Loading…
Loading…
3,177 results • Best match
Recirculating chiller (Q3) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6337050 Dated : 27-06-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Supply Installation Testing and Commissioning of PLC and HMI units and allied work for upgradation of HVAC control system at new EDL building in ARAI Kothrud
Recirculating chiller (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2026/B/7158530 Dated : 28-01-2026 Bid Document 1/5 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Providing Supplying and Commissioning Reverse Osmosis System 1000 LPH Chiller with Shed and Drilling Bore well With E. e. Submersible Pump and necessary Work at Khandali, Tal- Mohol
AS PER TECHNICAL SPECIFICATIONS IN ANNEXURE - A ATTACHED. CHILLER MACHIN 2 TON 12 C-300 LT HR - 15 C-500 LT HR. 14TH. FIANANCE COMMISSION YEARS - 2020-21.
PROVIDING AND INSTALLATION OF 1000LPH RO UNIT WITH INCLUDING COST OF CHILLER ATM MACHINE CONTRUCTION OF 180SQFT TIN SHED FENCING AT GP BOPAPUR TQ ZARI JAMANI DIST YAVATMAL
Providing VRF Type Airconditioning Gsystem for Hall and Ding area at New Officical Residence Bungalow No 19 of Honble High Court Judtges at Nyaymurti Nagar Jalna Road, at Aurangabad Dist. Aurangabad
Providing Internal Electrical Installation,VRF Type Air Conditioning System, FireFighting, 10 Passenger Capacity Electric Lift, Submersible water pump Campus Lighting for Newly Proposed Niyojan Bhavan Building G1 at Jalna Dist. Jalna
8611 SPECIAL REPAIRS/ RENEWAL OF VARIABLE REFRIGERANT FLOW (VRF) ACS IN REPLACEMENT OF BER ACS AT BANQUET/ EXAMINATION HALL (APRAMEYA) ALONG WITH OTHER CONNECTED ACCESSORISES AT AFMC UNDER GE (CENTRAL) PUNE
Providing VRF Air-Conditioning System with Electrical Installation for the Lecture Hall of Physiology Department at ground floor of Physiology Bldg., in J J group of Hospitals compound, Byculla, Mumbai - 400008
Est. No.SR/CESD/GT/-79/2073/2025-26 Providing Comprehensive Annual Maintenance contract For VRF Air Conditioning System in New Building at Police Commissioner of Mumbai office at Croferd Market, Mumbai
Est. No. MESD/MS/8303/2025-26 Providing Addition, Alterations, Repairs and Renovation to Electrical Installation, VRV System, Fire Fighting Alarming System to Studio at Ground Floor, Main Building, Mantralaya, Mumbai. (2nd Call)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Up gradation and Augmentation of DGME Auditorium at DER Building of Naval Dockyard Mumbai; HVAC; Service Provider
Civil Work including Electrical work, Sanitary AND Plumbing, Water Supply, Landscaping, HVAC, Fire-Fighting including Fire Protection, Lift, STP/ ETP, MGPS, MOT and other Allied Works etc
Civil Work including Electrical work, Sanitary and Plumbing, Water Supply, Landscaping, HVAC, Fire-Fighting including Fire Protection, Lift, STP/ ETP, MGPS, MOT and other Allied Works etc
Providing Addition Alteration in HVAC System in the Auditorium Hall at 7th floor of Administrative Building at grant Govt.Medical College Sir J.J.Group of Hospital Compound, Byculla, Mumbai.
Civil Work including Electrical work, Sanitary and Plumbing, Water Supply, Landscaping, HVAC, Fire-Fighting including Fire Protection, Lift, STP/ ETP, MGPS, MOT and other Allied Works etc.
Supplying Installing And Commissioning FRP Urinal Cabin, Supplying Installing And Commissioning Offgrid solar panel, Supplying Installing And Commissioning Water Purify 25L with Chiller 20L, Plastic chair, Plastic modular chair
Est. No. SR/MESD/MS/1015/2026-27 Providing addition,alterations and repairs to Chiller water type cassettes at Mantralaya Main Bldg. Ground Floor VIP Lobby at, Mantralaya, Mumbai
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Retubing of tube bundle of exchanger E-514 (Make up gas chiller) of Ammonia plant; Service Provider
Est.No. SR/MESD/MS/ 4047/2023-24 .Supply,Installation,Testing Commissioning of VRF system ,AV system, Conference System with necessary Electrical Installations to War Room at 7th floor, Main Building, Mantralaya, Mumbai.
Est. No. OW/NVB/DB/5831/2025-26 Providing re-erection of exisitng VRF based air conditioning units in Hon CM office room no 036,037,038,039 of Tower Building in Vidhan Bhavan Mumbai
Est.No.SR/NVB/DB/9506/2025-26 Providing re-erection of existing VRF based air conditioning units in west wing ground floor office of Tower Building room no 035 in Vidhan Bhavan Mumbai.
