Supply , Installation , Testing and Commissioning of 3 nos of 5.5 TR capacity Package AC Floor mounting conditioner system for Control Floor at Dam Power House pertaining to Indoor section , Operation sub division , Dam Power House
Supply, Retro-fitment and commissioning of CAB MOUNTED COMPACT HVAC UNIT WITH BUILT IN INVERTER (1.75 TR cooling capacity) for HHP diesel electric locomotive.
Providing IEI,Wiring and VRF/VRV air conditioning system in the new director office chamber and PA room, replacement of damaged cables of assorted sizes laid from substation/feeder pillar to old boys hostel, library building and dismantling of existing LT over head line and connecting with LT UG cable,providing AB switch at switch yard with accessories etc.,at SRFMT&TI, Garladinne, Ananthapur Subwork/Packages: Replacement of damaged cables of assorted sizes laid from substation/feeder pillar to old boys hostel,library building and dismantling of existing LT over head line and connecting with LT UG cable,replacement of damaged AB switch at switch yard with accessories etc.
Replacement, rectification and cleaning of various equipment pertaining to ECS and AC Package units of AC Plant / Stage-I in CAM Division/Stage-I/Dr.NTTPS as and when required during the year 2021-22
Replacement, rectification and cleaning of various equipment pertaining to ECS and AC Package units of AC Plant / Stage-I in CAM Division/Stage-I/Dr.NTTPS as and when required during the year 2021-22
AMC of Ductable Air Conditioning units 11TR capacity available in Vengamamba Meeting Hall in SVETA building, of AE-II section, in ESD-II Tirupati for the year 2019-20. (Part-A).
AMC for Ductable Air Coinditioning units 11TR capacity available in vengamamba meeting hall in SVETA Building , of AE-II section in ESD-II Tirupati for the year 2019-20 (Part-A)
Comprehensive maintenance to the air conditioning system(VRV/split) in the premises of Hon'ble Chief Ministers camp office at Governorpet Vijayawada for the period from 01.04.2018 to 31.03.2019(4th call)
Comprehensive maintenance to the Air conditioning system(VRV/Split) in the premises of Hon'ble Chief Minister's camp office at Governorpet Vijayawada for the period from 01.04.2017 to 31.03.2018(4th call)
Providing Comprehensive Maintenance to Air conditioning with VRV system for the AP Legislative Council in the premises of Public gardens, Hyderabad for the period from 01.04.2016 to 30.09.2016. 3rd call
Comprehensive maintenance to the air conditioning system(VRV/split) in the premises of Hon'ble Chief Ministers camp office at Governorpet Vijayawada for the period from 01.04.2018 to 31.03.2019(3rd call)
Facility Management Services - LumpSum Based - Commercial; Provision of GI Ducting with GI damper and hoods with filter and grills (as per scope of work); Consumables to be provided by service provider (inclusive in contract cost)
Operation & Maintenance of Centralized Air conditioning system available at Emergency OT, OTs-1 to OT-7 & Fresh air AHU unit etc., in new OPD Building, BIRRD Hospital, Tirupati for a period of one year
Operation & Maintenance of Centralized Air conditioning system available at Emergency OT, OTs-1 to OT-7 & Fresh air AHU unit etc., in new OPD Building, BIRRD Hospital, Tirupati for a period of one year
Providing Air Conditioning with VRF System to Police Head Quarters at 6th Bn, Mangalagiri of Guntur District - Sub Work: Supply and Fixing of Air conditioning in LAN Server room.
REPAIR / REPLACEMENT OF BER PACKAGE TYPE AC PLANT INCLUDING OTHER B/R CONNECTED WORKS AT BLDG NO. 17 A (MAT) AND BLDG NO. 17 RJE (MAT) OF NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) DM VISAKHPATNAM
Custom Bid for Services - CHEMICAL CLEANING OF WATER RESERVIOR HEAT EXCHANGER CHILLER EVAPORATORS SHELL TUBE COOLING WATER STORAGE TANKS AND COOLING SYSTEM PIPE LINES AT ENERGY BLOCK
AMC of Ductable Air conditioning units in different capacitites available in SVETA Building, SPWDC and SPWPC etc., of AE-II section in ESD-II, Tirupati for the year 2019-20 (Part-B)
Annual service contract for the ductable AC plants and exhaust system available in ESD-PAT, TTD, Tirupati for the period of one year i.e., from 01-04-2020 to 31-03-2021
Supply, Installation, Testing and Commissioning of Ductable split AC Units (Balance work of Centralised AC System), Kitchen hoods, UG Cables, Cable Trays etc., for Sri Padmavathi Kalyanamandapams and Sri Srinivasa Kalyanamandapams, Tirupati
Construction of 17 Court Building complex at Vizianagaram, Andhra Pradesh including internal water supply ,sanitary installations, drainage, IEI & Fans ,Water Coolers, UPS System, Fire Fighting with wet riser system, Addressable Fire Alarm system,7 ... Lift, VRF /VRV ... VRF/ VRV AC ...
