Loading…
Loading…
2,005 results • Best match
RCC DRAIN CONSTRUCTION
AS DESCRIBED IN UPLOADED BOQ
Construction of Office Building for Central Excise & Custom, DRI, CBN, NACIN, etc. including water supply, sanitary installation, Fire Fighting System, Fire Alarm, Sub-Station, DG Sets, Lifts, HVAC & UPS at Vibhuti Khand, Gomti Nagar, Lucknow (UP). SH: Horticulture work (Part-II)
C/o 1018 Seater Girls hostel i/c water supply, sanitary installation, internal EI, Fire fighting, fire alarm system, HVAC, Lift, UPS, sub-station, & DG set at Mahila Maha Vidayalaya BHU, Varanasi (SH-Renovation of Fauclty room at department of chemistry.
Construction of administrative block and store block including internal EI and fans, fire fighting fire alarm VRV system sub-station Development work and Horticulture work at RTC, CRPF Amethi (UP). (SH:- Providing and fixing of illuminating sign boards for all buildings at RTC, CRPF Campus, Trishundi, Amethi (U.P.)
Construction of Earth Science Lab Building, ground plus six storey including plumbing, sewerage system, internal and external Electrical works, Fire fighting, Fire Alarm, Public address system, Building Management system, Lift, HVAC all complete at IIT Campus, Kanpur Subwork/Packages: SITC of 2x160 KVA UPS
Industrial Refrigerator, Chiller and Deep Freezer Experience Criteria 1 Year (s)
Industrial Refrigerator, Chiller and Deep Freezer Experience Criteria 1 Year (s)
Industrial Refrigerator, Chiller and Deep Freezer Experience Criteria 1 Year (s)
PROVIDING ELECTRICAL AND MECHANICAL WORK SERVICES FOR OFFICE BUILDING OF INCOME TAX DEPTT AT VAISHALI GHAZIABAD SH1 CONVERTING OFF GRID 12 KWP SOLAR PHOTO VOLTAIC POWER PLANT INTO ON GRID SH2 SITC AND REPLACEMENT OF AHU AND ACCESSORIES SH3 MISC WORKS SH4 REFILLING OF FIRE EXTINGUISHER SH5 REPLACEMENT OF BATTERIES SH6 DISMANTLING AND LESS CREDIT
DISMANTLING OF EXISTING DEFECTIVE 05x11.50 TON AC PLANT INDOOR AND OUTDOOR UNIT AND PROVIDING, INSTALLATION OF 05X11.50 TON AC PLANT INDOOR AND OUTDOOR UNIT WITH ALL ASSOCIATED WORK AT 400KV S/S SULTANPUR UNDER 400 KV SUBSTATION DIVISION SULTANPUR
Supply/ SITC/ Item of Works, on urgent basis for the works of Conversion of 2 Floor existing room in TOR U.G Tank, Syntax water tank, Road and External drainage, Refurbishment of HVAC System Installed for Making Function Etc. at DCBO Colaba.2nd cal
REPAIR/MAINT OF FIRE FIGHTING, FIRE ALARM AND STP AND PUMPS, HVAC SYSTEM OF PARACHUTE BLDG AND REPAIR/MAINTENANCE OF INTERNAL ELECTRIC WITH FITTING AND FIXTURE AND MISC E/M WORKS AT PARACHUTE BLDG AND AUDITORIUM AT AGRA UNDER GE (I) RnD DELHI
C/o New Annex building (G plus 4) and renovation of existing building of Dr. Iqbal Gurtu Hostel including water supply, sanitary installation, internal electric installations, fire fighting, fire alarm system, CCTV, lifts, DG set, UPS system and HVAC at BHU, Varanasi.
Construction of Class/A.V. Room i/c internal EI and Fans, Fire Fighting , Fire alarm, VRV System, Development Work &Horticulture Work for RTC, CRPF at Amethi (UP). (SH:- Construction of Bore well platform with RCC Column & I-section beam and other civil miscellaneous works in the campus of RTC Amethi.)
Construction of office building i/c IEI and Fans, Firefighting Fire alarm, Sub Station, CCTV, Lift, DG set, UPS, solar PV PGS, VRV, LAN, IP Based EPBAX and Horticulture work for KVIC at Gorakhpur. SH: Balance work at the Risk and Cost of Contractor M/s Shree Ji Infratech. Subwork/Packages: One
Renovation of Auditorium at Harivansh Rai Bachchan Cultural Center, University of Allahabad, Prayagraj comprising of Architectural and interior planning, Wall Paneling, False Ceiling, Stage Flooring, Auditorium chairs etc. including electrical works ... Lighting, VRF Air ...
Construction of 2nd and 3rd floor (Vertical Extension) in the existing building (G Plus 1) of Department of Bio Chemistry, Institute of Science, BHU including Water supply, Sanitary installation, Internal Electric installation, Fire fighting, Fire ... system, HVAC , ... system, HVAC , ...
Display Cabinet (Q3), Ice Candy Plant (Q3), Air- conditioning, direct system. (Q3), Air-conditioning, indirect system. (water cooled) (Q3), Package A/C (Q3), CAR AC tutorial model (Q3), Bus AC tutorial model (Q3), VRF/VRV UNIT 2.5 TR (Q3), Automatic ice cube m/c (Q3), Walk in cooler PUF insulated for cold room 6X4.5X8 cft. (Q3), Absorption system (Q3)
Domestic Refrigerators-IS 1476 (Q3), Industrial Refrigerator, Chiller and Deep Freezer (Q3)
Duct Air Cooler, Platform Stand, Canvass connections, Fiber Ducting, Grills Diffusers, Electric wiring 2 5 mm, Electric Control Pannel
printer for brake alignment, kpl tester with printer, hvac leakage detector
Supply Installation Testing and Commissioning SITC of CVT and Electroniccards for York Chillers installed at NTPC EOC and EOC Annexe Sector 24Noida
Renovation of room no. 701-702 and 703-705 Transport office pool AC plant room P/L vitrified tiles in store block and 9th floor B-block and P/F calcium silicate false ceiling in room no. 280 and conference hall and 2nd floor i/c electrical installation in GSI office building at Aliganj Lucknow (UP) Subwork/Packages: Main Work
Construction of 1018 Seater Girls Hostel including water supply, sanitary installation firefighting system, HVAC, Lift, UPS,Sub station and DG set at Mahila Maha Vidayalaya BHU, Varanasi.(SH Hiring of taxi for site visit for CPWD Electrical Office of BHU Project Electrical Division CPWD).