UNDER - 15Th Finance Commission (Panchayat Samiti Level)
UNDER - 15th FINANCE COMMISSION (G. P. LEVEL)
UNDER - 15th FINANCE COMMISSION (G. P. LEVEL)
UNDER - 15th FINANCE COMMISSION (G. P. LEVEL)
UNDER - 15Th Finance Commission
Est. No. CR / MH / Hill / 2411 / of 2021-22 Providing fully comprehensive maintenance contract for Ms. Daikin make VRV Air conditioning System installed at Honable Chief Justice House, Malbar Hill, Mumbai. (for 36 months)
Est. No. SR/CESD/GT/-154/2148/2025-26 Providing Dismantling and re-locating of VRV AC units on terrace in old bldg of Commissioner of Police, Mumbai at L.T. Marg, Mumbai. (3rd Call)
Est. No. CR / MH / HL / 3668 / of 2025-26 Providing annual fully comprehensive maintenance contract for VRV Air-conditioning System installed at the cabinet hall in GB Varsha, Malbar Hill, Mumbai. For 3 Years
Est. No. CR/MESD/MS/1021/2026-27 Providing Fully comprehensive maintenance contract for 42HP VRV type AC system installed in Hon State Minister offices on Mezanine floor, main building Manttalaya, Mumbai.(3 Years)
Providing Fully Comprehensive aintenance of 4 Nos. 8.5 TR capacity Air cooled type Condensing Units Air Conditioning system with AHU installed for N.I.C.U. on first floor of Balaram Building at Sir J. J. Group Hospitals compound, Byculla Mumbai.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; Repair/Replacemet of AC plant ducts and allied works of ACMI (2*36 tr & 1*36tr) at 2 Wing at AF Stn Pune; Service Provider
Est.No.131557/2020-21 Prov.Self Contained Water Cooler for HOT and COLD water, Ducting with accessories for Training Hall an Kitchen Section at Lower Ground Floor at Dist Covid Hospital at Shri Chhatrapati Shivaji Maharaj Museum at Satara Dist.Satara
Repairs, Operation maintenance of electrical installations and Comprehensive maintenance of HVAC installations at 2nd Floor office in Nirmal Building, Nariman Point Mumbai for the period of 3 years.
Est. No. Repairs/NVB/DB/7170/204-25 Providing power supply distribution with DG changeover to Data Centre HVAC and UPS load in NavinVidhan Bhavan Mumbai Bhavan Mumbai.
PROVIDING AND INSTALLATION OF 1000PH RO WITH ON GRID SOLAR POWER PACK SYSTEM INCLUDING COST OF CHILLER,ATM MACHIN AND CONSTRUCTION OF 180SQFT TIN SHED AT YAWALI TQ DIST. YAVATMAL
PROVIDING AND INSTALLATION OF 1000PH RO WITH ON GRID SOLAR POWER PACK SYSTEM INCLUDING COST OF CHILLER,ATM MACHIN AND CONSTRUCTION OF 180SQFT TIN SHED AT KAREGAON TQ DIST. YAVATMAL
1) Implementation Of Solar Energy Based Dual Pump Mini Water Supply Scheme And 2) Providing, Supplying, And Commissioning Of Reverse Osmosis System, ATM With Chiller At. Umbare Dahigaon Tal. Malshiras
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - hospital; SITC of FEAS with thermal sensor for electrical panel for Animal House Chiller plant in KEM hospital; Service Provider
H21051 of 2026-27 Providing VRF Air conditioning System with Electrical Installation for the lecture hall of Anatomy Department at Ground floor of Anatomy Bldg., in Sir J.J.Group of Hospitals compound , Byculla , Mumbai.
Est. No. CR / MH / Hill / 2412 / of 2021-22 Providing fully comprehensive maintenance contract for Ms. Daikin make VRV Air conditioning System at Honble Chief Ministers residence GB Varsha, Malbar Hill, Mumbai. (for 36 months)
Est No SR/MESD/MS/ 4045 of 2023-24 Providing Fully comprehensive maintenance contract for 42HP VRV type AC system installed in Hon State Mainter offices on Mezanine floor, main building Manttalaya, Mumbai.(3 Years)
Recirculating chiller (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Bid Number ( ) : GEM/2024/B/5717227 Dated : 01-01-2025 Bid Document 1/6 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Est.No. OW/NVB/DB/5835/2025-26 Providing renovation to lighting, wiring, switchgear,cables and air conditioning at Hon Deputy Speaker Office in room no 018,019,020 ,001 providing television units and repairs to existing ducting in room no 001 House
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; Total price including all applicable taxes and duties for MS Patch Work for rubber lined tanks or vessels and ducting in PAP at RCF Trombay Unit AS P..
UNDER - 15 Th Finance Commission
UNDER - ANUSUCHIT JATI NAVBHOUDHA GHATKACHYA WASTICHA VIKAS 2022-23
UNDER - 15Th Finance Commission (G. P. Level)