Providing HVAC System to the Staff Halls/work stations to all the Department offices in all 4 floors (G+1+2+3) of Integrated Collectorate Complex Building at Srikakulam (Indoor & Outdoor Power cables, Panel boards, Transformers & APEPDCL Charges).
Providing HVAC System provisions to the Staff Halls/work stations to all the Department offices in all 4 floors (G.1.2.3) of Integrated Collectorate Complex Building at Srikakulam (Internal Copper piping up to HVAC Duct wiring for indoor Units Drain piping Distribution Boards Inside Armoured cables from Each Block Electrical Rooms to Panel Rooms).(2nd call)
Annual maintenance for ductable AC system available in Srivari Sannidhi, Bangaru Vakili, Kalyanotsavams mandapam, Parakamani hall, LPT counters, flower storage etc, in Sri TT of ESD-North, Tirumala for the year 2019-20
Supply delivery, installation, testing and commissioning 02Nos of 11TR Ductable indoor & 04 Nos of outdoor AC units at Town Planning CCP Chamber, Town Planning Section, DCP & ACP Chambers in GVMC main office building.
AMC of Ductable Air Conditioning units available at New Parakamani at AE-I section in ESD-II, TTD, Tirupati for the period of three(3) years 2023-24 to 2025-26 (Part-B)
AMC of Ductable Air Conditioning units available at New Parakamani at AE-I section in ESD-II, TTD, Tirupati for the period of three(3) years 2023-24 to 2025-26 (Part-B)
Annual maintenance for ductable AC system available in Srivari Sannidhi, Bangaru Vakili, Kalyanotsavams mandapam, Parakamani hall, LPT counters, flower storage etc, in Sri TT of ESD-North, Tirumala for the year 2019-20
Providing HVAC System (Heating Ventilation Air Conditioning System) to Zonal Office Building with Laboratory Facility for A.P Pollution control Board at Vijayawada City of Krishna District
Supply & Fixing of VRV X Air Conditioning System (Make: Daikin / Blue Star / Carrier or any other make of ISI Brand) to District Finance Office Building at Visakhapatnam (v) & (M) in Visakhapatnam District
Comprehensive Maintenance service contract of centralized air conditioning system available at emergecy OTs and fresh air AHU unit etc., in new OPD Building BIRRD Hospital, Tirupati for 3 (Three) years from 2023-24 to 2025-26
MANNING AND OPERATION FOR DG SET AT ALD / TECH BLOCK, LAKSHA SQUADRON, RAQAS COMPLEX, ADM BLOCK, WATCH TOWERS, AC PLANT AT KAMOV BUILDING AT INS DEGA UNDER AGE E/M NO-II OF GE(U-I), VISAKHAPATNAM
REPAIR / REPLACEMENT OF BER PACKAGE TYPE AC PLANT INCLUDING CONNECTED B/R WORKS AT BLDG NO. 38 (EXCHANGE), BLDG NO. 43 (LAB) AND BLDG NO. 29 (TEST HOUSE) OF NAVAL DOCKYARD VISAKHAPATNAM UNDER GE (I) DM VISAKHPATNAM
MANNING AND OPERATION TO COLD/COOL ROOM CENTRAL AC PLANTS AT BV YARD, TRS II, CQAE AC PLANTS AT NAD INCLUDING PERIODICAL PREVENTIVE MAINT OF PACKAGE TYPE ACs OF BVY, INS VISWAKARMA AND NAD UNDER AGE E/M NO.II OF GE(U-II) VISAKHAPATNAM
Providing Comprehensive Annual Maintenance Contract to VRV and Split based Mitsubishi Make Air Conditioning Units installed in the buildings of the High Court Main building and Annexe building of Andhra Pradesh Nelapadu Amaravati
Providing Comprehensive Annual Maintenance Contract to VRV and Split based Mitsubishi Make Air Conditioning Units installed in the buildings of the High Court (Main building and Annexe building) of Andhra Pradesh Nelapadu, Amaravati
Providing Comprehensive Annual Maintenance Contract to VRV and Split based Mitsubishi Make Air Conditioning Units installed in the buildings of the High Court Main building and Annexe building of Andhra Pradesh Nelapadu Amaravati
Removal & re fixing of aluminum insulation sheeting on hot venture ducting of mills, Hot air bus ducts, Inter connecting duct over APH and ID fan to Chimney areas of Boiler in unit-7 during the year 2021-22.
Non Comprehensive Annual Maintenance Contract (N-AMC) of HVAC System (Low Side) with Spares for a period of One (01) year for Main campus of IIM Visakhapatnam
Construction of Office Complex in the site of old Municipal Guest house at Kirlampudi Providing Electrical Services, CCTV Network, Water Supply, Fire Fighting services, HVAC services etc.,
"Construction of Office Complex in the site of old Municipal Guest house at Kirlampudi" Providing Electrical Services,CCTV Network, Water Supply, Fire Fighting services,HVAC services etc.,