Construction of 350 Bedded Hostel (GRIHA 5 STAR RATED) including IEI, Down Comer,fire Alarm System, Sub-station, DG Set, Lift, Solar, HVAC System,CCTV etc. at NSI Kanpur UP( SH Sub Division-III 01 No MTS & O/o, EE-K, 01 No Sweeper)
Construction of Office Building for Central Excise and Custom, DRI, CBN, NACEN etc including water supply, sanitary installation, internal electrical installation, Fire Fighting System, Fire Alarm, Sub station, DG Sets, Lifts, HVAC & UPS at Vibhuti Khand, Gomti Nagar, Lucknow (SH:- SITC of LED Signage board)
Consruction of new building (G plus 4) and renovation of existing building of Aiyer Boys Hostel at BHU, Varanasi including water supply, sanitary installation, internal electrical installations, fire fighting, fire alarm system, CCTV, Lifts, DG set, ... system, HVAC and ...
Round the clock operation in three shift and Routine maintenance of 2X20 ton Ac plant at HOPS,Obra
Overhauling of air conditioning ductable units at 220 kV substation Sector-129 Noida under ETD-I Noida
Renewal of CAMC of the VRF AC installed at Honble C.J Court, Chamber, Ante Room, P.S. Room, Conference Hall, Honble C.J. Library, Court No. 4-7, 9, 12-17, 21, 29, 32-37, 41-44, 45-55, court no. 8, 18, 19 and 20 and Old A.G. Bldg. As per NIT
Renovation of Auditorium at Harivansh Rai Bachchan Cultural Center, University of Allahabad, Prayagraj comprising of Architectural and interior planning, Wall Panelling, False Ceiling, Stage Flooring, Auditorium Chairs etc. including Electrical Works ... Lighting, VRF Air ...
Please refer Tender documents.
Industrial Refrigerator, Chiller and Deep Freezer, Drinking Water Cooler - as per IS 1475
Industrial Refrigerator, Chiller and Deep Freezer Experience with Government Required 3 Year (s)
Industrial Refrigerator, Chiller and Deep Freezer Experience with Government Required 3 Year (s)
Industrial Refrigerator, Chiller and Deep Freezer Experience with Government Required 9 Year (s)
Construction of Composite Regional Center i c IEI & Fans PA System CCTV Fire Alarm System Fire Fighting system Sub Station VRV System Lift Solar Photo Voltaic panel & UPS System of NIEPMD at BRD Medical College Gorakhpur UP SH SITC of LED Signage board for main entrance and letter signage on terrace for CRC Gorakhpur.
REPAIR MAINT OF HVAC SYSTEM FIRE FIGHTING FIRE ALARM AND STP AND PUMPS OF PARACHUTE BLDG AT ADRDE TECHNICAL AREA AND DAY TO DAY MAINTENANCE OF BR AND EM NATURE OF WORK IN ADRDE TECHNICAL COMPLEX RAKSHA VIHAR VIGYAN VIHAR PH I AND II AND ADRDE COLONY
RMO of General Pool Office Accommodation including water supply, sanitary installation, internal electrical installations, fire fighting system, fire Alarm, Sub station, DG Sets, Lifts and Mechanical Ventilation at Fazalganj, Kanpur (UP) (SH:- ... TR HVAC System) ...
C/o Office Bldg. for Central Excise and Custom, DRI, CBN, NACEN etc i/c water supply, sanitary installation, internal Electrical Installation, Fire Fighting System, Fire Alarm System, Sub station, DG Set, Lift, HVAC and UPS at Vibhuti Khand Gomti Nagar, Lucknow. (SH:- SITC of BMS System)
shell u tube heat exchanger (Q3), Net Gas Chiller (Q3), floating head assembly (Q3)
Industrial Refrigerator, Chiller and Deep Freezer Average Turnover (Last 3 Years) 2 Lakh (s)
Industrial Refrigerator, Chiller and Deep Freezer Average Turnover (Last 3 Years) 1 Lakh (s)
R O WATER PURIFIER HEAVY DUTY (Q3), WATER COOLER WITH CHILLER HEAVY DUTY (Q3)
Design, Installation, Testing and Commissioning of 1000 LPH RO Plant With Water Chiller System
Industrial Refrigerator, Chiller and Deep Freezer Bidder Turnover (Last 3 Years) 5 Lakh (s)
Industrial Refrigerator, Chiller and Deep Freezer Bidder Turnover (Last 3 Years) 11 Lakh (s)
C/o Regional Institute of Ophthalmology (G plus 5) including Internal E.I., Fire Fighting System, Fire Alarm System, Lift, DG Set, UPS System and HVAC at Sir Sunder Lal Hospital, IMS, BHU, Varanasi (SH: Miscellaneous Works of providing and fixing ... and HVAC at ...
SITC of Air-Cooled, Screw Chillers with Microprocessor based Control Panel Bidder Turnover (Last 3 Years) 40 Lakh (s) Experience Criteria 3 Year (s)